| 1 | BOQ No.1 |
| 2 | GENERAL SUMMARY NOTE: Schedule ‘A’ Part I to XVI are prepriced by MES under Ser No. 2 to 17. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. |
| 3 | Lumpsum price worked out by the contractor for “BUILDING or WORKS” as listed in Schedule ‘A’ Part–I |
| 4 | Lumpsum price worked out by the contractor for “SITE CLEARANCE/ DEVELOPMENT\\" as listed in Schedule ‘A’ Part–II |
| 5 | Lumpsum price worked out by the contractor for “DEMOLITION/DISMANTLING OF BUILDINGS,PCC ROAD & PQC, SEPTIC TANK, RCC DRAIN AND FENCING\\" as listed in Schedule ‘A’ Part–III |
| 6 | Lumpsum price worked out by the contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IV |
| 7 | Lumpsum price worked out by the contractor for “INTERNAL ELECTRIC SUPPLY” as listed in Schedule ‘A’ Part - V |
| 8 | Lumpsum price worked out by the contractor for “PCC ROAD/HARD STANDING\\" as listed in Schedule ‘A’ Part - VI . |
| 9 | Lumpsum price worked out by the contractor for “RIGID PAVEMENT(TARMAC)” as listed in Schedule ‘A’ Part – VII. |
| 10 | Lumpsum price worked out by the contractor for \\"SEWAGE DISPOSAL \\" as listed in Schedule ‘A’ Part VIII. |
| 11 | Lumpsum price worked out by the contractor for \\"RCC DRAIN \\" as listed in Schedule ‘A’ Part IX. |
| 12 | Lumpsum price worked out by the contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part – X. |
| 13 | Lumpsum price worked out by the contractor for “EXTERNAL ELECTRIC SUPPLY” as listed in Schedule ‘A’ Part – XI |
| 14 | Lumpsum price worked out by the contractor for “AIR CONDITIONING AND COOLING APPLIANCES\\" as listed in Schedule ‘A’ Part - XII. |
| 15 | Lumpsum price worked out by the contractor for “COMPRESSED AIR SUPPLY SYSTEM\\" as listed in Schedule ‘A’ Part - XIII. |
| 16 | Lumpsum price worked out by the contractor for “LIGHTNING PROTECTION\\" as listed in Schedule ‘A’ Part - XIV. |
| 17 | Lumpsum price worked out by the contractor for “FIRE ALARM, DETECTION, AND FIGHTING SYSTEM \\" as listed in Schedule ‘A’ Part - XV. |
| 18 | Lumpsum price worked out by the contractor for “EOT CRANE \\" as listed in Schedule ‘A’ Part - XVI. |
| 19 | Sch 'A' Part - XVII : BUILDING OR WORKSHANGAR PEB STRUCTURE Design, Supply and errection of I level Aircraft hangar of size 80.80 x 54.60 x 7.5m height with PEB Structure including RCC foundation with M-25 Design Mix and steel structure with Galvalume or Zincalume profiled corrugated colour coated sheet in roof, Turbo roof ventilators(with 5-6 ACPH), Horizontally openable gates for full width and height at both the sides, including PEB accessories, gutters, fixing of flashings, rain water pipes and including, electrically operated sliding door with wicket gate as per approved drawings duly accepted by both parties complete all as shown in drawings including one side Annexe RCC framed structure-double storied as shown on drawings on either sides of hangar with steel frame, anchor bolts, base plates and all structural steel items, rain water eaves gutters and down take pipes, bird proofing net,PCC block walls, flooring, doors/windows, toilet fittings, roof treatment, turbo air ventilators, false ceiling, flooring, finishes, finishes etc complete as shown on drawings, design parameters and specifications included in tender documents and as directed. Please Enable Macros to View BoQ information |
| 20 | Sch 'A' Part - XVII : BUILDING OR WORKSHANGAR PEB STRUCTURE Design, Supply and errection of I level Aircraft hangar of size 80.80 x 54.60 x 7.5m height with PEB Structure including RCC foundation with M-25 Design Mix and steel structure with Galvalume or Zincalume profiled corrugated colour coated sheet in roof, Turbo roof ventilators(with 5-6 ACPH), Horizontally openable gates for full width and height at both the sides, including PEB accessories, gutters, fixing of flashings, rain water pipes and including, electrically operated sliding door with wicket gate as per approved drawings duly accepted by both parties complete all as shown in drawings including one side Annexe RCC framed structure-double storied as shown on drawings on either sides of hangar with steel frame, anchor bolts, base plates and all structural steel items, rain water eaves gutters and down take pipes, bird proofing net,PCC block walls, flooring, doors/windows, toilet fittings, roof treatment, turbo air ventilators, false ceiling, flooring, finishes, finishes etc complete as shown on drawings, design parameters and specifications included in tender documents and as directed. Please Enable Macros to View BoQ information |