|
| 1 | Supplying & fixing suitable size GI box wih modular plate and cover in front on surface or in recess including providing and fixing 25 A modular socket outlet and 25 A modular SP MCB, “C” curve including connections, painting etc. as required. |
| 2 | Wiring for light/ power plug with 2X4 sq. mm FRLS PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit alongwith 1 No. 4 sq. mm FRLS PVC insulated copper conductor single core cable for loop earthing as required. |
| 3 | Supplying & fixing of ducting grill- Aluminium power coated high quality double louver air grill On/OFF function as per site requirement and per direction of engineer in charge. |
| 4 | Supply, installation, balancing and commissioning of factory fabricated GSS sheet metal rectangular/round ducting complete with gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per approved drawings and specifications of following sheet thickness complete as required.as per following required :- 24 guage of suitable size as per requirement (For inlet fresh air duct) |
| 5 | Providing and fixing of Earth Air Cooler -18TW-SS(SKY-E18TWSS) Air Cooler discharge comprising of minimum 18000 CMH Capacity with 200 Ltr Water Tank with wheels , 1800-2000 Sqft, Power 1.1/1.5 KW,Phase-Single/Three,Speed:variable/Single,Fan Type:3/4 Blade, Huminity Controller and Digital Controllera) Portable Design: Easily movable from one place to another, offering flexible cooling solutions.b) Energy Efficient: Consumes less electricity while delivering powerful cooling performance c) Cost-Effective Cooling: Provides an economical alternative to fixed air conditioning systems.d) Adjustable Airflow: Features adjustable fan speed and direction for customized cooling comfort.e)Water-Efficient Technology: Uses water evaporation for cooling while minimizing water consumption.f)Low Maintenance: Designed for easy cleaning and maintenance, ensuring long-lasting use.g)Durable & Sturdy: Built with high-quality materials for reliable performance in various environments. Kaava/ Maharaja/ Sky Air Cooler/ Cool wind. |
| 6 | Supplying and fixing 9 mm XLPE insulation on the exterior of sun exposed duct to prevent cooling loss decreases sound & increase efficency etc as required (for inlet cold duct) |
| 7 | Supplying and installation of volatage/ power fluctuation protection digital stabilizer 4 KVA having voltage Range (90-300 V) as per site requirement and as per direction of Engg-in-charge. |
| 8 | Supplying and fixing fire retardant anti vibration canvas cloth etc as per site requirement and as per direction of Engg in charge |
| 9 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. ( for cooler and water tank stand) |
| 10 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank |
| 11 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. 15 mm dia nominal bore |
| 12 | Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 15 mm nominal bore |
| 13 | Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (New work) : 15 mm nominal bore |
| 14 | Providing and fixing G.I. Union in existing G.I. pipe line, cutting and threading the pipe and making long screws, including excavation, refilling the earth or cutting of wall and making good the same complete wherever required : 15 mm dia nominal bore |
| 15 | Providing and fixing brass stop cock of approved quality : 15 mm nominal bore |
| 16 | Dismantling of RCC wall/brick wall manually /by mechanical means including stacking of steel bars and disposal of unserviceable material and repairing of damaged wall after dismantling /cutting including plastering etc as per direction of Engineer-in-charge Please Enable Macros to View BoQ information |