| 1 | Disconnection of electric motor, connection and decoupled the pump set, Dismantling of existing damage MS foundation base frame from CC foundation by cutting of foundation bolts with the help of gas cutter and taking out with the help of heavy labour |
| 2 | Dismantling taking out of existing suction and delivery piping from sewer main hole by chain pulley block and heavy labour, gas cutter and taking out with the help of heavy labour |
| 3 | Breaking of existing R.C.C foundation by power hammer and making new R.C.C foundation including providing / fixing of foundation bolt as per site requirement. |
| 4 | Providing & fixing of MS blind flange suitable size on delivery side with the help of packing nut bolts etc. |
| 5 | Fabrication of new MS base frame made from MS channel suitable for above pump set.as per site requirement with foundation bolt. |
| 6 | Fixing of M. S. Base Frame on the RCC foundation the job includes proper leveling and alignment. |
| 7 | Supply of MS pipe heavy duty of size 150 mm Dia. Make; -Jindal / Tata. |
| 8 | Supply of MS pipe heavy duty of size 125 mm Dia. Make; -Jindal / Tata. |
| 9 | Supply of C.I.D./ F Swing Type Non-Return Valve, PN 1.0, C.I. Body/ Door/ Bronze to rubber rings/ SS/410 Hinge pin construction of 125 mm size. Make: - Kirloskar/ IVC. |
| 10 | Supply of C.I.D./ F Swing Type Non-Return Valve, PN 1.0, C.I. Body/ Door/ Bronze to rubber rings/ SS/410 Hinge pin construction of 150 mm size. Make: - Kirloskar/ IVC. |
| 11 | Supply of nut bolt washer of different sizes as per the site requirement , nut bolt of good quality |
| 12 | S/o 50% synthetic Neoprene insertion rubber packing sheet of 6mm.Make Jyoti /National |
| 13 | Fabrication and fixing of various sizes flange, bend, reducer, and other pipe fitting etc. as per site requirement. |
| 14 | Re-installation of suction and delivery line with the help of heavy labour, including bend, flange of appropriate size by cutting welding as per site requirement. |
| 15 | Loading, Unloading, Cartage and Transportation charges for the above materials to the site including charges of heavy labour etc. |
| 16 | Re- installation and refitting the pump set as per original position with proper alignment and also making of all electrical connections, fitting all valves bends etc in original position etc. |
| 17 | Painting the complete suction/delivery line foundation base frame and other E&M equipment with two coats of anti-corrosive paint. |
| 18 | Testing & Commissioning of motor P/set i/c above E&M equipment first on No-Load and then On-Load condition Please Enable Macros to View BoQ information |