| 1 | CRE - RE - VALIDATION |
| 2 | CEILING SUSPENDED LAMINAR AIR FLOW UNIT (CLAF) - RE - VALIDATION |
| 3 | Re-validation of Ceiling Suspended Laminar Air Flow Unit(s) (CLAF) already installed at site. Prior to testing, the contractor shall conduct a thorough visual inspection of the installed units for structural integrity, fastener tightness, suspension arrangement safety, filter housing seal condition, electrical wiring integrity, earthing continuity, blower condition, general cleanliness and the unit to be serviced where required. The units shall be powered up and checked for correct direction of rotation and absence of abnormal noise or vibration. Testing shall be carried out as per ISO 14644-3 / WHO GMP and other applicable guidelines. The testing programme shall minimum include: (1) Air velocity test. 2)Filter integrity test. (2) Non-viable particle count. (3) Monitoring of pressure differential. (4) Recovery test. (5) Air flow pattern test. (6) Stabilization time interval test (all mandatory validation test mentioned on HBL protocol shall be carried out as per requirement). Any deficiencies or non-conformances identified during testing shall be reported and rectified before validation acceptance. Validation documentation (IQ review/as-found and OQ as applicable) shall be prepared and submitted as per HBL format. |
| 4 | AR Block |
| 5 | Size (Overall) in mm: 2590 x 1340 x 650 |
| 6 | Size (Overall) in mm: 2590 x 1250 x 650 |
| 7 | Size (Overall) in mm: 1807 x 1340 x 650 |
| 8 | Size (Overall) in mm: 1807 x 1340 x 650 |
| 9 | Size (Overall) in mm: 1654 x 1340 x 475 |
| 10 | QA/QC Block |
| 11 | Size (Overall) in mm: 1350 x 735 x 620 |
| 12 | BVF Block |
| 13 | Size (Overall) in mm: 1513 x 1818 x 650 |
| 14 | Size (Overall) in mm: 1513 x 1198 x 650 |
| 15 | Size (Overall) in mm: 1480 x 1818 x 650 |
| 16 | Size (Overall) in mm: 3037 x 1208 x 650 |
| 17 | Size (Overall) in mm: 3943 x 1483 x 650 |
| 18 | Size (Overall) in mm: 3955 x 1483 x 650 |
| 19 | WAREHOUSE |
| 20 | Size (Overall) in mm: 1350 x 735 x 620 |
| 21 | MOBILE LAMINAR AIR FLOW UNIT (MLAF) - RE - VALIDATION |
| 22 | Re-validation of Mobile Laminar Air Flow Unit(s) (MLAF) already installed or positioned at site. Prior to testing, the contractor shall perform a priliminary inspection covering structural condition of the mobile cabinet, castor wheel and locking brake functionality, door seal and interlock condition, filter housing seal condition, blower motor wiring, inverter/UPS and battery connection integrity, magnehelic gauge zero verification and earthing continuity, general cleanliness and the unit to be serviced where required. Testing shall be carried out as per ISO 14644-3 / WHO GMP and other applicable guidelines. The testing programme shall minimum include: (1) Air velocity test. (2) Filter integrity test. (2) Non-viable particle count. (3) Monitoring of pressure differential. (4) Recovery test. (5) Air flow pattern test. (6) Stabilization time interval test (all mandatory validation test mentioned on HBL protocol shall be carried out as per requirement). Validation documentation (IQ as-found review and OQ) shall be prepared and submitted as per HBL approved format. |
| 23 | Size (Overall) in mm: 1730 x 700 x 1900 @ ARB |
| 24 | Size (Overall) in mm: 1630 x 1050 x 1800 @ BVF |
| 25 | Size (Overall) in mm: 1730 x 700 x 1900 @ BVF |
| 26 | VERTICAL LAMINAR AIR FLOW UNIT (VLAF) - RE - VALIDATION |
| 27 | Re-validation of Vertical Laminar Air Flow Unit(s) (VLAF) already installed at site. The contractor shall first carry out a preliminary inspection of the VLAF covering: overall structural assembly integrity; levelling jack verification; front sash condition, alignment and lifting mechanism; toughened glass side panel seating; work table (SS 316L perforated) condition; SS pipe support integrity; blower motor connections; control panel wiring verification; magnehelic gauge mounting and tube connections; earthing continuity and MCB rating verification, general cleanliness and the unit to be serviced where required. Testing shall be carried out as per ISO 14644-3 / WHO GMP and other applicable guidelines. The testing programme shall minimum include: (1) Air velocity test. (2) Filter integrity test. (2) Non-viable particle count. (3) Monitoring of pressure differential. (4) Recovery test. (5) Air flow pattern test. (6) Stabilization time interval test (all mandatory validation test mentioned on HBL protocol shall be carried out as per requirement). Validation documentation (IQ as-found and OQ as applicable) shall be prepared and submitted as per HBL approved format. |
| 28 | Size (Overall) in mm: 1650 x 820 x 2025 @ ARB |
| 29 | Size (Overall) in mm: 1340 x 820 x 2025 @ QA/QC |
| 30 | Size (Overall) in mm: 1980 x 820 x 2025 @ QA/QC |
| 31 | Size (Overall) in mm: 1650 x 820 x 2025 @ QA/QC |
| 32 | Size (Overall) in mm: 1650 x 820 x 2025 @ WH |
| 33 | DYNAMIC GARMENT CUBICLE (DGC) - RE - VALIDATION |
| 34 | Re-validation of Dynamic Garment Cubicle(s) (DGC) already installed at site. A preliminary inspection shall first be conducted covering: structural assembly and joint integrity; door alignment, seal condition and latch functionality; perforated shelf condition and seating; levelling jack condition and height; filter housing seal condition; blower motor wiring; magnehelic gauge connections; UV lamp condition; hour-meter functionality; interlock wiring and relay condition; earthing continuity, general cleanliness and the unit to be serviced where required. Testing shall be carried out as per ISO 14644-3 / WHO GMP and other applicable guidelines. The testing programme shall minimum include: (1) Air velocity test. 2)Filter integrity test. (2) Non-viable particle count. (3) Monitoring of pressure differential. (4) Recovery test. (5) Air flow pattern test. (6) Stabilization time interval test (all mandatory validation test mentioned on HBL protocol shall be carried out as per requirement). Validation documentation (IQ review and OQ as applicable) shall be prepared and submitted as per HBL approved format. |
| 35 | Size (Overall) in mm: 720 x 865 x 2300 @ ARB |
| 36 | Size (Overall) in mm: 720 x 865 x 2300 @ QA/QC |
| 37 | Size (Overall) in mm: 720 x 865 x 2300 @ BVF |
| 38 | Size (Overall) in mm: 720 x 865 x 2300 @ WH |
| 39 | ACCESSORIES - SITC |
| 40 | LIMIT SWITCH - SITC [FOR AIR CURTAINS] |
| 41 | Supply, installation, testing and commissioning of industrial electro-mechanical miniature limit switch of roller lever operated type suitable for position sensing and interlocking applications, complete with actuator arm, contact block, enclosure, mounting accessories, fixing hardware, wiring termination and glanding wherever required. The limit switch shall be suitable for operation on 230V AC system with minimum contact rating of 5A at 380VAC / 0.4A at 115VDC and shall have minimum 1NO + 1NC contacts suitable for continuous industrial duty. The scope shall include mounting, alignment, testing for proper actuation and continuity, and complete commissioning as required. |
| 42 | Warehouse |
| 43 | Secondary packing |
| 44 | Central laundry |
| 45 | Animal house |
| 46 | LED LIGHTS - SITC |
| 47 | Supply, installation, testing and commissioning of 2-ft (600 mm) LED light fixture for cleanroom LAF units, rated approximately 9–14W, 230V AC, 50Hz, with IP54-rated housing, providing minimum 500 LUX at working plane complete with electronic driver suitable for flush/surface mounting, wired to control panel with interlock operation, including installation, wiring, earthing and lux level verification. |
| 48 | LED light - 2foot @ BVF Block |
| 49 | Supply, installation, testing and commissioning of 4-ft (1200 mm) LED light fixture for cleanroom LAF units, rated approximately 18–28W, 230V AC, 50Hz, with IP54-rated housing, providing minimum 500 LUX at working plane complete with electronic driver suitable for flush/surface mounting, wired to control panel with interlock operation, including installation, wiring, earthing and lux level verification. |
| 50 | LED light - 4foot @ QA/QC Block |
| 51 | LED light - 4foot @ BVF Block |
| 52 | UV LIGHT - SITC |
| 53 | Supply, installation, testing and commissioning of germicidal UV-C lamp assembly for cleanroom equipment, comprising low-pressure mercury vapour UV lamp emitting at 254 nm wavelength, providing adequate irradiance for surface decontamination, IP54 protection. complete with UV interlock system ensuring lamp switches OFF when door/sash is open (fail-safe operation), including wiring, mounting, safety shielding to prevent UV exposure, and functional testing of interlock and UV intensity. |
| 54 | UV Light - 15W / 1.5 ft. @ BVF Block |
| 55 | UV Light - 30 W / 3 ft. @ BVF Block |
| 56 | AIR VELOCITY SENSOR - SITC |
| 57 | Supply, installation, testing, and commissioning of air velocity sensor for cleanroom LAF units, garment cubicles, and general applications, thermal thin-film anemometer principle, adjustable range 0–15 m/s, accuracy ±(0.2 m/s + 3% reading) at 20°C/45% RH, 24V AC/DC , 4–20 mA or 0–10 V output for panel display/BMS/PLC/alarm integration. Robust polycarbonate sensor probe (IP20 head/IP42 transducer), duct-mounted with adjustable immersion stem, leak-tight flange fitting downstream of HEPA or representative locations. Complete with shielded cabling , 3-digit LED indicator (4–20 mA input), wiring/termination to SS control panel, earthing and commissioning verification of signal linearity, display accuracy, alarms |
| 58 | Air velocity sensor @ QA/QC Block |
| 59 | PU CASTER WHEEL - SITC |
| 60 | Supply, installation, testing and commissioning of polyurethane (PU) caster wheels for cleanroom equipment, 100 mm diameter with PU tyre on nylon core, non-marking, anti-static and resistant to common disinfectants, with minimum load capacity of 100 kg per wheel, provided with SS 304 swivel bracket, double bearing arrangement and total-lock brake mechanism for simultaneous wheel and swivel locking, complete with SS mounting plate compatible with equipment frame, installation using SS fasteners, and verification of smooth movement, locking function and stability, suitable for GMP cleanroom applications. |
| 61 | PU Caster Wheel @ BCG Block Please Enable Macros to View BoQ information |