|
| 1 | Dismantling brick work or stone work in lime of cement mortar including stacking of materials as directed by engineer —in —charge with in a distance of 60 m. |
| 2 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge. |
| 3 | Laying of C.C. 1:4:8 ( M-7.5) in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and Crushed stone Grit ( 20 mm to 40mm) including all cost of materials,T&P and labours etc. complete. |
| 4 | Centering and shuttering for R.C.C. work including all cost of materials,T&P , labours and other accessories required for proper completion of work. |
| 5 | 1st class brick work in 1:4 cement mortar with class brick M-150, coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work |
| 6 | 1st class brick work in 1:4 cement mortar with old brick received from dismentaling of old wall , coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work. |
| 7 | 12mm thick plaster with cement in proportion of 1:3 ( cement and fine sand FM not over 1.25 ) ,brick work minimum thickness not than 10mm including supply of all material labour t and p etc required for proper completion of the work. |
| 8 | Laying R.C.C. work in 1:2:4 (M20) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. |
| 9 | Bending, binding cutting placing in position reinforcement steel including cost of binding wire and tack wilding with material and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. |
| 10 | Structural steel work riveted, bolted or welded in builtup sections, trusses etc ..and applying a priming coat steel primer . |
| 11 | Supply and fixing Galvanized corrugated iron roofing 24 B.W.G. in position including supply of material labour, tools and plants etc required for proper completion of work and including wastage. |
| 12 | Distempering two coat of oil bound distemper of approved make of Burger, Jenson & Nicholsen, Shalimar, Asian, Nerolac over on priming coat of cement primer on new surface after thoroughly brushing the surface free from mortar drooping and other foreign matter and also including preparing the surface even with plaster of paris/shiting and sand papered sooth including cost of all material. Labour T&P etc. required for proper completion of work. Please Enable Macros to View BoQ information |