|
| 1 | Annual comprehensive maintenance of 2 Nos. (13-Passengers), Johnson make lifts with 13 landing/opening with ARD at rated speed of 1.75 mtr./ second which includes routine, preventive and break down maintenance for a period of one year including repair / replacement of all worn out items, accessories and control equipments, defective parts with minimum down time as per inventory, terms & conditions enclosed etc. complete as required. |
| 2 | Annual comprehensive maintenance of 2 Nos. (16-Passengers), Johnson make lifts with 13 landing/opening with ARD at rated speed of 1.75 mtr./ second which includes routine, preventive and break down maintenance for a period of one year including repair / replacement of all worn out items, accessories and control equipments, defective parts with minimum down time as per inventory, terms & conditions enclosed etc. complete as required. |
| 3 | Annual comprehensive maintenance of 1 Nos. (13-Passengers), Johnson make lifts with 14 landing/opening with ARD at rated speed of 1.75 mtr./ second which includes routine, preventive and break down maintenance for a period of one year including repair / replacement of all worn out items, accessories and control equipments, defective parts with minimum down time as per inventory, terms & conditions enclosed etc. complete as required. |
| 4 | Annual comprehensive maintenance of 1 Nos. (16-Passengers), Johnson make lifts with 14 landing/opening with ARD at rated speed of 1.75 mtr./ second which includes routine, preventive and break down maintenance for a period of one year including repair / replacement of all worn out items, accessories and control equipments, defective parts with minimum down time as per inventory, terms & conditions enclosed etc. complete as required. |
| 5 | Annual comprehensive maintenance of 12 Nos. (13-Passengers), Johnson make lifts with 16 landing/opening with ARD at rated speed of 1.75 mtr./ second which includes routine, preventive and break down maintenance for a period of one year including repair / replacement of all worn out items, accessories and control equipments, defective parts with minimum down time as per inventory, terms & conditions enclosed etc. complete as required. |
| 6 | Annual comprehensive maintenance of 6 Nos. (16-Passengers), Johnson make lifts with 16 landing/opening with ARD at rated speed of 1.75 mtr./ second which includes routine, preventive and break down maintenance for a period of one year including repair / replacement of all worn out items, accessories and control equipments, defective parts with minimum down time as per inventory, terms & conditions enclosed etc. complete as required |
| 7 | Supply and replacement damaged/non-working equipments/items of required suitable capacities/sizes i.e PIT Switch with Box & Cover (Round Type)-02 no,Buffer Switch Limit Switch type10A 415V AC-02 nos,FSR & Main limit switch Assembly-02 nos,MLS Bracket Assembly-02nos,OSG Tension WT. Wheel-01no etc. as required to make lift Job no. L-J8191 functional with their safety features including testing and putting into operation etc.complete in all respect as required as per inventory, terms & conditions enclosed. |
| 8 | Supply and replacement damaged/non-working equipments/items of required suitable capacities/sizes i.e FSR & Main limit switch Assembly-02 nos,MLS Bracket Assembly-02nos,PIT Switch with Box & Cover (Round Type)-02 no,5x7 Vertical Dot Mat. LED Display for Car Amber Colour. SP3. Overload Sticker-01 no,Car call board suitable for SP3 Serial comm. comtroller-01 no,Push button Braillen(NS Orange)-5 nos,Push button Braillen(UP Button Orange)-5 nos,etc. as required to make lift Job no. L-J8197 functional with their safety features including testing and putting into operation etc.complete in all respect as required as per inventory, terms & conditions enclosed. |
| 9 | Supply and replacement damaged/non-working equipments/items of required suitable capacities/sizes i.e PIT Switch with Box & Cover (Round Type)-02 no,Buffer Switch Limit Switch type10A 415V AC-02 nos,FSR & Main limit switch Assembly-02 nos,MLS Bracket Assembly-02nos,OSG Tension WT. Wheel-01no etc. as required to make lift Job no. L-J8201 functional with their safety features including testing and putting into operation etc.complete in all respect as required as per inventory, terms & conditions enclosed. |
| 10 | Supplying and installation of damaged/missing Ceiling Light Cool white Astra prime 5W,240V 50HZ,300LM 6500K for the illumination inside car lift for all 24 lifts (i/c rebate dismantle old material) etc. complete as required. Please Enable Macros to View BoQ information |