Tender For Provision Of 20 Smqs For Sgt And Below At Sdi Af Bangalore
Tender Overview
Project Description
Tender for Provision Of 20 Smqs For Sgt And Below At Sdi Af Bangalore
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 06-Jul-2026 | AMENDMENT 01 | Date | 29-Jul-2026 |
| 2 | 21-Jul-2026 | AMENDMENT 02 | Date | 10-Aug-2026 |
| 3 | 03-Aug-2026 | Amendment 3 | Date | 24-Aug-2026 |
| 4 | 14-Aug-2026 | Corrigendum04 | Date | 01-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | BOQ No.1 |
| 2 | GENERAL SUMMARY NOTE: Schedule ‘A’ Part II to XIV are prepriced by MES under Ser No. 1 to 13. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. |
| 3 | Lumpsum price worked out by the contractor for “SITE CLEARANCE AND DEVELOPMENT” as listed in Schedule ‘A’ Part–II |
| 4 | Lumpsum price worked out by the contractor for “INTERNAL WATER SUPPLY\\" as listed in Schedule ‘A’ Part–III |
| 5 | Lumpsum price worked out by the contractor for “INTERNAL ELECTRIC SUPPLY \\" as listed in Schedule ‘A’ Part - IV . |
| 6 | Lumpsum price worked out by the contractor for “ROAD / PATH / CULVERTt \\" as listed in Schedule ‘A’ Part - V . |
| 7 | Lumpsum price worked out by the contractor for \\"AREA DRAINAGE \\" as listed in Schedule ‘A’ Part - VI . |
| 8 | Lumpsum price worked out by the contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part – VII. |
| 9 | Lumpsum price worked out by the contractor for “RAIN WATER HARVESTING” as listed in Schedule ‘A’ Part – VIII. |
| 10 | Lumpsum price worked out by the contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part – IX. |
| 11 | Lumpsum price worked out by the contractor for “EXTERNAL ELECTRIC SUPPLY” as listed in Schedule ‘A’ Part – X. |
| 12 | Lumpsum price worked out by the contractor for “LIFT” as listed in Schedule ‘A’ Part – XI. |
| 13 | Lumpsum price worked out by the contractor for “LIGHTNING PROTECTION” as listed in Schedule ‘A’ Part – XII. |
| 14 | Lumpsum price worked out by the contractor for “FIRE FIGHTING” as listed in Schedule ‘A’ Part – XIII. |
| 15 | Lumpsum price worked out by the contractor for “FENCING /COMPOUND WALL/GATE ” as listed in Schedule ‘A’ Part – XIV. |
| 16 | Sch 'A' Part - I : BUILDINGS OR WORKSDesign and Construction of Married Accomodation 6 storey (Stilt parking + 5 storey) with permanent specifications with RCC framed structure in M-30 Design Mix seismic strengthening for zone III with PCC solid block masonry panel walls including ATT, wooden doors /Aluminium windows,Ceramic tiles flooring, polymer modified readymix plastering, oil bound distempering internally and weather emulsion painting externally, waterproofing treatment with PU modified membrane including RCC over head water tank for Fire fighting of capacity 25 KL with M-30 Design Mix as shown on drawing complete and earthquake resistance as per latest IS, GRIHA 3 star rating certification etc complete all as specified and as shown on drawings. Please Enable Macros to View BoQ information |
| 17 | Sch 'A' Part - I : BUILDINGS OR WORKSDesign and Construction of Married Accomodation 6 storey (Stilt parking + 5 storey) with permanent specifications with RCC framed structure in M-30 Design Mix seismic strengthening for zone III with PCC solid block masonry panel walls including ATT, wooden doors /Aluminium windows,Ceramic tiles flooring, polymer modified readymix plastering, oil bound distempering internally and weather emulsion painting externally, waterproofing treatment with PU modified membrane including RCC over head water tank for Fire fighting of capacity 25 KL with M-30 Design Mix as shown on drawing complete and earthquake resistance as per latest IS, GRIHA 3 star rating certification etc complete all as specified and as shown on drawings. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
TodayCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 8 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender