| 1 | Disconnection of electric motor P/set, remove from the base frame, remove charging line of vacuum pump set etc. by dismantling of old damaged pump sets from base frame by cutting of foundation bolts with the help of gas cutter and taking out with the help of heavy labour. |
| 2 | S/o mono block P/set having discharge 25 - 30 lps on 14 – 48 mtr head required with CI impeller, TEFC motor, “F” class insulation suitable up to 20 HP motor in standard construction. Make:- Kirloskar/M&P/Approved by DJB |
| 3 | Modification of existing base frame suitable for above pump set by the help of welding work & material as required after that making of cement concrete foundation suitable for above P/set with all material like cement concrete sand, i/c supply and grouting of foundation bolt etc as required. |
| 4 | S/o Sluice valve 80 mm dia PN 1.0 Make: IVC/Kirloskar/DJB Approved make |
| 5 | S/o Sluice valve 100 mm dia PN 1.0 Make: IVC/Kirloskar/DJB Approved make |
| 6 | S/o NRV 80 mm dia PN 1.0 Make: IVC/Kirloskar/DJB Approved make |
| 7 | S/o MS Pipe 80 MM dia ‘B’ Class Make:- Jindal/TATA/ Approved By DJB |
| 8 | S/o MS Pipe 100 MM dia ‘B’ Class Make:- Jindal/TATA/ Approved By DJB |
| 9 | Making & Supply of 80 mm dia MS flange, Tee, Bend heavy duty etc as required by job |
| 10 | S/o Nut bolts with washers of good quality. |
| 11 | S/o Insertion sheet for jointing Make:- Jyoti/Deep/National/ Approved By DJB. |
| 12 | S/o 10 sq mm three core copper cable working voltage upto 1100V Make:- Polycab,/Kalinga/ Havells/Grandlay Approved by DJB |
| 13 | Cleaning the surface of pipe and spl. Valves etc with wire brush and emery paper and painting the complete installation with two or more coats of synthetic enamel paint and coat of steel primer |
| 14 | Installation of motor P/set i/c above E&M equipment’s along with all piping work & making & supply of Bend, Tee, reducer & other specials etc as required & fixing of valves and executing allied E&M and civil work, laying of cable as per site requirement, making connection with thimble panel board i/c cartage, taking all safety precaution, arranging all tools and tackles i/c welding set gas cutter etc, the work is inclusive of testing commissioning of all E&M equipment at No load and full load condition. |
| 15 | Testing & commissioning of motor P/set i/c above all E&M equipment’s first at on No-load and then on On-load condition |
| 16 | Transportation charges for man & Material including loading / Unloading etc. as per site requirement at a suitable place as per direction of engineer-in-charge. Please Enable Macros to View BoQ information |