|
| 1 | Non Schedule Items | Non Schedule Items |
| 2 | Repairing of lift door drive system including testing and commissioning complete as required | Repairing of lift door drive system including testing and commissioning complete as required |
| 3 | Repairing of Door motor system including testing and commissioning complete as required | Repairing of Door motor system including testing and commissioning complete as required |
| 4 | Supply, Installation, Testing and Commissioning (SITC) of Over Load Sensor complete in all respects | Supply, Installation, Testing and Commissioning (SITC) of Over Load Sensor complete in all respects |
| 5 | Replacement of lift Car Operating Panel (COP) including dismantling of existing panel, supplying, fixing, wiring, testing and commissioning complete as required and as directed by Engineer-in-Charge | Replacement of lift Car Operating Panel (COP) including dismantling of existing panel, supplying, fixing, wiring, testing and commissioning complete as required and as directed by Engineer-in-Charge |
| 6 | Replacement of lift Land Operating Panel (LOP) including dismantling of existing panel, supplying, fixing, wiring, testing and commissioning complete as required and as directed by Engineer-in-Charge | Replacement of lift Land Operating Panel (LOP) including dismantling of existing panel, supplying, fixing, wiring, testing and commissioning complete as required and as directed by Engineer-in-Charge |
| 7 | Supply, Installation, Testing and Commissioning (SITC) of Automatic Rescue Device (ARD) including testing and commissioning , complete in all respects | Supply, Installation, Testing and Commissioning (SITC) of Automatic Rescue Device (ARD) including testing and commissioning , complete in all respects |
| 8 | Comprehensive Annual Maintenance Contract of 01 no. Goods Lift | Comprehensive Annual Maintenance Contract of 01 no. Goods Lift |