| 1 | filling in fonundation trenchs and plinth in layers not exceeding 150 mm thick well watered ,rammed, fully compacted and fine dressed with obtained after cutting within lead of 50 m and left of 1.5 m all complete as per building --- do---E/I |
| 2 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I. |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume). |
| 4 | Providing designation 75B one brick egde soling joints filled with local sand including the cost of watering taxes royality all complete as per building specification and direction of E/I. |
| 5 | providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:2:4 ( 1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size |
| 6 | Providing designation 75 B brick work in C.M.(1:6)in foundation and plinth with approved quality of clean coarse sand 0f F.M. 2 to 2.5 including providing 10 mm thick mortar joints ,cost of screening materials , raking out joints to 15 mm depth , curing, taxes and royality all complete as per building specification and direction of E/I. |
| 7 | Providing 12 mm Thick cement plaster (1:6) and 1.5 mm cement punning with clean coarse sand of F.M. 1.5 including screening , curing with all leads and lifts of water , scafffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 8 | centering and shuttering including strutting , propping etc. and removal of form for foundation ,footings, base of columns etc. for mass concrete |
| 9 | providing and laying in position Reinforced cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:1.5:3 ( 1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size |
| 10 | Providing Tor steel reinforcement of 10mm , 12mm & Dia bars as per approved design and drawing excluding carriage of bars to work site , cutting , bending , and binding with annealed wire with cost of wire , removal of rust , placing the rods in position all complete as per building specification and direction of E/I item 5.5.5 @ kg /m3 |
| 11 | Carriage of materials (i) Cement with avg.lead 5 KM |
| 12 | (ii) Brick with avg.lead 10 KM |
| 13 | (iii) Sand with avg.lead 20 KM |
| 14 | (iv)Stone chips with avg.lead 7 KM |
| 15 | (v) earth |
| 16 | Add 18 % GST |
| 17 | Add 1% LC Please Enable Macros to View BoQ information |