| 1 | Civil Works |
| 2 | Chipping the existing old damaged cement plastering in ceiling and wall, plinth beam, cleaning the surface without any loose materials, removing the debris away from the site, including cost of all materials, labour, lead, lift etc., complete. |
| 3 | Plastering the ceiling, plinth beam with CM 1:3 - 12mm thick by using special bonding agent and with water proofing compound, after cleaning the rust in the exposed reinforcement and applying with anti rust coat, including cost of all materials, scaffolding, curing, labour, lead,lift etc., complete. |
| 4 | Plastering the wall with CM 1:5 - 12mm thick by using special bonding agent and with water proofing compound including cost of all materials, scaffolding, curing, labour, lead,lift etc., complete. |
| 5 | White washing two coats with good Shell Lime for ceiling including cost of materials, labour, lead, lift, etc., complete. |
| 6 | Painting the interior and exterior walls with two coats of best quality emulsion of approved colour over a primer coat on application of wall putty, including cleaning preparing the surfaces all materials, etc., complete. |
| 7 | Painting with two coats of enamel paint of approved quality over one coat of red oxide primer including cost of all materials, labour, lead, lift, etc., complete. |
| 8 | Dismantling the existing damaged terrace tile flooring & cleaning the debris the debris away from the site including cost of materials, labour, lead, lift etc., complete. |
| 9 | Terrace flooring with pressed tiles of size 20x20x2cm using in CM1:3 mixed with crude oil 10 % weight of cement including cost of all materials,labour lead,lift etc complete (Excluding Pointing) |
| 10 | Pointing with CM 1:3 to full depth of tiles including cost of all materials,labour lead,lift etc complete |
| 11 | Providing Polymer Coating (Water Proof Coating) with following specification and the surface shall be cleaned to remove all dust, foregin, matters lose materials or any other deposits of contamination by rubbing with wire brush. Slurry: Dry blend and polymer liquid blend shall be mixed into the desired ratio as per recommendation of the supplier. The mix shall be stirred thoroughly until no bubbles remain in the mix. Any lumps found in mix shall be removed. Apply first coat of polymer modified cementitious slurry by brush on wet cleaned surface. After drying, second coat shall be applied on the first coat as directed by the departmental officers etc. The rate inclusive of cost of materials and labour, etc., complete. |
| 12 | Grouting by injecting cement slurry added with water proofing compound,Nitobond, cebex100, SBR liquid including cost of all materials, equipments, PVC pipes, machineries, lead, lift etc., complete. |
| 13 | Supplying ,laying and fixing in position of PVC Superthick 25mm dia pipe of best quality from approved manufacturer confirming to IS 4985-1968, 4984-1970 including cutting threading joining with necessary PVC specials and PVC tap including cost of all materials lead lift labour etc complete. as directed by department Engineer at site |
| 14 | Supplying, fixing and laying of 110 mm dia PVC pipe 6 Kg/cm2 of ISI brand for sanitary arrangements including cost of all materials labour lead,lift etc complete. |
| 15 | Dismantling the existing damaged Indian water closet, Cleaning and clearing the debris away from the site including cost of all the materials, labour, lead, lift etc., complete. |
| 16 | Cleaning of sewerage water collected in septic tank and clearing sludge, disposing at a suitable place away using hired tank including cost of all cleaning materials, labour, lead, lift cost of all consumables, all T&P'S including removal of cover slab and refixing the same and finishing etc., complete as instructed by Engineer at site |
| 17 | Supplying and fixing of Indian type white water closet Oriya type 580mm x 420mm with “ P “ or “ S “ trap with sand cushion and forming flooring with 40mm broken brick jelly in lime concrete of 1:2:5 (1-lime;2-sand;5-B.Jelly) with 100mm thick & finishing the top by required slope with all internal fittings, and giving connection to sewer line including cost of all materials, labour lead, lift, etc., complete. |
| 18 | Flooring with approved spartex ceramic non- slippery type tiles over CM 1:3 - 12mm thick including pointing with white cement finishing the joints, flush pointing the surfaces etc., complete. |
| 19 | Dadooing walls with best approved Quality, White/Colour Glazed tiles confirming to IS15622 of glazed tiles of best approved quality of make johnson, neycer etc., over CM 1:3, 12mm thick including cost of all materials, labour, lead, lift, etc., complete. (300mmx450mmx8mm ) |
| 20 | Flooring with approved stain free nano polish vitrified tiles 600mm x 600mm x 8mm of approved quality, design & colour (Johnson or equivalent make) laid in cement mortar 1:3 - 20mm thick including pointing with same colour cement using 0.4 Kg/Sqm finishing the joints including cost of all materials, labour, lead, lift etc., complete. |
| 21 | Supplying and fixing of LED light along with fittings, wiring , including cost of all material, labour, lead, lift, etc, complete. |
| 22 | Supply and fixing of steel door size 1.20 x 2.35 using 40x40x6mm MS angle for outer frame and 30x30x5 mmms angle for leaf frame and ms flat 25x6 mm-3 nos for cross bracings and covered with 18 gauge ms sheet with door locking arrangements including cost of all materials for removing old damaged wooden door ,labour,lead,lift,etc,complete. 1 SQM--40KG |
| 23 | Painting and writing the name of office on the outside wall by the artist as directed by the Engineer in charge including cost of prirmer and two coats enamel paint, labour, lead, lift, T&Ps, etc., complete. Please Enable Macros to View BoQ information |