| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 Sq.M on plan) including dressing of sides and ramming ob bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a load of 50m |
| 2 | Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work |
| 3 | Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc.for mass concrete. |
| 4 | Centring and shuttering including strutting, propping etc. and removal of form for:Lintels, beams, plinth beams, girders, bressumer sand cantilevers. |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement: All work above plinth level upto floor V level |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete uoto plinth level. Thermo Mechanically Treated bars |
| 9 | M-150 brick work in 1:4 cement & Course sand mortar in foundation and plinth including supply of all materials labour complection of the work but in 1:4 one ceement & four coarse sand of 2.20 F.M mortar UPPWD SOR 2020/305a UPPWD SOR 305a |
| 10 | M-150 brick work in 1:4 cement & course sand mortar Above plinth including supply of all materials labour complection of the work but in 1:4 one ceement & four coarse sand of 2.20 F.M mortar UPPWD SOR 2020/305b UPPWD SOR 305a |
| 11 | 12mm cement plaster of mix1:6 (1 cement: 6 coarse sand) |
| 12 | 15mm cement plaster of mix1:6 (1 cement: 6 coarse sand) |
| 13 | Finishing wall with water proofing cement paint of required shade: New work (Two or more coats applied 3.84 kg/b sqm) Based on uppwd sor |
| 14 | Providing precast cement concrete Jall 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia mild steel wire including centering and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement: 3 fine sand) etc. complete excluding plastering of the jambs, sills and soffits. 50mm thick |
| 15 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 16 | Painting with synthetic enemel paint of approved brand and manufacture to give an even shade:Two or more coats on new work.UPPWD SOR 2020/13.61.1/P-952 |
| 17 | Earth work in rough excavation, banking, earth in layers not exceeding 20cm in depth clods watering rolling each layers with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layers with power roller of minimum 8 tonnes and dr |
| 18 | Demolishing of brick work manually /by mechanical means including disposal of material with in 50mtr demolishing cement concrete DAR/15.2.1/SOR/2020 |
| 19 | Cement concrete with 4cm based approved stone ballast coarse sand and cement in the proportion of 4:2:1 including supply of all material labour tools and plants etc required for all completion of work (item code 5.06) |
| 20 | Dry brick on edge flooring in required pattern with bricks of class designation 150 including filling joints with Local sand (with F.P.S. 5 bricks) complete. Please Enable Macros to View BoQ information |