|
| 1 | A. Drilling Portion |
| 2 | Supplying all materials, labour, tools and equipment for drilling 125x115 mm dia bore well in any kinds of soil rocks by using D.T.H. super Rig machine and ball hammer technology including all technology inclusive of mobilization, demobilization of rigs air compressor all accessories of rigs tools and plant labour etc. all complete job including transportation charge cost of flushing charge, geographical investigation etc. all complete. |
| 3 | (a) 0.00m Upto 30.00mtr.depth bellow G.L. in Rural Areas |
| 4 | (b) 30.00m upto 70.00m depth beyond In Rural Areas |
| 5 | Supplying all material, labour and inserting UPVC blue pipe 125mm internal dia casing pipe for protecting the bore hole in over burden up to hard surface as per IS 12818-1392 with latest revision all complete job with taxes as per specification and direction of E/I. |
| 6 | Supplying labour cement and calcium chloride or bentonite solution and equipments for Grouting to Casing Pipe all complete job including carriage of material to work site as per specification & direction of E/I. |
| 7 | Supplying all tools, equipments and labour and doing washing, flushing, and developing of drilled tube well to give clean and clear water all complete job as per direction of E/I. |
| 8 | Supplying all materials labours and equipment including 125 mm dia GI/CI cap 125 mm dia T/W properly all complete and taking it out as per specification & direction of E/I. (the cap will be property of department) |
| 9 | B. Civil Portion |
| 10 | Supplying all tools, equipment, labours and lowering 32 mm dia G.I. (Medium) pipe in DT in 3 mtr. Length all complete job as per direction of E/I. |
| 11 | Providing Labour for fitting and fixing deep well cylinder jointing materials, chrome leather bucket all tools and plan etc. required for the job for low water level all complete job as per specification & direction of E/I. |
| 12 | Providing all materials, labours for fitting and fixing of India Mark II Hand Pump with all accessories all job complete as per direction of E/I. |
| 13 | Supplying all materials, labours and equipment for constructing PCC (1:2:4) circular platform around each drilled tube well including 12mm thick cement plaster (1:4) with neat cement punning over exposed surface as per UNICEF design etc. all complete. Including carriage of materials. |
| 14 | Supplying all materials labour and equipment for constructing PCC (1:2:4) drain as per UNICEF Design etc. all complete .Including carriage of materials. |
| 15 | Supplying tools, labours and materials for painting, numbering and year for construction of T/Well and taking of colour photograph with two or three nearest persons including platform, drain, soak pit and also longitude & latitude, details of T/W such as total depth, casing depth, static water level, drawdown, discharge, strata chart, beneficiary population etc in separate sheet/format all complete as per direction of E/I. |
| 16 | Supplying all materials, labours and equipment forDismantling PCC (1:2:4) platform and Taking Out IM-II Hand Pump & Its Pipe Including Cost of Carraige of Materilas from site to Store Consrtruction PCC(1:2:4) drain as per UNICEF design etc. all complete. |
| 17 | C. Cost of Materials |
| 18 | Cost of standard I.S.I. mark Deep Well Hand Pump for India mark-II, I.S.I. 15500 (Part 2) / 2004 with latest revision including 12mm x 3 meter long 8 no. Connecting Rods made of bright bar electro-galvanized fitted with coupler & normal stand assembly recommended for use with cylinder assembly suitable for bore well casing pipe. |
| 19 | Cost of 125 mm dia blue UPVC Casing Pipe as per I.S.12818/2016 CML no.- 5543459. |
| 20 | Cost of 32 mm dia GI pipe (Medium) 3 Mtrs long screwed at both ends with seamless socket as perrelavent B.I.S. specification IS:1239(Part-I)/2004. |
| 21 | Add 18% GST |
| 22 | Add 1% Labour Cess Please Enable Macros to View BoQ information |