| 1 | (Part-A) Supply & Erection Providing & Fixing of Stone pad | (Part-A) Supply & Erection Providing & Fixing of Stone pad |
| 2 | Providing & Fixing of HT Tee Channel | Providing & Fixing of HT Tee Channel |
| 3 | Providing & Fixing of Holding clamp for HT Tee channel | Providing & Fixing of Holding clamp for HT Tee channel |
| 4 | Providing & Fixing of Holding clamp | Providing & Fixing of Holding clamp |
| 5 | Providing & Fixing of F Bracket with nut & bolt | Providing & Fixing of F Bracket with nut & bolt |
| 6 | Providing & Fixing of supporting Clamp for cable | Providing & Fixing of supporting Clamp for cable |
| 7 | Providing & Fixing of Clamp with not & bolt for above fittings | Providing & Fixing of Clamp with not & bolt for above fittings |
| 8 | Providing & Fixing of Gaurding Angle with Holding Clamp | Providing & Fixing of Gaurding Angle with Holding Clamp |
| 9 | Providing & Fixing of MS Top Channel | Providing & Fixing of MS Top Channel |
| 10 | Providing & Fixing of MS Dropper Channel | Providing & Fixing of MS Dropper Channel |
| 11 | Providing & Fixing of Cross bracing MS Angle Set | Providing & Fixing of Cross bracing MS Angle Set |
| 12 | Providing & Fixing of Danger Board with Alu. Binding wire | Providing & Fixing of Danger Board with Alu. Binding wire |
| 13 | Providing & Fixing of clamps with Nut & Bolt off size for above fitting | Providing & Fixing of clamps with Nut & Bolt off size for above fitting |
| 14 | Providing & Fixing of GI Pipe 6\\" DIA | Providing & Fixing of GI Pipe 6\\" DIA |
| 15 | Providing & Fixing of HDPE Pipe (140mm ODPN-4 80 Grade uv stabliyed) | Providing & Fixing of HDPE Pipe (140mm ODPN-4 80 Grade uv stabliyed) |
| 16 | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 17 | Carriage of ST Pole 11/13 Mtr. Long. (SP 55) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | Carriage of ST Pole 11/13 Mtr. Long. (SP 55) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 18 | Cartiage of 11kv XLPE Cable 3*185sqmm from Electricity Store Centre Tajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) | Cartiage of 11kv XLPE Cable 3*185sqmm from Electricity Store Centre Tajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) |
| 19 | Carriage of 11kv VCB 200/100/5A (Outgoing) & 11kv VCB 600/300/5A 350 MVA (Incoming) from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) | Carriage of 11kv VCB 200/100/5A (Outgoing) & 11kv VCB 600/300/5A 350 MVA (Incoming) from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) |
| 20 | Cartiage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) 11KV Disc Insulator with fitting (48 nos), 11kv X Arm V type 65*65*6mm (89 nos), X Arm Holding Clamp with nut & bolt (89 nos), 11kv pin insulator with pin (307 nos) Weasal Conductor (5360 mtr), Cable Jointing Kit O/D 3*185sqmm (36 nos), cable supporting wire (2900mtr) Barbed wire GI (10 kg) Earthing Complete (72 nos), Stay Set Complete (20 nos), Gaurding wire GI 6swg (140 kg ), 11kv fuse set (1 nos), 11kv TPMO (1 nos) | Cartiage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) 11KV Disc Insulator with fitting (48 nos), 11kv X Arm V type 65*65*6mm (89 nos), X Arm Holding Clamp with nut & bolt (89 nos), 11kv pin insulator with pin (307 nos) Weasal Conductor (5360 mtr), Cable Jointing Kit O/D 3*185sqmm (36 nos), cable supporting wire (2900mtr) Barbed wire GI (10 kg) Earthing Complete (72 nos), Stay Set Complete (20 nos), Gaurding wire GI 6swg (140 kg ), 11kv fuse set (1 nos), 11kv TPMO (1 nos) |
| 21 | Erection and grouting of Single Pole PCC 8.5 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Single Pole PCC 8.5 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 22 | Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast)PCC 8.5 Mtr. long (Double Pole) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast)PCC 8.5 Mtr. long (Double Pole) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 23 | Erection and grouting of ST Pole 13 Mtr. long Single in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 13 Mtr. long Single in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 24 | Erection and grouting of ST Pole 11 Mtr. long Single in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 11 Mtr. long Single in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 25 | Erection and grouting of STP 11 Mtr. long (Double pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of STP 11 Mtr. long (Double pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 26 | Installation, Commissioning and Testing of new 11 kv VCB (I/C & Outgoing) by Dragging of VCB from substation primises to control room by mannual labour (Bandhani).Complete with alignment, cable dressing, control wiring, earthing & testing as required. including the cost of arrangement of labour, T&P required for proper completion of work. | Installation, Commissioning and Testing of new 11 kv VCB (I/C & Outgoing) by Dragging of VCB from substation primises to control room by mannual labour (Bandhani).Complete with alignment, cable dressing, control wiring, earthing & testing as required. including the cost of arrangement of labour, T&P required for proper completion of work. |
| 27 | Earthing of 11kv VCB Pannel with 2 number GI Earth Pits using 3mtr long GI Pipe 80mm DIA electrode Connected through GI Strip 50*6mm complete in all respect. including the cost of arrangement of labour, T&P required for proper completion of work. | Earthing of 11kv VCB Pannel with 2 number GI Earth Pits using 3mtr long GI Pipe 80mm DIA electrode Connected through GI Strip 50*6mm complete in all respect. including the cost of arrangement of labour, T&P required for proper completion of work. |
| 28 | Laying & Dressing of 11 KV XLPE cable 3x185sqmm and making cable connection, bus bar connection with complete all respects. As per RESPO norms. | Laying & Dressing of 11 KV XLPE cable 3x185sqmm and making cable connection, bus bar connection with complete all respects. As per RESPO norms. |
| 29 | Laying of 11 KV XLPE cable 3x185sqmm in underground Trench including exavation, sand cushioning, brick protection, warning tape & backfilling etc. including the cost of arrangement of labour, T&P required for proper completion of work. complete all respects. As per RESPO norms. | Laying of 11 KV XLPE cable 3x185sqmm in underground Trench including exavation, sand cushioning, brick protection, warning tape & backfilling etc. including the cost of arrangement of labour, T&P required for proper completion of work. complete all respects. As per RESPO norms. |
| 30 | Laying of 11 KV XLPE cable 3x185 sqmm (double Circuit) Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth as per norms | Laying of 11 KV XLPE cable 3x185 sqmm (double Circuit) Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth as per norms |
| 31 | Mounting of 11KV XLPE Cable 3x185sqmm through GI pipe on bouble pole and making loop as per RESPO norms | Mounting of 11KV XLPE Cable 3x185sqmm through GI pipe on bouble pole and making loop as per RESPO norms |
| 32 | Laying of 11KV XLPE Cable 3x185 sqmm overhead with cable supporting wire & making loop as per RESPO Norms and direction by superivising Engineer. | Laying of 11KV XLPE Cable 3x185 sqmm overhead with cable supporting wire & making loop as per RESPO Norms and direction by superivising Engineer. |
| 33 | Filling of 11 KV Jointing Kit 3x185sqmm OD/ID and making connection as per direction by supervising engineer. | Filling of 11 KV Jointing Kit 3x185sqmm OD/ID and making connection as per direction by supervising engineer. |
| 34 | Laying, sagging, stringing, binding and jumpering of ACSR Weasal conductor in HT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P reauired for proper completion of work. | Laying, sagging, stringing, binding and jumpering of ACSR Weasal conductor in HT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P reauired for proper completion of work. |
| 35 | Erection of GI Barbed Wire including stretching, binding & fixing on existing erected poles complete in all respects as per RESPO norms | Erection of GI Barbed Wire including stretching, binding & fixing on existing erected poles complete in all respects as per RESPO norms |
| 36 | Erection of Gaurding below 11kv overhead line using 6 SWG GI wire complete with Gaurding Engle clamps nut & Bolt binding complete in all respects as per RESPO norms | Erection of Gaurding below 11kv overhead line using 6 SWG GI wire complete with Gaurding Engle clamps nut & Bolt binding complete in all respects as per RESPO norms |
| 37 | Installation of TPMO as direction by supervising Engineer. | Installation of TPMO as direction by supervising Engineer. |
| 38 | Installation of 11kv Fuse Set as direction by supervising Engineer. | Installation of 11kv Fuse Set as direction by supervising Engineer. |
| 39 | Erection & Grouting of Stay set Complete as direction by supervising Engineer. | Erection & Grouting of Stay set Complete as direction by supervising Engineer. |
| 40 | Installation of Earthing Complete as per RESPO norms and direction by supervising Engineer. | Installation of Earthing Complete as per RESPO norms and direction by supervising Engineer. |