Name of Work:- GENERAL-new-Barbed Wire Fencing At Kombhramettu Area- Saya Block, Perla Division-General Civil Work
Sl. No.
Item Description
1
Barbed Wire Fencing
2
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
3
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4
OD168165/2025-2026:Supply and fixing in position precast cement concrete fencing post of size 165x7.5x9 cm or available nearest size digged the post in excavation up to 450mm depth from ground level 3M interval and supports whenever necessary including all cost and labour charges etc. complete as per technical specifications.
5
OD167707/2025-2026:Fencing with R.C.C. post placed at required distance, embedded in soil, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire, between the two posts fitted and fixed with G.I staples on wooden plugs or G.I binding wire (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately and Department supply GI Barbed Wire ):- Payment to be made per metre labour cost of total length of barbed wire used . Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.