| 1 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 2 | E/W in Excavation in foundation trences in ordinary soil (Via classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts leveling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approveddesign, building specification and direction of E/I. |
| 3 | Providing local sand filling in foudation - do- do all completed work as per specification and direction of E/I. |
| 4 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete |
| 9 | Providing E/W in filling in plinth -do- -do- all complete job as per specification and direction of E/I. 30% of Qua. Of item No. (1,2,3 & 4) |
| 10 | providing Tor steel reinforcement of required dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL) As per drawing. |
| 11 | Supplying, fitting and fixing M.S. Grill made of 20x6mm M.S. Flate as per approved design and drawing, properly fabricated with joints continuous fillet welded and finished smooth carriage of grill to work site, hoisting as per building specification and direction of E/I. (where materials is not supplied by the deptt.) |
| 12 | Providing 12mm cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 13 | Providing 1.5mm cement punning including curing, carriage of water with all leads and lift as per building specification and direction of E/I. |
| 14 | Disposal of excavated soil -do- -do- all complete job as per specification and directionof E/I. |
| 15 | Carriage of Material |
| 16 | (i) Cement+ Steel-2km(P) |
| 17 | (iii) Sand [Lead-1KM(K)+24KM(P)] |
| 18 | (iii) Stone Chips [Lead- 1Km (K) + 24Km (P)] |
| 19 | (iii) Bricks [Lead- 1Km (K) + 7Km (P)] |
| 20 | Total |
| 21 | Add: 18% GST |
| 22 | Total Amount |
| 23 | Add : 1% Labour Cess |
| 24 | Add : for Side Photography and Signboard Please Enable Macros to View BoQ information |