| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer Electric Division -II JPDCL Jammu Name of Work: Supply survey, erection, testing and commissioning for Restoration of Electric Infrastructure Damages Due to incessant Rain/Flash Floods During intervening night 25th & 26th of August, 2025 on Turnkey Basis under the jurisdiction of Executive Engineer ED-II JPDCL, Jammu.” Contract No: E-Nit No. 20 of 2026-27 Dated 09-06-2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # |
| 2 | Item Description |
| 3 | Replacement of damaged ST 9 Mtrs Pole |
| 4 | 9 Mtr. Long |
| 5 | GI-V cross arm |
| 6 | GI Channel Cross arm |
| 7 | Pin Insulators |
| 8 | Disc Insulators |
| 9 | Galvanised Nuts & Bolts |
| 10 | Danger Plates |
| 11 | Anti Climbing Device with clamps |
| 12 | Earthing Complete by G.I Pipe 40 mm or G.I Rod 20 mm 2.5 m Long |
| 13 | Guy Set Complete |
| 14 | Cement Bottoming |
| 15 | Red Oxide |
| 16 | Al Paint |
| 17 | Replacement of damaged 9 Mtrs PCC Pole |
| 18 | 9 Mtrs long PCC Pole |
| 19 | GI-V cross arm |
| 20 | GI Channel Cross arm |
| 21 | Pin Insulators |
| 22 | Disc Insulators |
| 23 | Galvanised Nuts & Bolts |
| 24 | Danger Plates |
| 25 | Anti Climbing Device with clamps |
| 26 | Earthing Complete by G.I Pipe 40 mm or G.I Rod 20 mm 2.5 m Long |
| 27 | Stone Pad |
| 28 | Guy Set Complete |
| 29 | Replacement of damaged 8 Mtrs ST Pole |
| 30 | 8 Mtr. Long |
| 31 | GI-U Clamps for Shackle Insulators |
| 32 | 16 KN Ploymer Shackle Insulators |
| 33 | Galvanised Nuts & Bolts |
| 34 | Danger Plates |
| 35 | Anti Climbing Device with clamps |
| 36 | Earthing Complete by G.I Pipe 40 mm or G.I Rod 20 mm 2.5 m Long |
| 37 | Al. Jointing Sleeves |
| 38 | L.T line Spacers |
| 39 | Guy Set Complete |
| 40 | Cement Bottoming |
| 41 | Red Oxide |
| 42 | Al Paint |
| 43 | Replacement of damaged 8 Mtrs PCC Pole |
| 44 | 8 Mtrs long PCC Pole |
| 45 | GI-U Clamps for Shackle Insulators |
| 46 | 16 KN Ploymer Shackle Insulators |
| 47 | Galvanised Nuts & Bolts |
| 48 | Danger Plates |
| 49 | Anti Climbing Device with clamps |
| 50 | Earthing Complete by G.I Pipe 40 mm or G.I Rod 20 mm 2.5 m Long |
| 51 | Al. Jointing Sleeves |
| 52 | L.T line Spacers |
| 53 | Guy Set Complete |
| 54 | Stone Pads |
| 55 | Replacement of damaged HT ACSR Weasel Conductor |
| 56 | ACSR conductor |
| 57 | GI V cross -arm with top Bracket including clamp |
| 58 | 11 KV Pin Insulator |
| 59 | 11 KV Disc Insulator |
| 60 | Galvanised Nuts & Bolts |
| 61 | Replacement of damaged LT ACSR Weasel Conductor |
| 62 | ACSR conductor |
| 63 | U-clamps |
| 64 | Shackle insulator |
| 65 | Galvanised Nuts & Bolts |
| 66 | Replacement of HT AB Cable 120 mm sq. |
| 67 | AB Cable 120 mm sq. |
| 68 | PCC pole 9 mtr long |
| 69 | Heat Shrinkable Outdoor Cable Termination Kit |
| 70 | Suspension/Tension Clamp |
| 71 | Nuts & Bolts |
| 72 | Stone Pad |
| 73 | Mid Span Straight Through Jointing Kit |
| 74 | Anti Climbing device |
| 75 | Replacement of LT AB Cable 120 mm sq. |
| 76 | AB Cable 120 mm sq. |
| 77 | Straight through cable joint Kit |
| 78 | Suspension/Tension Clamp |
| 79 | Nuts & Bolts |
| 80 | Replacement of damaged Structures of 100 KVA Sub-Stations |
| 81 | Shifting of Existing 100 KVA transformer. |
| 82 | ST Poles 9 Mtr. Long |
| 83 | LT PVC Cable Single Core 185 mm Sq. |
| 84 | 11 KV Disc insulator with fittings |
| 85 | 11 KV Pin insulator with fittings |
| 86 | GI Channel, Angle Iron & Flat iron of sizes including clamps |
| 87 | 11 KV LA (Stn. type) |
| 88 | 11 KV HG Set |
| 89 | 11 KV GO Set |
| 90 | Nuts & Bolts |
| 91 | Earthing of Substation complete |
| 92 | Danger plates with clamps |
| 93 | Cement bottoming |
| 94 | Red Oxide Paint |
| 95 | Al. Piant |
| 96 | Guy rod Complete |
| 97 | GI Barbed Wire for anti climbing |
| 98 | Sundry Items |
| 99 | Replacement of damaged Structures of 250 KVA Sub-Stations |
| 100 | Shifting of Existing 250 KVA transformer. |
| 101 | ST Poles 9 Mtr. Long |
| 102 | LT PVC Cable Single Core 240 mm Sq. |
| 103 | 11 KV Disc insulator with fittings |
| 104 | 11 KV Pin insulator with fittings |
| 105 | GI Channel, Angle Iron & Flat iron of sizes including clamps |
| 106 | 11 KV LA (Stn. type) |
| 107 | 11 KV HG Set |
| 108 | 11 KV GO Set |
| 109 | Nuts & Bolts |
| 110 | Earthing of Substation complete |
| 111 | Danger plates with clamps |
| 112 | Cement bottoming |
| 113 | Red Oxide Paint |
| 114 | Al. Piant |
| 115 | Guy rod Complete |
| 116 | GI Barbed Wire for anti climbing |
| 117 | Sundry Items Total in Figures 0.0 0.0 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 No Quoted Rate in Figures Select 0.0 0.0 29 Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |