| 1 | Cartage including loading, unloading & Proper Stacking of following stock materials from Store Centre/Departmental Store to Dump site. |
| 2 | A. PCC Pole 8.5 mtr Long |
| 3 | B. PCC Pole 11 mrt Long |
| 4 | C. ACSR Weasel Conductor |
| 5 | D. ACSR Rabbit Conductor |
| 6 | E. XLPE Cable 3X70/3X120/3X185 Sq. MM |
| 7 | F. ABC (3X120x1+95+1x16) Sq MM |
| 8 | G. 11 KV Cable Jointing kit O/D & I/D |
| 9 | H. LT Distrubution Box |
| 10 | I. T/F 250 KVA |
| 11 | J. Other Matching Material |
| 12 | Dragging of PCC/ST Pole 8.5 mtr Long from dump site to pit site |
| 13 | Dragging of PCC/ST Pole 11 mrt Long from dump site to pit site |
| 14 | Grouting & Binding of stay in 1:4:8 ratio with ratio Cement, Sand & Brick Ballast including cost of all grouting materials RESSPO Norms. |
| 15 | Earthing of Pole/TF as per RESPO Norms. |
| 16 | Febrication and erection of Single PCC Pole 8.5Mtr including Grouting with 1:4:8 ratio Cement, Sand & Brick Ballast & including digging of pit and fixing of all accessories clamp * earthing as per RESSPO Norms. ( Cost of Clamp borne by contractor) |
| 17 | Febrication and erection of Single PCC Pole 11 Mtr including Grouting with 1:4:8 ratio Cement, Sand & Brick Ballast & including digging of pit and fixing of all accessories clamp * earthing as per RESSPO Norms. ( Cost of Clamp borne by contractor) |
| 18 | Febrication and erection of Double PCC Pole 8.5 Mtrincluding Grouting with 1:4:8 ratio Cement, Sand & Brick Ballast & including digging of pit and fixing of all accessories clamp * earthing as per RESSPO Norms. ( Cost of Clamp borne by contractor) |
| 19 | Stringing, Sagging, bonding and jumpering of ACSR Weasel Conductor as per RESPO Norms. |
| 20 | Stringing, Sagging, bonding and jumpering of ACSR Rabbit Conductor as per RESPO Norms. |
| 21 | Stringing, Sagging, bonding and jumpering of AB Conductor (3X120x1+95+1x16) as per RESPO Norms. |
| 22 | Laying of 11 KV 3X70/3X120/3X185 mm XLPE Single cable by digging of trench underground ( only XLPE Cable will be supplied by department) |
| 23 | Installation of 11 KVcable jointing kit I/D& O/D as per RESPO Norms. |
| 24 | Instalation of Distrubuion Box as per RESSPO Norms |
| 25 | Providing and Installation of Tailless Fuse Unit Set 400 AMP.(With GST) |
| 26 | Concreating of Pole as per RESPO Norms. |
| 27 | Providing and Installation of Aluminum Lug. as per RESSPO Norms. |
| 28 | Installation of Guarding Angle 20 Spam as per RESSPO Norms |
| 29 | Installation of Guarding Angle Clamp as per RESSPO Norms |
| 30 | Providing and Installation of LT Clamp, & Stay Clamp as per RESSPO Norms. |
| 31 | Providing and Installation of T-OFF Clamp as per RESSPO Norms. |
| 32 | Providing and Installation of Holding Clamp, I HooK, Top & Dropper Channel as per RESSPO Norms. |
| 33 | Providing and Installation of F Clamp & Cross Arms as per RESSPO Norms. |
| 34 | Providing and Installation of Barbed Wire as per RESSPO Norms. |
| 35 | Providing and Installation of Danger Board as per RESSPO Norms. |
| 36 | Providing and Installation of Nut & Bolts as per RESSPO Norms. |
| 37 | Plinth & Fencing of T/F as per RESSPO Norms. |
| 38 | Boring Type Earthing as per RESSPO Norms. |
| 39 | Mounting of 250 KVA T/F as per RESSPO Norms. |
| 40 | Dismantling of old line including dismantling material carriage dump site to store as per RESSPO Norms. |
| 41 | (उक्त कार्यो के आलावा यदि कोई कार्य पूर्ण करने में किसी अन्य वस्तु ,उपकरण या कार्य की आवश्यकता होगी तो इन्ही दरो के अंदर सम्पादित की जायेगी ) Please Enable Macros to View BoQ information |