| 1 | Dismantling floors, hearth or wall tiling including cement mortar bedding (but not backing) and removing serviceable tiles to store and rubbish off the premises. |
| 2 | M&L for Non skid ceramic coloured tiles 7 to 8 mm thick (square/rectangular) area of each tile exceeding 0.06 sqm but not exceeding 0.11 sqm, as in floors set and jointed in neat cement slurry and pointed in white or coloured cement to match including 15mm thick screed bed or bedding layer in CM 1:6 complete all as specified and as directed by Engineer-in- Charge. |
| 3 | M&L for glazed ceramic coloured tiles 7 to 8 mm thick on vertical surfaces 350 x 250mm / 450 x 300mm, etc set and jointed in neat cement slurry and pointed in white or coloured cement over 10mm thick rendering in CM 1:4 complete all as specified and as directed by Engineer In-Charge. |
| 4 | M & L for White/ Colour Non skid Ceramic tiles 8 mm thick (square/ rectangular) polished, area of each tiles n exceeding 0.38 sqm , in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match with rectified edges ( joint free) etc set and jointed in neat cement slury over cement screed 15 mm thick 1:6. |
| 5 | M & L for White/ Colour Non skid Ceramic tiles 8 mm thick (square/ rectangular) polished, area of each tiles n exceeding 0.38 sqm , in vertical surfaces etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match with rectified edges (Joint free) as in vertical surfaces set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tiles over and incl 10 cm thick backing with cm 1:4. |
| 6 | Taking down cement plaster on brick or stone walls, ceilings, roof slab etc including racking out Joints, hacking for key, scrubbing down with water, etc |
| 7 | M&L for Rendering 15mm thick in two layer of 10mm thick over 5mm thick each on fair faces of concrete surfaces in CM 1:4 mixing with integral water proofing compound (WPC) @ of 3% of cement and finished even and smooth (without using extra cement) over cleaned, brushed by wire brush and washed by water etc complete all as specified and as directed. Note :- WPC will be measured and paid separately as supply only. |
| 8 | Supply only water proofing compound |
| 9 | Material & Labour for applying Two coats of acrylic emulsion paint of Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives over and including priming coat of exterior primer applied on new plastered surfaces of walls complete as mentioned in SSR all as specified and as directed . |
| 10 | M & L for 10mm thick cement plastering with cement mortar 1:4 brick or concrete surfaces of ceiling finished fair and even complete all as specified and directed. |
| 11 | Material and labour Two coats of Oil bound distemper over a coat of alkali resistant primer on walls, pillasters, cornices, etc., on newly plastered walls including preparation of surfaces with 1-3mm wall care putty all as specified and as directed. |
| 12 | Material and labour one coats of Oil bound distemper over a coat of alkali resistant primer on walls, pillasters, cornices, etc., on old plastered walls including preparation of surfaces all as specified and as directed. |
| 13 | Dismantling wall and ceiling boards (Fibre, pulp, insulation, etc) or insulation boards/slabs/blankets any thickness including cover fillets, frame work all as directed. |
| 14 | Material and labour for providing aluminium powder coated snap grid frame work supported by hanger 6mm dia GI (up to length as per site requirement) for false ceiling, adjusting level fixed to roof slabs/ walls/wooden members by means of ceiling cleats made out of GI flat 40x3 mm size 60 cm long and expansion hold fasteners 12.5mm dia 40mm long complete all as specified for false ceiling fixed with screws as per manufactures instructions |
| 15 | M & L Perforated particle board/ tiles in false ceiling for insula-tion and accoustic purposes, 60x60 cm in size, fixed with nails to timber framework or with staples on snap grid all as specified by Engr in charge. |
| 16 | Taking down wall panelling and similar works etc including fillets and fittings complete all as specified and directed by Engr in charge |
| 17 | S & F 5 mm thick PVC sheet fillet of width 35 mm for wall panelling inclusive of fixing on to wall to make PVC frame as per specification and drawing |
| 18 | S & F Solid PVC Wall panell Lining (fluted or flat type) consisting of 5mm thick Plain/grain printed PVC sheet of any colour inclusive of solvent cement and fixing at site on PVC frame, end beadings, border etc as per specifications and drawing mentioned as per SSR Part -II all as specified and directed by the Engr in charge. |
| 19 | Removing soil/ building materials/ debris Malba etc. to a distance of 15km or under, beyond the lead included in the rates, including loading, unloading and stacking at the destination away from the defence land Please Enable Macros to View BoQ information |