|
| 1 | M & L for servicing of 5/10 Ton capacity flame proof EOT cranes (05 Nos in 4 ASD) of any make installed at different building/location at site, making the cranes in serviceable condition complete all as specified and directed with and including opeartions for maintenance specified as under:-(A) LONG TRAVEL MOTION(a) Checking gear box oil level, checking and rectifiaction of leakage if any and filling with new oil up to required level.(b) Checking functioning of all brakes of any capacity and making adjustment for proper working.(c) Checking motion wheel for any abnormal sound & checking mounting/ fixing arrangement.(d) Checking of grease in geared coupling and tighting of nut/bolts etc.(e) Checking of motion cut off at extreme ends with limit switches.(f) Checking drive shaft and coupling including tighting of nut and bolts.(g) Checking oil in FLP thrustors checking any leakage any filling with new oil.(h) Checking terminal connection of all LT motion of three phase FLP electric motor and tightening properly including repalcing burnt out/ over heated cable ends if any. |
| 2 | (B) CROSS TRAVEL MOTION(a) Checking gear box oil level, checking and rectifiaction of leakage if any and filling with new oil up to required level.(b) Checking functioning of all brakes of any capacity and making adjustment for proper working.(c) Checking motion wheel for any abnormal sound & checking mounting/ fixing arrangement.(d) Checking of grease in geared coupling and tighting of nut/bolts etc.(e) Checking of motion cut off at extreme ends with limit switches.(f) Checking drive shaft and coupling including tighting of nut and bolts.(g) Checking oil in FLP thrustors checking any leakage any filling with new oil.(h) Checking terminal connection of all CT motion of three phase FLP electric motor and tightening properly including repalcing burnt out/ over heated cable ends if any. |
| 3 | (C) HOIST MOTION(a) Checking gear box oil level, checking and rectifiaction of leakage if any and filling with new oil up to required level.(b) Checking functioning of all brakes of any capacity and making adjustment for proper working.(c) Checking motion wheel for any abnormal sound & checking mounting/ fixing arrangement. (d) Checking of grease in geared coupling and tighting of nut/bolts etc.(e) Checking of motion cut off at extreme ends with limit switches.(f) Checking drive shaft and coupling including tighting of nut and bolts.(g) Checking oil in FLP thrustors checking any leakage any filling with new oil. (h) Checking terminal connection of all hT motion of three phase FLP electric motor and tightening properly including repalcing burnt out/ over heated cable ends if any.(D) ELECTRICALS(a) Checking and tightening all electric connection(b) Checking the contactors/ relays etc for overheating or flashinng.(c) Clening off all connection and control cables.(d) Properly bunching the loose control cable.(e) Checking functioning of cable carriers.(f) Checking the connection and serviceability of VVVF drives for smooth working. |
| 4 | (E) GROUND MOTION CONTROL PANELOpening the push button control unit, checking all connection, replacing flashed/ over heated connections, general cleaning and checking all the functions,of the LT/CT/ Hoist motion push buttons and lights/ VVVF switch including reassembling the unit complete Notes : (i) Repair/overhauling of EOT Crane shall be carried out once in a month through authorized service agency of Original Equipment Manufacturer (OEM). The contractor shall submit documentary proof/evidence in this regard before taking EOT Cranes under repair, overhauling, etc. (ii) Make and model of part to be replaced shall be same as used/recommended by OEM. (iii) Repairing/replacement of unserviceable main components catered for separately under respective items of this Schedule shall be measured & paid for separately. (iv) Load as required for testing shall be arranged by the user/department. However, transportation of load for testing from the place of issue and return to the place of issue shall be responsibility of the contractor. (v) Contractor shall give a certificate after repair/overhauling of EOT Crane that Crane is serviceable & fully functional in all respect and ready to use for load every month.(h) Checking terminal connection of all Hoist motion of three phase FLP electric motor and tightening properly including repalcing burnt out/ over heated cable ends if any. (j) The contractor shall arrange service engineer any number of times if the crane is not working properly and rate is included in the item rate to rectify the malfunctioning of the crane and make serviceable within 24 hrs if contractor fails to attend and make serviceable within 24 hrs, penal recovery as specified in PS Clause No. 28 will be applicable. (k) Load testing is carried out by the contractor once in every month after servicing by service engineer and rate is included in this.(l) Necessary test certificate from factory inspector shall be produced by the contractor before making payment. |
| 5 | S & F in repair to step down control transformer copper wound of PRI.V. 230, SEC.V. -110, 200 VA ,frequency 50Hz suitable for 2 to 5 Ton capacity EOT crane complete all as specified and directed. |
| 6 | S & F contactor 20 Amps with 2 NO + 2NC including taking out old unserviceable complete all as specified and directed. |
| 7 | S & F contactor 25Amps with 2 NO + 2NC including taking out old unserviceable complete all as specified and directed. |
| 8 | S & F contactor 32 Amps with 2 NO + 2NC including taking out old unserviceable complete all as specified and directed. |
| 9 | M & L for push button switch with element in Flame proof Push Button Station as per require color code, including taking out old unserviceable one complete all as specified and directed. |
| 10 | Supply, fixing testing & commissioning of AC drive for hoist control, V/F control operated on 3 phase 415 Volt AC for hoist control motor of 5/10 TON EOT crane as per existing type and make including taking out old unserviceable one complete all as specified and directed. |
| 11 | Supply, fixing testing & commissioning of AC drive for LT/CT control, V/F control operated on 3 phase 415 Volt AC motor of 5/10 TON EOT crane as per existing type and make including taking out old unserviceable one complete all as specified and directed. |
| 12 | Supply, fixing and making all connections for limit switch 40 Amps 415 Volts all as per existing for LT/CT/ hoist motion of 10 ton capacity crane including taking down unserviceable complete all as specified and directed. |
| 13 | Supply and fixing flame proof thrustor brake unit complete as per existing of capacity 18kg for drum size 100mm including taking down unserviceable complete all as specified and directed. |
| 14 | Supply only gear oil grade 680 suitable for hydraulic thruster brake complete all as specified and directed. |
| 15 | Supply only Grease of required type/class for lubrication complete all as specified and directed. |
| 16 | Supply only Ball bearing of size 6310 suitable for 10/5 Ton capacity gear box for main hoist complete all as specified and directed. |
| 17 | Supply only Ball bearing of size 6317 suitable for 10/5 Ton capacity gear box for main hoist complete all as specified and directed. |
| 18 | Supply only Ball bearing of size 6206 suitable for 10 Ton / 5 Ton capacity EOT crane for CT complete all as specified and directed. |
| 19 | Supply only Ball bearing of size 6212 suitable for 10 Ton / 5 Ton capacity EOT crane for Long Travel complete all as specified and directed. |
| 20 | Supply only Ball bearing of size 6210T suitable for 10 Ton / 5 Ton capacity EOT crane for Long Travel complete all as specified and directed. |
| 21 | S&F Steel wire rope 16 mm dia, 6 x 36 construction with tensile strength of 180 Kg/Sqmm with a factor of safety of 6 suitable for lifting load of 10 Ton including greasing including taking down old unserviceable steel rope complete all as specified and directed.Notes : (i) The steel rope shall be best performed plough straight non rotating type conforming to IS-2266. (ii) The breaking strength of the rope shall not be less than 6 time the safe working load thereon. (iii) Test Certificate of manufacturer shall be submitted by the contractor. |
| 22 | Supply and fixing in repair Steel wire rope of existing gauge and size for cable protection in crane complete all as specified and directed. |
| 23 | S&F in replacement of PCB (Input and out put control cards) of 5/10 Ton Flame proof EOT crane as per existing in LT/CT/Hoist panel and testing complete all as specified and directed. Note :- The contractor shall submit the warranty of one year for the item |
| 24 | Taking down and repairing of PCB (Input and out put control cards) of 5/10 Ton Flame proof EOT cranefrom authorised service centre, refixing and testing complete all as specified and directed. |
| 25 | S&F in repair PVC insulated & FRLSH PVC sheathed, multi stranded copper conductor cable (ISI marked) of size1.5 Sqmm 24 Core with steel reinforced, 1100 Volt, complete all as specified and directed. |
| 26 | S&F in repair PVC insulated & FRLSH PVC round sheathed, multi stranded copper conductor cable (ISI marked) of size 2.5 Sqmm 4 Core, 1100 Volt, complete all as specified and directed. |
| 27 | S&F in repair PVC insulated unsheathed multi stranded copper conductor wire of size 2.5 sqmm for control wiring with suitable copper lugs complete all as specified and directed. |
| 28 | S&F in repair Trailing flexible copper conductor cable (ISI marked) of size 10 Sqmm 4 Core, 1100 Volt, with & including movable clamps and single flanged rollers, steel wire rope complete all as specified and directed. |
| 29 | Supply and fix Solar PV Modules of Crystalline Silicon Terrestrial PV Modules : IEC 61215 / IS14286 with Thin Film Terrestrial PV Modules : IEC 61646 with Concentrator PV Modules & Assemblies : IEC 62108 In addition, the modules must conform to IEC 61730 Part 1-requirements for construction & Part 2 - requirements for testing, for safety qualification or Equivalent IS. The PV modules must conform to the latest edition of any of the following IEC / equivalent BIS. Silicon Poly Crystalline SPV cells shall be used in the Solar Photovoltaic module. The General requirements for PV module:(i) Module shall be made up of mono or poly crystalline silicon cells.(ii) The interconnected cells shall be laminated in vacuum to withstand adverse environmental conditions (iii) The minimum clearance between the lower edge of the modules and the developed ground level shall be 300 mm. (iv) Surge arresting device to be provided at junction box, if provided,and module shall be provided with bypass diode.(v) The bidder shall carefully design & accommodate requisite numbers of the modules in the available area (refer layout attached with the tender) to achieve the rated power in his bid.(vi) The SPV module must be IEC 61215 and IEC 61730 Part I and Part II certified from any of the accredited certifying agencies(vii) Each Solar PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years from the completion of the trial run. |
| 30 | M& L for Servicing and calibration of grid tied string type inverter of 50 KW installed at GE Nagrota with complete testing and servicing and make it fully functional complete all as specified and directed. Note : i) Serviving include the calibration and testing from OEM. |
| 31 | Supply and fix in reapir DC CABLES of 1 Core 4 mm² of Solar Grade, UV resistant made of Multistrand of Tinned Copper Conductor interconnecting between module to module and string to module complete all as specfied and directed. |
| 32 | Supply and fix in reapir AC cables from invertor to ACDB of size 35 sqmm 4 core, copper conductor, PVC insulated, FRLS, fixed with saddles to wall and laying in ducts, complete all as specified and directed. |
| 33 | M& L for Testing , Servcing & calibration of cloud based Monitoring System ( SCADA) by checking all the parameter current, Power, Voltage from the OEM. SCADA web operation shall be achieved thru Wi Fi/SIM based technology. Contractor has to provide SIM card for SCADA operation and maintain the connection for the entire period contractcomplete all as specified and directed. |
| 34 | M& L for Comprehensive maintenance of passengers lift to carrying out periodical 24x7 for 11 months call back services of 8 passengers capacity with a speed of 1 metre/ sec, of Make: Thyssen Krupp (TK Elevators India Pvt Ltd) to serve ground floor and 6 upper floors with AC variable voltage and variable frequency drive (VVVF DRIVE) system, micro processor based control system all as per IS 14665 hall position indicators on all floors, car position indicators in cabin, battery operated alarm bell and emergency lights including cabin light and fan over load switch, auto revelling, intercom facility with centre opening, stainless steel power operated sliding doors, including examining the operation, adjusting, lubricating and repairs as required to machine motor, controller parts, safety devices, governors, repair/ replacement as required to alarm bell, indicators, emergency light, emergency components, including low voltage protection relay, call bell, etc. complete all as specified and directed.Location : MAP Building - 04 Nos. (Motimandir area) Please Enable Macros to View BoQ information |
| 35 | M& L for Comprehensive maintenance of passengers lift to carrying out periodical 24x7 for 11 months call back services of 8 passengers capacity with a speed of 1 metre/ sec, of Make: Thyssen Krupp (TK Elevators India Pvt Ltd) to serve ground floor and 6 upper floors with AC variable voltage and variable frequency drive (VVVF DRIVE) system, micro processor based control system all as per IS 14665 hall position indicators on all floors, car position indicators in cabin, battery operated alarm bell and emergency lights including cabin light and fan over load switch, auto revelling, intercom facility with centre opening, stainless steel power operated sliding doors, including examining the operation, adjusting, lubricating and repairs as required to machine motor, controller parts, safety devices, governors, repair/ replacement as required to alarm bell, indicators, emergency light, emergency components, including low voltage protection relay, call bell, etc. complete all as specified and directed.Location : MAP Building - 04 Nos. (Motimandir area) Please Enable Macros to View BoQ information |