| 1 | Please Enable Macros to View BoQ information |
| 2 | For Providing Comprehensive Maintenance of HT Panel , LT Panel , Transformer in Block and related allied accessories in Block -2 (OR D Block Hospital ) and DG set At Trauma & old Building at Hamidia Hospital Bhopal (for one year). (Detail Schedule Attached) SECTION 4 BILL OF QUANTITIES (BOQ) General Description of work : For Providing Comprehensive Maintenance of HT Panel , LT Panel , Transformer in Block and related allied accessories in Block -2 (OR D Block Hospital ) and DG set At Trauma & old Building at Hamidia Hospital Bhopal (for one year). 1st Call. P. A. C. 13959700.00 on Non SOR, Completion period 365 Days (i/c rainy season) Probable Amount of Contract : (Rs. In Figure) :- 13959700.0 (Rs. In Words) :- One Crore Thirty Nine Lakh Fifty Nine Thousand Seven Hundred Only SOR Item No. Particulars of Item of Work Quantity Unit Rate Amount (in figure) Amount (in words) Remarks I II III IV V VI VIII IX |
| 3 | Scope Of Work - including Servicing and Repairing - of all VCB's, Relays,VCB,ACB,Contactors Trip Mechanism , automatic safety shutter Busbars, Switch gears, Coil , Trip Mechanism , Bus Coupler Panel . Replacement = of Cable End Termination , all current amp and voltmeters , al CT's and PTs , DO Switch, AB Switch, Jumper , Contactors, Spring charged motor, Jointing Kit, Lux (In brief - all majors and minor repair work after ME to LT Panel included ) Not Included - All Consumables like batteries with semiconductor,capacitors all safety devices , replacement of whole switchgears (ACB,VCB) UPS etc .also replacement of whole electrical equipment is not included . a Comprehensive Maintenance of HT Panel 1.0 Each Job/Year 459170.0 459170.0 b Comprehensive Maintenance of LT Panel 1.0 Each Job/Year 2043468.0 2043468.0 |
| 4 | Scope of Work - including servicing and repairing (Whichever necessary for proper working ) all major (Excluding Pimary/Secondry Coil ) and minor parts inside transformer and cable end termination , Related VCB, Switch Gear , All Related Breakers , routine servicing from OEM Authorised person etc.(Specification -3150KVA, 33/0.433 KV, 3Phase, 50 Hz, Dyn 11 , indoor Dry type, Cast resin, copper wound transformer).Jointing Kit Replacement is included 3.0 Each Job/Year 513413.0 1540238.0 a Comprehensive Maintenance of Transformer |
| 5 | Providing Annual Maintenance contract (AMC) of DG set of Fallowing Capacity with AMF Panel including of diesel engine, AC alternator, fuel injection pump, all motor stater , all motors connected to DG set rewinding/repairing , self starter, Engine alternator , replacement of component for parts such as oil filter, rubber component, meter fuel pipe, repairing and rewinding of self starter and related accessories, cleaning of air filter, fuel tank, changing of oil and battery ,Battery Charger as and when required . Periodical maintenance and checking should be done in approved manner . Air filter, fuel filter, oil filter are to be replaced once in year, oil cleaning filters and oils once in year , engine should be overhauled or repaired if requied , no extra payment will be charged by the contractor . Battery should be replaced of appropiate rating if required .The Material required for unforseen condition to keep machinery in working condition shall be arranged by the contractor .(Diesel and oil shall be provided by the GMC authorities ) a 1500KVA-2Nos. & 500KVA-1nos rating Sterling Wilson Make DG 1.0 Each Job 2835000.0 2835000.0 b 500 KVA DG Set (1 Nos at Trauma And 3 Nos. at Old Hamidia Hospital bhopal.)(5% Esclation from previous year)(Will be handover as per requirement ) 4.0 Each Job 180341.0 721364.0 TOTAL A Rs. 7599239.0 OPERATION |
| 6 | 3 Wireman (3 * 12 Month) 36.0 Operator/month 19661.0 707779.0 3 Helper (3 * 12 Month) 36.0 Operator/month 17327.0 623786.0 |
| 7 | 3 Wireman (3 * 12 Month ) 36.0 Operator/month 19661.0 707779.0 3 Helper (3 * 12 Month ) 36.0 Operator/month 17327.0 623786.0 |
| 8 | 3 Wireman (3 * 12 Month ) 36.0 Operator/month 19661.0 707779.0 |
| 9 | 3 Wireman (3 * 12 Month ) 36.0 Operator/month 19661.0 707779.0 |
| 10 | 3 Wireman (3 * 12 Month ) 36.0 Operator/month 19661.0 707779.0 |
| 11 | 1 Supervisor (1 *12 Month) 12.0 Operator/month 21861.0 262332.0 TOTAL Reliever (5 * 12 Month )(consider All Holiday) 60.0 Operator/month 21861.0 1311660.0 TOTAL B Rs. 6360461.0 ABSTRACT TOTAL A + TOTAL B Rs. 13959700.0 INWORDS One Crore Thirty Nine Lakh Fifty Nine Thousand Seven Hundred Onle Executive EngineerPWD E/M Division No. 1, Bhopal |