| 1 | First Year Raising of Plantation |
| 2 | Clearing boundary line to a width of 1.5 Mtr to facilitate survey |
| 3 | Survey with prismatic compass |
| 4 | Providing and fixing 15x15x90 cm boundary stone of hard stone with top 30 cm chisel dressed on all four sides including top (cost of excavation, refilling and concrete etc. to be paid for separately). |
| 5 | Transportation of split stones of size 60 x 20 x20 cm including loading and unloading |
| 6 | Slash felling, drag, heap and arrange the remainings of felling along continuous contur lines |
| 7 | Collection of 60cm bamboo, reed or wooden stakes for aligning |
| 8 | Transport of stakes by hired vehicle from Amband |
| 9 | Aligning and staking at an espacement of 2m x 2m |
| 10 | Digging pits of size 30x30x30 cm in hard soil for poly bag/root trainer seedlings. hard soil before rain/100pits |
| 11 | Digging pits of size 30x30x30 cm in Ordinary soil for poly bag/root trainer seedlings. ordinary soil before rain/100pits |
| 12 | Digging pits of size 30x30x30 cm in Ordinary soil after rain |
| 13 | Transportation Charges, loading and unloading charges of Root Trainer Seedlings from Central Nursery Kulathupuzha to Planting Site and to return the hyco to central nursery( 5250 Nos) |
| 14 | Covering pits, digging planting holes & planting seedlings |
| 15 | Making platform of size 60cm x 60 cm with 30 cm depth in uphill side with inward slopes |
| 16 | First year 1st knife weeding during May- June |
| 17 | Replacing casualties |
| 18 | Cost of chemical fertilizer including transporting charge @ 100 gram per plant |
| 19 | Loading, unloading and transportation of the fertilizer to the site of plantation |
| 20 | Application of chemical fertilizer after rain during December-January (1/3 of FSR rate) |
| 21 | First year 2nd weeding (Knife weeding) ( August-September) |
| 22 | Cost of pesticide (coragen) for applying against leaf coiling and skeltanizer @ 3 ml/10 litre |
| 23 | Application of pesticide in the leaves of plant by using sprayer |
| 24 | First year 3rd weeding (Knife weeding) (December-January) |
| 25 | Additional Weeding (Subject to the approval of CCF) |
| 26 | Construction of temporary shed for the stay of staff and labours |
| 27 | Clearing boundary line to a width of 5.2 M and fire tracing for fire protection |
| 28 | Cost of plantation board |
| 29 | 2. SECOND YEAR MAINTENANCE Second year first weeding (May-June) |
| 30 | Transportation, Loading and Unloading charges of one year old Bigger Basketted Teak Seedlings (525 Nos) |
| 31 | Replacing casualities |
| 32 | Repairing damaged plateforms 60x 60x 30(May- June) (1/2 of FSR) |
| 33 | Digging pits of size 30x30x30 cm in Ordinary/hard soil for poly bag/root trainer seedlings. ordinary soil After rain/100pits |
| 34 | Second year second weeding (Ausust-September) |
| 35 | Cost of chemical fertilizer including transporting charge @ 100 gram/plant (as per soil test report) |
| 36 | Loading, unloading and transportation of the fertilizer to the site of plantation |
| 37 | Application of fertilizer during August - September (Subject to soil test and field requirement ) |
| 38 | Second year Third weeding (October- November) |
| 39 | Additional weeding (Allowed subject to CCF's field inspection) |
| 40 | Clearing boundary line to a width of 5.2 M and fire tracing for fire protection |
| 41 | 3. THIRD YEAR MAINTENANCEThird year first knife weeding (May-June) |
| 42 | Repairing damaged platforms 60x 60x 30(May- June) Allowed as per the CCFs inspection/ subjected to actual requirement |
| 43 | Replacing casualties (June) |
| 44 | Cost of chemical fertilizer including transporting charge @ 100 gram/plant (as per soil test report) |
| 45 | Loading, unloading and transportation of the fertilizer to the site of plantation |
| 46 | Application of fertilizer during August - September (Subject to soil test and field requirement ) |
| 47 | Third year second knife weeding (October-November) |
| 48 | Third year additional weeding (Allowed subject to CCF's field inspection) |
| 49 | Clearing boundary line to a width of 5.2 M and fire tracing for fire protection |
| 50 | Maintenance of temporary shed (Half of the FSR) |
| 51 | Provision for VDA |
| 52 | Contractors Profit (10%) Please Enable Macros to View BoQ information |