| 1 | Supplying all labour T&P,for earth work in all kinds of soil within 50 mtr initial lead and 1.5 mtr initial lift including dressing and leveling the bed and site and breaking the clouds to maximum 5 cm to 7 cm and laying in layers not exceed 0.30 mtr. In depth and as per the direction of Engineer- in-charge. |
| 2 | Supplying all labour,T&P, for laying in trenches High Density Polythene pipes and specials of following outsisde diameter and class 1 to 3 jointing by fusion welding method including testing as per specification confirming to IS: 4984-1995 with ISI marked specials & fittings & testing as per specification etc. complete as per the direction of Engineer-in-Charge. ( pipes are to be supplied by contractor with pre & post delivery inspection certificate from CIPET and manufacturing test certificate from the manufacturer). |
| 3 | 160 mm HDPE Pipe Grade PE 80 PN 6.0 |
| 4 | 110 mm HDPE Pipe Grade PE 80 PN 6.0 |
| 5 | Supplying all labour T & P and refilling the trenches with excavated materials including watering and ramming etc. all complete as per the direction of Engineer-in-Charge. |
| 6 | Supplying all materials labour, T & P for fitting and fixing of the following cast iron sluice valve with double flanged ends for water works purpose for rating PN-1-6 (IS :780-1984) and nominal diameters including cost of cast iron sluice valves of IS marked as per ISI No. 14846/2000, bolts, nuts and rubber insertion as per PH specification etc. all complete and as per the direction of Engineer-in-Charge. |
| 7 | 100 mm dia C.I Sluice Valve |
| 8 | 150 mm dia C.I Sluice Valve |
| 9 | Supplying of all materials, labour and T&P and construction of R C C sluice valve and N.R. Valve chamber as per approved drawing, design & specification. |
| 10 | Supplying all labour T&P & materials for House Connection for 85LPCD projects for new connections to the house hold premises with provision of concrete stand post, GI pipe, & fittings etc complete in all respect as per direction of Engineer-in-Charge.(on the side of ferrule) |
| 11 | Supplying all labour T&P & materials for House Connection opposite to ferruel side (after road crossings) for 70LPCD projects for new connections to the house hold premises with provision of concrete stand post, GI pipe, & fittings etc complete in all respect as per direction of Engineer-in-Charge |
| 12 | Supplying all labour, T&P & materials for fitting & fixing of HDPE pipe of 20mm dia size of maximum 6 mtr length on ferruel side for 135 nos of connection and maximum 12 mtr length on opposite of ferruel side for 90 nos of connection to accomodation the shifting of FHTC to suitable place inside the premises of the beneficiary complete in all respect etc. as per direciton of Engineer-in-charge. |
| 13 | Supplying of all labour,T&P,materials for cutting CC roads cutting for taking pipelines all. complete as per direction of the Engineer in charge. |
| 14 | Supplying of all labour,T&P,materials for making good to the damages of C.C Road in C.C (1:2:4) all. complete as per direction of the Engineer in charge Please Enable Macros to View BoQ information |