| 1 | LABOUR |
| 2 | (138) Fitting 6 channel cross arms, AB switch,DO fuse, Station class LA, HT & LTconnections upto OH lines, etc. onexisting DP structure, Fixing distributionbox/provision for one set (3No.) of LTfuses, drawing sufficient length of GIearthing leads to the ground for earthing,excluding provision of earthing &mounting of Transformer on poles. |
| 3 | (144) Erecting one 100kVA Transformer toexisting DP and giving connections,including loading from TMR/SRS/otherstacking place & unloading at site butexcluding cost for transportingtransformer. |
| 4 | (156) Fitting one additional Fuse unit andgiving connection from Transformer tofuse and Distribution box to LT OH line. |
| 5 | (1105) Stringing of 1.1 kV Aerial bunchedcable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messengerthrough existing poles |
| 6 | (170) Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single poleincluding conveyance of materials. |
| 7 | (174) Fitting one LT 2 line cross arm on HT orLT existing poles including fittinginsulators and binding the same with LTLine. |
| 8 | (569) Dismantling one section fuse fromdistribution box and bringing back tosection store. |
| 9 | (926) Excavation of cable trench ofappropriate size ( normally 1.2m deepand 0.35m /0.5m wide for single/doublerun) in all classes of soil includingbreaking clods, watering, ramming andsectioning of soil bank etc. and backfilling the soil after cable laying andconsolidating the soil in layers of 75cm (excluding laying of cable). |
| 10 | (702) Labour charges for loading HT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 11 | (703) Labour charges for loading HT A typepole from the stacking place andunloading the same at work site(transportation by any vehicle). |
| 12 | (706) Labour charges for loading LT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 13 | (726) Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4numbers of poles excluding loading&unloading charges. |
| 14 | (503) Dismantling one damaged 11kVPSC/RCC pole after disconnecting stays,strut etc. attached thereon and stackingthe same. |
| 15 | (504) Dismantling (without damage) one 11kVPSC/RCC pole after disconnecting stays,strut etc. attached thereon and stackingthe same. |
| 16 | (505) Dismantling one damaged 11kV A typepole after disconnecting stays, strut etc.attached thereon and stacking the same. |
| 17 | (513) Dismantling (without damage) one km11kV line (three conductors) includingdismantling cross arm, insulators, disc,disconnecting jumper connection, rollingthe conductor and stacking the materials. |
| 18 | (515) Dismantling (without damage) one Vcross arm/Channel cross arm fromexisting Pole and bringing back tosection store. |
| 19 | (516) Dismantling (without damage) oneChannel cross arm from existing DPstructure and bringing back to sectionstore. |
| 20 | (517) Dismantling (without damage) one ABswitch from existing structure andbringing back to section store. |
| 21 | (518) Dismantling one HT pin insulator withpin and bring back to section store. |
| 22 | (324) Additional rate for refitting/redoing oneDisc set while renewing any type of11kV cut pole. |
| 23 | (363) Drilling hole of various sizes on existingChannel/Cross Arm. |
| 24 | (113) Fitting and erecting one HT A typeSingle Pole in position, including fittingcross arm, digging and back filling pit inordinary soil (as per standards), drawingsufficient length of GI earthing leadsfrom F clamp through V cross arm to theground for earthing (excluding provisionof earthing). |
| 25 | (116) Fitting and erecting one HT Double PoleStructure using PSC pole in positionincluding fitting 2 channel cross arms,digging and back filling pit in ordinarysoil, drawing sufficient length of GIearthing leads through all cross arms tothe ground for earthing (excludingprovision of earthing). |
| 26 | (135) Stringing of one km 11kV line withACSR Raccoon (3 conductors) afterfitting insulators and giving jumperconnections including cutting andremoving tree branches wherevernecessary excluding cut point works. |
| 27 | (119) Fitting and providing one HT Stay for11kV pole, including digging and backfilling pit in ordinary soil. |
| 28 | (159) Providing one Driven Earth using Steelrod of size 19mm dia, 2.5m length at aminimum distance of 1.5m away fromthe pole/structure and maintainingstandard distance between different earthpipes in loose soil. |
| 29 | (179) Additional rate for providing one HT Pinwith insulator, complete on any type ofHT pole. |
| 30 | (180) Additional rate for providing one F topbracket complete, on any type of HTpole. |
| 31 | (553) Dismantling one damaged LT PSC/RCCpole after disconnecting stays, strut etc.attached thereon and stacking the same. |
| 32 | (555) Dismantling (without damage) LT stayincluding digging pit in all classes of soiland backfilling. |
| 33 | (559) Dismantling (without damage) one LTPSC/RCC Strut pole including removalof clamps and stacking. |
| 34 | (560) Dismantling one LT 2 line cross armwith clamp from existing pole andstacking. |
| 35 | (566) Dismantling (without damage) one kmLT three phase 4 wire OH line conductorby dismantling cross arms, insulatorsand stacking the conductors in rolls properly. |
| 36 | (405) Additional rate for refitting/redoing oneShackle Set, including reshacling onespan, while renewing any type of LTpole. |
| 37 | (451) Disconnecting and lowering down thesingle phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work. |
| 38 | (452) Disconnecting and lowering down thethree phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work. |
| 39 | (1109) Erection of Anchor clamp / dead endclamp for LT ABC of any size |
| 40 | (1110) Erection of suspension clamp for LTABC of any size |
| 41 | (1115) Installing One No. Insulation piercingconnector of size Main :16 to 95,Tap:1.5 to 16 Sq.mm |
| 42 | (1116) Installation of Insulation piercingconnector for main to service line main:16-95 sqmm, Tap : 4-35 sqmm |
| 43 | (1132) Fitting of one No. pole top serviceconnection box of standard size (up to 4way) using ss strap/B&N of suitable sizein to the PSC/A poles at the standardheight excluding giving connections |
| 44 | (1134) Providing End Caps |
| 45 | (1141) Installing One No. 4 way SatelliteConnector of size Main :16 to 95, Tap:4to 35 Sq.mm to the LT AB cable ofStandard size |
| 46 | (929) Laying HT XLPE UG cable of sizesbeyond 3x185 sq mm and upto andincluding 3x300 sqmm includingconveying cable from Sub RegionalStore/stacking place to work site andlaying it carefully using cable rollers,taking through stone ware/G.I.pipes atroad crossing/culverts/bridges etc.whereever necessary, providingidentification tags at 5m intervals, fillingthe space around the cable with riddledsoil and covering the top with bricks,providing cable route markers at 100mintervals, inclusive of cost of allmaterials (other than cost of GI/HDPEpipe & UG Cable), labour and transportincluding crane charges excludingexcavation and backfilling. |
| 47 | (C-202324-4558-3) Laying LT UG cable of 1.1KV grade of95 sq mm to 185 sq mm size cableincluding including excavation, sandcushioning, Protective covering andrefilling the trench |
| 48 | (C-202324-4558-4) Supply and making out door endtermination of LT UG cable of size3*1/2 185 sq mm |
| 49 | (204) Erecting one LT PSC Pole in positionincluding digging & back filling pit inordinary soil. |
| 50 | (205) Providing Stay for LT poles includingdigging & back filling pit in ordinarysoil. |
| 51 | (206) Providing Strut using LT PSC poleincluding digging and back filling pit inordinary soil. |
| 52 | (221) Fitting one No. Section fuse on LT linewith dropping cables, crimping sockets,connecting with bolt & nut etc. |
| 53 | (610) Dismantling one ordinary streetlight/CFL/LED fitting from existing poleand refitting the same on newly erectedpole including disconnecting andreconnecting wires. |
| 54 | (611) Dismantling one 2x40W fluorescent tubefitting from the existing pole andrefitting the same on newly erected poleincluding disconnecting andreconnecting wires. |
| 55 | (711) Dismantling one Transformer (upto andincluding 160kVA) from existingstructure and loading to any vehicledirectly, including disconnectingHT/LT/Earth connections. |
| 56 | (927) Additional rate for excavation of cabletrench of appropriate size (normally1.2m deep and 0.35m /0.5m wide forsingle/double run) in exceptionally hardconditions (like in ordinary rock). * (Asper the PWD Standard Data book,ordinary rock is defined as any materialwhich can be quarried or split withcrowbars or wedges). |
| 57 | (933) Doing one cable end termination on HTXLPE UG cables of sizes beyond 3x185sqmm and upto and including 3x300 sqmm using the cable jointing kit supplieddepartmentally after makingfencing,caution board and all othersafety measures including charges forcable jointer etc. complete as per thedirection of the departmental officers. |
| 58 | (934) Mounting and connecting HT XLPE UGcable ends of all sizes upto and including3x300 sq mm with special type cableclamps, bolts, nuts, terminal protectorsetc.including cost of extra materials ifneeded and giving necessary jumperconnections. |
| 59 | (936) Additional rate for excavating trench ontarred/concrete surface of specified size. |
| 60 | (952) Providing concrete muffing of size0.45x0. 45x1.5m (0.5m above GL and1m below GL). Excavation0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides. |
| 61 | (953) Providing Transformer fencing to aheight of 1.8 m above ground level usingMS Angle frames of size ISA50x50x6mm for outer frame, 2 runs of40 x 6 MS flat for horizondal brasingand grills with MS rods 8 mm Dia @10cm c/c for verticals, providing gatewith locking arrangements, providingdanger board & name board, embedingthe legs in cement concrete 1:2:4,footing of size 30cmx30cmx50cm,painting with synthetic enamel paint twocoats over one coat of iron primer etccomplete, incl cost of transportation |
| 62 | (954) Cleaning and levelling of transformeryard/RMU, spreading 40 mm brokenstone in yard for a thickness of 10 cmabove bed of 10 cm thick 6 mm brokenstone, after constructing a curb wall ofheight 20cm above ground and 10cmbelow level including cost of allmaterials and charges for conveying,spreading, consolidating etc. |
| 63 | Total of BoQ1 Please Enable Macros to View BoQ information |