Tender For Upgradation Of Scada Systems For Synchronized Operation Of All Electromechanical Equipments Along With Requisite License Software (Both Engineering And Operating License) For 6 Mld Stp Alluchibagh, 2.21 Mld Stp Rajbagh (02 Jobs) (Adv. Cost, Alluchi-Bagh And Rajbagh-Jammu And Kashmir
TDR : 55891480
Tender Notice
Corrigendum Details
BOQ
8 Days Left
Alluchi-Bagh And Rajbagh
Jammu and Kashmir
Corrigendum : Tender For Upgradation Of Scada Systems For Synchronized Operation Of All Electromechanical Equipments Along With Requisite License Software (Both Engineering And Operating License) For 6 Mld Stp Alluchibagh, 2.21 Mld Stp Rajbagh (02 Jobs) (Adv. Cost
Name of Work:- Upgradation of SCADA Systems for synchronized operation of all electromechanical equipments along with requisite license software (both engineering and operating license) for 6 MLD STP Alluchibagh, 2.21 MLD STP Rajbagh (02 Jobs) (Adv. Cost of Rs. 40.00 Lacs)
Sl. No.
Item Description
1
Providing, installation, testing and commissioning of following :-1. Ultrasonic Level Transmitter of Range 0-10 Mtr for Main Sump also to be integrated with Existing SCADA as per the plant operational requirement. LU 240 (02 nos) Make (Siemens/Allen Bredley/Equivalent)2. Hydrostatic Level Transmitter of Range 0-10 Mtr for anoxic chambers also to be integrated with Existing SCADA as per the plant operational requirement.(02 nos ) Make (Siemens/Allen Bredley/Equivalent)3. DO Sensor Of Range 0-10 MG/L Mtr for Anoxic chambers with controller & Display with sensors and is to be integrated with Existing SCADA as per the plant operational requirement.(02 nos) Make (Siemens/Allen Bredley/Equivalent)4. Chlorine Leak Detector Sensor for leak detection with Leak Alarm system to be displayed in SCADA and to be integrated with Existing SCADA as per the plant operational requirement (01 nos) Make (Honeywell / Reputed) 5. Butterfly valve for anoxic chamber along with their Feedbacks like open, close feedback to be displayed in SCADA and also to be integrated with Existing SCADA as per the plant operational requirement .The valve should be capable of manual operation to bring the system fail safe (0-1 Bar ) pressure to be sustained by valve.(02 nos)...Contd as per Annexure A. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.