|
| 1 | Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary road. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.For Discharge exceeding 1.5 cum/sec but upto 4.5 cum/s . |
| 2 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. |
| 3 | Rehandling of Earthwork. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. |
| 4 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. |
| 5 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. Excluding Royality |
| 6 | Compaction. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling. |
| 7 | Compaction. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction. |
| 8 | Extra for rolling to specifications. |
| 9 | Dressing bed and preparation of sub grade for lining. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. |
| 10 | Dressing side slopes and preparation of sub grade for lining. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. |
| 11 | Dressing of earth work for New work or remodeling work. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. |
| 12 | Earthwork for lip cutting for lining of irrigation channels inclusive of all allowance, lead and dressing. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.0 to 1.5 m depth |
| 13 | Earthwork for lip cutting for lining of irrigation channels inclusive of all allowance, lead and dressing. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.Depth exceeding 1.5 m but up to 3.0 m. |
| 14 | Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. |
| 15 | Filling expansion joints with special impervious hot pour 10 mm wide. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. |
| 16 | Dag-belling for Single Kassi stroke minimum 7.5 cm depth. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. |
| 17 | Extra bitumen painting at 0.69 Kg. per Sqm. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. |
| 18 | Cement concrete lining 10cm. thick or less with mechanical Paver for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km |
| 19 | Laying plain cement conrete M15 in open foundation by using computerized concrete batch mixing plant including carriage by transist mixer within 1 Km lead. Complete as per drawing and technical specifications. |
| 20 | Supplying and laying of LDPE geomembrane sheet for sleepers of 150 micron thickness as approved by engineer incharge pasting on faces of sleepers including laying in position, carriage to site, jointing/welding etc. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. |
| 21 | Extra for compensation For ordinary earth/ordinary Clay taken from private land except Royality. |
| 22 | Any Other Please Enable Macros to View BoQ information |