| 1 | Rajupur and Kharkhashipur Water Supply Scheme |
| 2 | Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour, T&P etc complete as per instructions of Engineer ‐in ‐charge. |
| 3 | Ordinary soil |
| 4 | Mixed soil with Kankar |
| 5 | Supply of following sizes pipes for distribution system conforming to latest/relevant I.S 4984/1995 Specification with all jointing materials and specials conforming to leatest.Relevent I.S specifications including F.O.R. Destination and all taxes and insurance etc. with loading unloading and carting up to site of work also including specials for these pipes and lowerring them into the trenches and laying true to alignment and gradient and jointing etc.complete ( including testing of pipe lines and cutting of pipes for making up the lenght but excluding the cost of trenches all complete as per instructions of Engineer -in-Charge. |
| 6 | 110 mm dia HDPE Pipe PN‐6: Class PE‐100 |
| 7 | 90 mm dia HDPE Pipe PN‐6: Class PE‐100 |
| 8 | 75 mm dia HDPE Pipe PN‐6: Class PE‐100 |
| 9 | 63 mm dia HDPE Pipe PN‐6: Class PE‐100 |
| 10 | Supply and carting up to site of work of the following dia DI butterfly /sluice valves, class I, working pressure 10 Kg/cm2 confirming to IS: 780/1969 or its latest amendments,including valve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, fixing in position and jointing them with pipelines and testing etc. complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer ‐in ‐charge. |
| 11 | Sluice valve ‐100 mm dia |
| 12 | Sluice valve ‐ 800 mm dia |
| 13 | Dismantling of the following type of road surfaces including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 14 | B.O.E. surface |
| 15 | Bituminous surface |
| 16 | Interlocking Road |
| 17 | C.C. Road |
| 18 | Reinstatement of the following type of road surfaces with old and new materials including supply of all materials labour T&P etc. required for proper completion of the work as per instructions of Engineer-in-charge |
| 19 | B.O.E. surface( 50% of existing bricks to be reused) |
| 20 | Bituminous surface |
| 21 | Interlocking Road |
| 22 | C.C. Road |
| 23 | Making house connection should be done atleast 2 m inside the boundary wall with provision of tap from distribution line to outer wall of house, with supply of 1 m G.I. pipe ( 15 mm ) ( above ground ) & average 5 mtr. MDPE Pipe ( 20 mm) ( below ground) including specials, saddle, Tap,etc. of suitable size, T&P etc. including excavation, laying and jointing for proper completion of work as per instructions of Engineer as per Dwg 12 ( excluding road restoration) |
| 24 | Construction of single tap pillar type stand post as per type design |
| 25 | Supply and fixing of approved make ISI mark chlorine dozer with all arranements. |
| 26 | Construction of following type chambers as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete for proper completion of work as per instructions of Engineer ‐in ‐charge. |
| 27 | Sluice valve chamber ( masonry type )dia upto 200 mm ‐ 1000 (L) x 1200 (W) x 1300 (H) mm |
| 28 | Scheme Information MS Board as per JJM Guidelines. Including Supply of information Board, Painting and writing on board as required information. Please Enable Macros to View BoQ information |