|
| 1 | DISTRICT-DIBRUGARHRadiographic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 2 | 800 mm N.B. |
| 3 | 550 mm N.B. |
| 4 | 500 mm N.B. |
| 5 | 400 mm N.B. |
| 6 | 350 mm N.B. |
| 7 | 300 mm N.B. |
| 8 | 250 mm N.B. |
| 9 | 200 mm N.B. |
| 10 | 150 mm N.B. |
| 11 | 100 mm N.B. |
| 12 | 75 mm N.B. |
| 13 | 50 mm N.B. |
| 14 | Ultrasonic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 15 | 800 mm N.B. |
| 16 | 550 mm N.B. |
| 17 | 500 mm N.B. |
| 18 | 400 mm N.B. |
| 19 | 350 mm N.B. |
| 20 | 300 mm N.B. |
| 21 | 250 mm N.B. |
| 22 | 200 mm N.B. |
| 23 | 150 mm N.B. |
| 24 | 100 mm N.B. |
| 25 | 75 mm N.B. |
| 26 | 50 mm N.B. |
| 27 | Retention Charges for Welding Inspectors: |
| 28 | One Welding Inspector per Day |
| 29 | Two Welding Inspector per Day |
| 30 | Three Welding Inspector per Day |
| 31 | Holiday Detection of Coating (3LPE/Coal Tar Coating) |
| 32 | One Unit per Day |
| 33 | Thickness Assessment of Steel Pipelines (Underground/Aboveground) as per relevant codes and standards: |
| 34 | 800 mm N.B. |
| 35 | 550 mm N.B. |
| 36 | 500 mm N.B. |
| 37 | 400 mm N.B. |
| 38 | 350 mm N.B. |
| 39 | 300 mm N.B. |
| 40 | 250 mm N.B. |
| 41 | 200 mm N.B. |
| 42 | 150 mm N.B. |
| 43 | 100 mm N.B. |
| 44 | Retention Charges of NDT inspector for carrying out Thickness Assessment of steel pipeline |
| 45 | Transportation of Contractor Personnel along with necessary NDT equipment from Contractor’s Camp Location to AGCL Work site (on call basis) . |
| 46 | DISTRICT-TINSUKIARadiographic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 47 | 800 mm N.B. |
| 48 | 550 mm N.B. |
| 49 | 500 mm N.B. |
| 50 | 400 mm N.B. |
| 51 | 350 mm N.B. |
| 52 | 300 mm N.B. |
| 53 | 250 mm N.B. |
| 54 | 200 mm N.B. |
| 55 | 150 mm N.B. |
| 56 | 100 mm N.B. |
| 57 | 75 mm N.B. |
| 58 | 50 mm N.B. |
| 59 | Ultrasonic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 60 | 800 mm N.B. |
| 61 | 550 mm N.B. |
| 62 | 500 mm N.B. |
| 63 | 400 mm N.B. |
| 64 | 350 mm N.B. |
| 65 | 300 mm N.B. |
| 66 | 250 mm N.B. |
| 67 | 200 mm N.B. |
| 68 | 150 mm N.B. |
| 69 | 100 mm N.B. |
| 70 | 75 mm N.B. |
| 71 | 50 mm N.B. |
| 72 | Retention Charges for Welding Inspectors: |
| 73 | One Welding Inspector per Day |
| 74 | Two Welding Inspector per Day |
| 75 | Three Welding Inspector per Day |
| 76 | Holiday Detection of Coating (3LPE/Coal Tar Coating) |
| 77 | One Unit per Day |
| 78 | Thickness Assessment of Steel Pipelines (Underground/Aboveground) as per relevant codes and standards: |
| 79 | 800 mm N.B. |
| 80 | 550 mm N.B. |
| 81 | 500 mm N.B. |
| 82 | 400 mm N.B. |
| 83 | 350 mm N.B. |
| 84 | 300 mm N.B. |
| 85 | 250 mm N.B. |
| 86 | 200 mm N.B. |
| 87 | 150 mm N.B. |
| 88 | 100 mm N.B. |
| 89 | Retention Charges of NDT inspector for carrying out Thickness Assessment of steel pipeline |
| 90 | Transportation of Contractor Personnel along with necessary NDT equipment from Contractor’s Camp Location to AGCL Work site (on call basis) . |
| 91 | DISTRICT-SIVASAGARRadiographic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 92 | 800 mm N.B. |
| 93 | 550 mm N.B. |
| 94 | 500 mm N.B. |
| 95 | 400 mm N.B. |
| 96 | 350 mm N.B. |
| 97 | 300 mm N.B. |
| 98 | 250 mm N.B. |
| 99 | 200 mm N.B. |
| 100 | 150 mm N.B. |
| 101 | 100 mm N.B. |
| 102 | 75 mm N.B. |
| 103 | 50 mm N.B. |
| 104 | Ultrasonic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 105 | 800 mm N.B. |
| 106 | 550 mm N.B. |
| 107 | 500 mm N.B. |
| 108 | 400 mm N.B. |
| 109 | 350 mm N.B. |
| 110 | 300 mm N.B. |
| 111 | 250 mm N.B. |
| 112 | 200 mm N.B. |
| 113 | 150 mm N.B. |
| 114 | 100 mm N.B. |
| 115 | 75 mm N.B. |
| 116 | 50 mm N.B. |
| 117 | Retention Charges for Welding Inspectors: |
| 118 | One Welding Inspector per Day |
| 119 | Two Welding Inspector per Day |
| 120 | Three Welding Inspector per Day |
| 121 | Holiday Detection of Coating (3LPE/Coal Tar Coating) |
| 122 | One Unit per Day |
| 123 | Thickness Assessment of Steel Pipelines (Underground/Aboveground) as per relevant codes and standards: |
| 124 | 800 mm N.B. |
| 125 | 550 mm N.B. |
| 126 | 500 mm N.B. |
| 127 | 400 mm N.B. |
| 128 | 350 mm N.B. |
| 129 | 300 mm N.B. |
| 130 | 250 mm N.B. |
| 131 | 200 mm N.B. |
| 132 | 150 mm N.B. |
| 133 | 100 mm N.B. |
| 134 | Retention Charges of NDT inspector for carrying out Thickness Assessment of steel pipeline |
| 135 | Transportation of Contractor Personnel along with necessary NDT equipment from Contractor’s Camp Location to AGCL Work site (on call basis) . |
| 136 | DISTRICT-CHARAIDEORadiographic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 137 | 800 mm N.B. |
| 138 | 550 mm N.B. |
| 139 | 500 mm N.B. |
| 140 | 400 mm N.B. |
| 141 | 350 mm N.B. |
| 142 | 300 mm N.B. |
| 143 | 250 mm N.B. |
| 144 | 200 mm N.B. |
| 145 | 150 mm N.B. |
| 146 | 100 mm N.B. |
| 147 | 75 mm N.B. |
| 148 | 50 mm N.B. |
| 149 | Ultrasonic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 150 | 800 mm N.B. |
| 151 | 550 mm N.B. |
| 152 | 500 mm N.B. |
| 153 | 400 mm N.B. |
| 154 | 350 mm N.B. |
| 155 | 300 mm N.B. |
| 156 | 250 mm N.B. |
| 157 | 200 mm N.B. |
| 158 | 150 mm N.B. |
| 159 | 100 mm N.B. |
| 160 | 75 mm N.B. |
| 161 | 50 mm N.B. |
| 162 | Retention Charges for Welding Inspectors: |
| 163 | One Welding Inspector per Day |
| 164 | Two Welding Inspector per Day |
| 165 | Three Welding Inspector per Day |
| 166 | Holiday Detection of Coating (3LPE/Coal Tar Coating) |
| 167 | One Unit per Day |
| 168 | Thickness Assessment of Steel Pipelines (Underground/Aboveground) as per relevant codes and standards: |
| 169 | 800 mm N.B. |
| 170 | 550 mm N.B. |
| 171 | 500 mm N.B. |
| 172 | 400 mm N.B. |
| 173 | 350 mm N.B. |
| 174 | 300 mm N.B. |
| 175 | 250 mm N.B. |
| 176 | 200 mm N.B. |
| 177 | 150 mm N.B. |
| 178 | 100 mm N.B. |
| 179 | Retention Charges of NDT inspector for carrying out Thickness Assessment of steel pipeline |
| 180 | Transportation of Contractor Personnel along with necessary NDT equipment from Contractor’s Camp Location to AGCL Work site (on call basis) . |
| 181 | DISTRICT-JORHATRadiographic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 182 | 800 mm N.B. |
| 183 | 550 mm N.B. |
| 184 | 500 mm N.B. |
| 185 | 400 mm N.B. |
| 186 | 350 mm N.B. |
| 187 | 300 mm N.B. |
| 188 | 250 mm N.B. |
| 189 | 200 mm N.B. |
| 190 | 150 mm N.B. |
| 191 | 100 mm N.B. |
| 192 | 75 mm N.B. |
| 193 | 50 mm N.B. |
| 194 | Ultrasonic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 195 | 800 mm N.B. |
| 196 | 550 mm N.B. |
| 197 | 500 mm N.B. |
| 198 | 400 mm N.B. |
| 199 | 350 mm N.B. |
| 200 | 300 mm N.B. |
| 201 | 250 mm N.B. |
| 202 | 200 mm N.B. |
| 203 | 150 mm N.B. |
| 204 | 100 mm N.B. |
| 205 | 75 mm N.B. |
| 206 | 50 mm N.B. |
| 207 | Retention Charges for Welding Inspectors: |
| 208 | One Welding Inspector per Day |
| 209 | Two Welding Inspector per Day |
| 210 | Three Welding Inspector per Day |
| 211 | Holiday Detection of Coating (3LPE/Coal Tar Coating) |
| 212 | One Unit per Day |
| 213 | Thickness Assessment of Steel Pipelines (Underground/Aboveground) as per relevant codes and standards: |
| 214 | 800 mm N.B. |
| 215 | 550 mm N.B. |
| 216 | 500 mm N.B. |
| 217 | 400 mm N.B. |
| 218 | 350 mm N.B. |
| 219 | 300 mm N.B. |
| 220 | 250 mm N.B. |
| 221 | 200 mm N.B. |
| 222 | 150 mm N.B. |
| 223 | 100 mm N.B. |
| 224 | Retention Charges of NDT inspector for carrying out Thickness Assessment of steel pipeline |
| 225 | Transportation of Contractor Personnel along with necessary NDT equipment from Contractor’s Camp Location to AGCL Work site (on call basis) . |
| 226 | DISTRICT-GOLAGHATRadiographic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 227 | 800 mm N.B. |
| 228 | 550 mm N.B. |
| 229 | 500 mm N.B. |
| 230 | 400 mm N.B. |
| 231 | 350 mm N.B. |
| 232 | 300 mm N.B. |
| 233 | 250 mm N.B. |
| 234 | 200 mm N.B. |
| 235 | 150 mm N.B. |
| 236 | 100 mm N.B. |
| 237 | 75 mm N.B. |
| 238 | 50 mm N.B. |
| 239 | Ultrasonic Testing of Welding Joints of M.S. Pipelines as per relevant codes and standards: |
| 240 | 800 mm N.B. |
| 241 | 550 mm N.B. |
| 242 | 500 mm N.B. |
| 243 | 400 mm N.B. |
| 244 | 350 mm N.B. |
| 245 | 300 mm N.B. |
| 246 | 250 mm N.B. |
| 247 | 200 mm N.B. |
| 248 | 150 mm N.B. |
| 249 | 100 mm N.B. |
| 250 | 75 mm N.B. |
| 251 | 50 mm N.B. |
| 252 | Retention Charges for Welding Inspectors: |
| 253 | One Welding Inspector per Day |
| 254 | Two Welding Inspector per Day |
| 255 | Three Welding Inspector per Day |
| 256 | Holiday Detection of Coating (3LPE/Coal Tar Coating) |
| 257 | One Unit per Day |
| 258 | Thickness Assessment of Steel Pipelines (Underground/Aboveground) as per relevant codes and standards: |
| 259 | 800 mm N.B. |
| 260 | 550 mm N.B. |
| 261 | 500 mm N.B. |
| 262 | 400 mm N.B. |
| 263 | 350 mm N.B. |
| 264 | 300 mm N.B. |
| 265 | 250 mm N.B. |
| 266 | 200 mm N.B. |
| 267 | 150 mm N.B. |
| 268 | 100 mm N.B. |
| 269 | Retention Charges of NDT inspector for carrying out Thickness Assessment of steel pipeline |
| 270 | Transportation of Contractor Personnel along with necessary NDT equipment from Contractor’s Camp Location to AGCL Work site (on call basis) . Please Enable Macros to View BoQ information |