| 1 | Closing of Inlet valve of all 4 pumps with the help of manual labour before execution the work and checking of any leakage |
| 2 | Dismantling of old damage delivery line with the help of manual labour by gas cutting welding etc. |
| 3 | Supply of 300 mm dia. M.S. pipe fabricated out of M.S. sheet of required thickness |
| 4 | Supply of neoprene rubber sheet having 50% neoprene, 3 mm thick Make Jyoti/Worth/DJB approved |
| 5 | S/o required off size threaded nut-bolts of good quality |
| 6 | Charges of gas cutter with oxygen & L.P.G. Gas cylinder. |
| 7 | Hiring of Safety arrangement like Air Face Mask, Air Line Breathing Apparatus, Hand Blowers, Helmet, Gum Boots, Protective Bodysuits, Hand Gloves, Gas Detector, Safety Belts, Resuscitation Apparatus, Oxygen Inhalator, Portable Ladder, First Aid Box, Caution Tape, Barrie Cone, Litmus Paper, Torch, Fire Extinguisher etc. arranged by the firm at site of work for safe working. |
| 8 | Dewatering of contained/ leaking water from 600mm dia main to suitable place with the help of submersible pump sets of desired capacity as per site requirement. |
| 9 | Fixing of new MS 300 mm dia. Pipe, fabrication of 300 MM Dia double flanged Bend as per side requirement and 300 mm dia heavy duty M/S. flange with the help of manual labour, fitter, welder & providing suitable size scaffolding as per site requirement after the welding work required for execution of work including welding material for welding works in pipes in and fitting at outer and inner side with two or more welding layers for leak proof joints. |
| 10 | Lighting arrangement at site of work including consumables, flood lights, panel board etc. for safe working of men and materials as per site requirement |
| 11 | Providing and erecting temporary barricading at site as per directions of Engineer-in-Charge which includes, glow lamps, reflective signs, marking flags, caution tape as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion |
| 12 | Making support for the delivery line made up of Bricks. |
| 13 | Transportation of T&P equipment, man & material including tools & tackles for labour. (to and fro) |
| 14 | Opening of inlet valve after completion of work and testing & commissioning of delivery line to ensure leak proof pumping Please Enable Macros to View BoQ information |