| 1 | Clearing shurb jungles and uprooting stumps and small bushes and trees below 1 M girth on premeasurement and disposing off debris away from the work site, all labour charges, with all lead, lifts & delifts T&P, Cess etc. complete as directed by the Engineer-in-charge |
| 2 | Providing, laying, spreading and compacting I.R.C. Grade -II stone aggregates (of size 63mm to 45mm) confirming to sieve analysis as per specification and moorum of approved quality at work site away from trafficable berm free from weathered skin surface for road work in regular interval including conveying from stacks spreading metal and moorum for IRC grade-II metalling in even layers to an uniform thickness compacted to 75 mm required density as per clause 404 of MoSRT&H specification for Road & Bridge works (4th revision) and packing the voids with small stones and hand packing the same to the proper camber and grade filling the interstices by spreading moorum over the metal surface including watering turf edging and consolidation with PRR 8-10 Tonnes with sufficient number passes for each layer including hire and running charges of PRR and all other machineries and T&P required for the work cost of watering and carriage of water including cost,conveyance, royalty, DMF,EMF & additional charge and Cess with all leads, lifts, all labour etc. required for the work complete in all respect, but excluding GST as per specification and as per the direction of the Engineer-in-charge. |
| 3 | Providing, laying, spreading and compacting I.R.C. Grade -III stone aggregates (of size 53mm to 22.40mm) confirming to sieve analysis as per specification and moorum of approved quality at work site away from trafficable berm free from weathered skin surface for road work in regular interval including conveying from stacks spreading metal and moorum for IRC grade-III metalling in even layers to an uniform thickness compacted to 100 mm required density as per clause 404 of MoSRT&H specification for Road & Bridge works (4th revision) and packing the voids with small stones and hand packing the same to the proper camber and grade filling the interstices by spreading moorum over the metal surface including watering turf edging and consolidation with PRR 8-10 Tonnes with sufficient number passes for each layer including hire and running charges of PRR and all other machineries and T&P required for the work cost of watering and carriage of water including cost,conveyance, royalty, DMF,EMF & additional charges and Cess with all leads, lifts, all labour etc. required for the work complete in all respect, but excluding GST as per specification and as per the direction of the Engineer-in-charge. |
| 4 | Providing and laying bituminious macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor control to the required grade level and alignment and rolling with smooth sheeled, vibratory and tandem rollers to achieve the desired compaction as per Clause 504 of MoSRT&H Specifications for road & bridge works (4th Revision) with all leads, lifts & delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T&P, hire and running charges of all machineries, Cess etc. complete in all respect as directed by the Engineer-in-charge. |
| 5 | Cleaning the existing granular base surface including removal of binding materials & other foreign materials with wire brushes & small picks sweeping with brooms or soft brushes & finally desting with old gunny bags and / or compressed air to receive bituminous treatment including cost, conveyance, cess and all taxes of all materials excluding GST with all leads, lifts, all labour etc required for the work complete in all respect as per the specification and direction of the Engineer-In-charge |
| 6 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer @ 0.60 kg /sqm using mechanical means as per clause 503 of MoSRT&H specification for road and bridge works (4th revision) with all cost,conveyance, labour, T&P and Cess etc. complete, but excluding GST as per direction of the Engineer-in-charge. |
| 7 | Providing and applying tack coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer @ 0.20 kg /sqm using mechanical means as per clause 503 of MoSRT&H specification for road and bridge works (4th revision) with all cost,conveyance, labour, T&P and Cess etc. complete, but excluding GST as per direction of the Engineer-in-charge. |
| 8 | Providing and laying compacted Semi Dense Bitumonouse Concrete (Grading-II) of 50mm thick with Batch type Hot Mix Plant using crushed stone aggregates of specified grading, premixed with bituminous binder of 60/70(VG-30) penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibtratory and tandem rollers to achieve the desired compaction as per approved drawing and technical specifications complete in all respect as per Section 900, clause 501 & 508 of MoRT&H Specifications for Road & Bridge works (4th Revision) & including cost & conveyance of all materials, labour, T&P, royalty, DMF,EMF & additional charges, taxes of all materials excluding GST etc complete as per direction of Engineer-in Charge. |
| 9 | Collecting, supplying and stacking clean dry sand from the approved quarry and approved quality at work site away from trafficable berm for road work, conveying from stacks and blinding road surface with sand of 6 mm thick including cost, conveyance & royalty, DMF,EMF & additional charges, cess, taxes of all materials excluding GST with all labour, T&P required for the work complete in all repsects as per the specification and direction of the Engineer in charge. |
| 10 | Collecting, conveying, supplying good quality moorum of approved quality from approved quarry and stacking at approved stack yard for pre measurement in regular box heaps of 1.5m x 1.5mx0.50m to be measured as one cum and conveying from stacks and spreading for construction of shoulder in layers not exceeding 22.5cm depth and consolidation with PRR to required density in OMC condition including cost, conveyance, royalties, cess and taxes of all materials excluding GST, with all leads, lifts, delifts and labour and T&P, hire charges of PRR and other machineries required for the work, etc complete in all respect as per specification and direction of the Engineer in charge. |
| 11 | Dismantling and removing old cement concrete including stacking the useful materials for reuse and removing the debris away from work site with all leads, lifts & delifts, all labour charges, T&P, Cess, scafolding etc. complete as directed by the Engineer-in-charge. |
| 12 | Earthwork in excavation of foundation in hard soil with all leads & lifts including rough dressing and leveling the bed and disposal of the excavated materials away from the work site with initial lead of 50m and initial lift of 1.50m etc complete including cost of all materials, labour and T&P and cess, taxes of all materials excluding GST required for the work etc. complete in all respect and as per the direction by the Engineer-in-charge. . |
| 13 | Filling foundation and plinth with sand including watering and ramming with all labour, T&P etc complete to the required level including cost, carriage, royalty, DMF,EMF,additional charges & cess, taxes of all materials excluding GST, etc complete as per the approved drawing, design, specification and direction of the Engineer-in-Charge. |
| 14 | Collecting and supplying of good quality of Moorum and sand for subbase of roadwork & admixing moorum and sand of approved quality at 70 : 30 or any other proportion approved by the Engineer-In-Charge as per test results and laying sub-base in road surface in layers not exceeding 100 mm including watering and compaction by vibratory Roller or PRR or any other suitable compacting machinery to the required density in OMC with all leads ,lifts , delifts , all labour charges , T&P , cost and conveyance of all materials , royalty , hire charges of all machineries required for the work ,taxes of all materials excluding GST etc.complete as per specification and direction of the Engineer in Charge. |
| 15 | Cement concrete (1:3:6) with crusher broken hard granite 40mm down graded aggregates of approved quality free from weathered skin surface mixing by concrete mixer and placing in position including hoisting and laying with all leads, lifts and delifts, dewatering, mixing and vibrating by mechanical means, loading & unloading, curing with cost, conveyance, all labours, T&P, Royalty, DMF,EMF,additional charges, cess, but excluding GST as per approved drawing, design and specification and direction of the Engineer in charge. |
| 16 | Supplying, fitting including straightening, cutting, bending, shirting, binding the M.S. or HYSD reinforcement bars for R.C.C. work and tying the grills and placing in position including cost, conveyance of M.S. or HYSD reinforcement bars and binding wires of 18 to 20 gauges, loading, unloading incuding cost, carriage, labour, cess and taxes and all materials excluding GST etc complete as per approved design, drawing, specification and the direction of the Engineer-in-charge. |
| 17 | Cement concrete (1:2:4) with crusher broken hard granite 12mm size down graded aggregates of approved quality free from weathered skin surface mixing by concrete mixer and placing in position including hoisting and laying with all leads, lifts and delifts, dewatering, mixing and vibrating by mechanical means, loading & unloading, curing with cost, conveyance, all labours, T&P, Royalty, DMF,EMF,additional charges, cess, but excluding GST as per approved drawing, design and specification and direction of the Engineer in charge. |
| 18 | Providing weep holes in R.C.C abutment, flanks, out walls and flanks walls etc with 75 mm dia AC pipe extending through the full width of the structure with slope of 1 V:20 H towards drawing face with non- return flap valves at wall face with all cost, conveyance, labour T&P, royality, EMF &DMF and taxes of all materials excluding GST Complete with all T&P and supervision charges etc as per the approved drawing, design & specification & direction of the Engineer-in-charge. |
| 19 | Rigid smooth centering and shuttering for R.C.C. works / mass concrete including false works and dismantling them after casting with all leads, lifts & delifts including cost, conveyance, taxes etc. of all materials excluding GST, all labour charges, T&P, Cess etc. complete as directed by the Engineer-in-charge. Please Enable Macros to View BoQ information |