| 1 | M&L for Repair to Desert Cooler Removing of old paint complete with emery paper and cleaning with scrapper and preparation of internal surfaces & bottom of the desert coolers and apply one coats of black bituminous paint complete all as specified and as directed. |
| 2 | All as per item No. 1 here in before but applying one coats of synthetic enamel paint to external surfaces of desert coolers including steel grills, removing of wooden grass pad & refixing the same after necessary work side panel etc complete all as specified and as directed. |
| 3 | Taking down carefully old unserviceable water pumps heavy duty of 1/7HP 230 volts 50 HZ single phase S&F new submersible type water pump including necessary wire connection etc. complete all as specified and as directed. |
| 4 | Taking down carefully fan motor from existing desert coolers and S&F new fan motor 1/5 to 1/6 HP 230 volts, 50 HZ, including mounting legs & nuts bolts as reqd at site complete all as specified and as directed. |
| 5 | Taking down carefully fan motor 1/5 to 1/6 HP 230 volts, 50 HZ, from existing desert coolers of each camp at MFFR and refixing after rewinding with super enameled copper wire of existing size complete including replacement of bush/bearing, mounting legs & nuts bolts capacitor 4 Mfd as reqd at site complete all as specified and as directed. Note:- Contractor will be arranged all required T&P (winding machine) repair for desert cooler motor/sevicing i.e winding/greasing /oiling in AGE (l) MFFR yard. |
| 6 | Taking down old unsv capacitor from the existing desert coolers & providing new 4mfd capacitor in same possition complete all as specified and as directed. |
| 7 | Taking down following old/rusted part of desert cooler and replace with 20 gauge GI plain sheet class-III including riveting, welding, nuts and bolts as per requirement complete all as specified and as directed:- (a) Bottom tank as per existing size. |
| 8 | (b) Top cover as per existing size. |
| 9 | (c) Sides panel as per existing size. |
| 10 | (d) Supporting jali as per existing size. |
| 11 | (e) Front grill including nuts bolts and washers suitable for existing desert coolers including necessary wire connection, regulator & on/off switch etc as per site requirement. |
| 12 | S&F in repair Wood wool pad for desert coolers (set of three) complete all as specified and as directed. |
| 13 | S&F in repair Honey comb type pad for desert cooler ( set of three) as per site requirement of any size and type complete all as specified and as directed. |
| 14 | S&F in repair Fan blades made of aluminium for desert cooler as per sample any size complete all as specified and as directed. |
| 15 | Supply and fix in repair of desert cooler regulator step type for speed control complete all as specified and as directed. |
| 16 | S&F in repair of PVC pipe 15mm for desert cooler including all necessary 'T' joints & clamps complete all as specified and as directed. |
| 17 | S&F in repair of Elbow of PVC for desert cooler complete all as specified and as directed. |
| 18 | S&F in repair tap mounting with nipple 1/2\\" as per sample complete all as specified and as directed. |
| 19 | S&F in repair water outlet nipple with washers and check nuts complete all as specified and as directed. |
| 20 | DEEP FREEZER: Servicing and Cleaning of complete deep freezer and make it serviceable by replacing the defective parts like indicator light, thermostat, door/lid gasket,filter/drier,defrost button,relay and overload protection,capacitor,pcb,capillary tube, suction and discharge tubes,hinges, handle and lock assemble etc complete all as specified and as directed. Note: Following parts shall be measured and paid seperately and repair shall be carried out by OEM or his authorised Dealer.contractor shall have submit the MOU with OEM or his authorised Dealer beforing accepting the tender. |
| 21 | (a) Supply and fix in repair of old unsv compressor with new one as per existing make /model suitable for deep freezer 320 ltr complete all as specified and as directed. |
| 22 | (b) Supply and fix in repair of old unsv compressor with new one as per existing make /model suitable for deep freezer 405 ltr complete all as specified and as directed. |
| 23 | (c) Supply and fix in repair of old unsv damaged outer body including lid with new one as per existing make /model suitable for deep freezer 320 ltr complete all as specified and as directed. |
| 24 | (d) Supply and fix in repair of old unsv damaged inner body with new one as per existing make /model suitable for deep freezer 320 ltr complete all as specified and as directed. |
| 25 | (e) Supply and fix in repair of old unsv condensing coil with new one as per existing make /model/mtrl suitable for deep freezer 320 ltr complete all as specified and as directed. |
| 26 | (f) Supply and fix in repair of old unsv evaporating coil with new one as per existing make /model/mtrl suitable for deep freezer 320 ltr complete all as specified and as directed. |
| 27 | (g) Supply and fix in repair condenser fan motor of 320 Ltr capacity deep freezer complete all as specified and as directed. |
| 28 | (h) Supply and filling of refrigerant gas R134(a) after identification and rectification of leakage of deep freezer capacity 320/405ltrs complete all as specified and as directed. |
| 29 | WATER COOLER: Servicing and Cleaning of complete water cooler of capacity 60/120 or 150/180 and make it serviceable by replacing the defective parts like thermostat,capacitor,drip tray,piercer,relay and overload protection,capillary tube,handle and lock assemble etc complete all as specified and as directed. Note: Following parts shall be measured and paid seperately.Repair shall be carried out by OEM or his authorised Dealer.contractor shall have submit the MOU with OEM or his authorised Dealer beforing accepting the tender. |
| 30 | Supply and fix in repair of old unsv compressor with new one as per existing make /model suitable for Water coolers 60/120 Ltrs with necessary accessaries complete all as specified and as directed. |
| 31 | Supply and fix in repair of old unsv compressor with new one as per existing make /model suitable for Water coolers 150/180 Ltrs with necessary accessaries complete all as specified and as directed. |
| 32 | Supply and fix in repair of old unsv condensing coil with new one as per existing make /model/mtrl suitable for water cooler 60/120 ltr capicity complete all as specified and as directed. |
| 33 | Supply and fix in repair of old unsv condensing coil with new one as per existing make /model/mtrl suitable for water cooler 150/180 ltr capicity complete all as specified and as directed. |
| 34 | Supply and fix in repair of old unsv evaporating coil with new one as per existing make /model/mtrl suitable for water cooler 60/120 ltr capicity complete all as specified and as directed. |
| 35 | Supply and fix in repair of old unsv evaporating coil with new one as per existing make /model/mtrl suitable for water cooler 150/180 ltr capicity complete all as specified and as directed. |
| 36 | Supply and fix in repair of old unsv cooling fan blade with new one as per existing size/make /model/mtrl suitable for water cooler 150/180 or 60/120 ltr capicity complete all as specified and as directed. |
| 37 | Supply and fix in repair of old unsv fan motor with new one of capacity 0.1 HP to 0.5 HP as per existing make /model/mtrl suitable for water cooler 150/180 or 60/120 ltr capicity complete all as specified and as directed. |
| 38 | Supply and fix in repair of old /burnt wiring/damaged internal wiring with new copper wiring as per existing cable size suitable for water cooler 150/180 or 60/120 ltr capicity complete all as specified and as directed. |
| 39 | Supply and filling of refrigerant gas R134(a) after identification and rectification of leakage of water Cooler capacity 150/180 or 60/120ltrs complete all as specified and as directed. |
| 40 | Supply and fix in repair push cock (stainlees steel) for water cooler as per sample existing complete all as specified and as directed. |
| 41 | Taking down existing Exhaust fan, ceiling fan, sealing cable end, dismantling blades and removing fan and blades to store complete all as specified and as directed by Engr-in-charge. Please Enable Macros to View BoQ information |
| 42 | Taking down existing Exhaust fan, ceiling fan, sealing cable end, dismantling blades and removing fan and blades to store complete all as specified and as directed by Engr-in-charge. Please Enable Macros to View BoQ information |