|
| 1 | Balance Civil and Mechanical works of 1.00 MLD Water Treatment Plant including providing and fixing of 11 Nos. doors, 16 Nos. windows, white washing with lime, waterproof cement painting, providing and fixing of MS railing, laying of floor tiles, sanitary and plumbing works, repair of plaster, brick work and allied civil works along with supply, installation, testing and commissioning of mechanical works comprising raw water pumping machinery, motorized butterfly valves with actuators, filter backwash mechanical system, flow measuring devices, chlorine dosing related mechanical arrangements, interconnecting piping, specials, fittings and all other allied accessories complete in all respects including labour, material, carriage, testing, trial run and commissioning as per approved specifications and directions of the Engineer-in-Charge. |
| 2 | RAW WATER: Supplying, erection, testing and commissioning of Horizontal submersible pumping set for Clear water having head 45 m as per the indicated requirements of discharge in LPM and power capacity in 50 BHP as per IS Marked 3000 LPM x 45 m head complete in all respect. |
| 3 | Supplying, erection, testing and commissioning of horizontal motor pumping set for Raw water having head 30.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked.(3000 LPM x 35.00 BHP) |
| 4 | Less Credit of Old Bricks ( - ) |
| 5 | Credit of bricks bats 40 % |
| 6 | Less Credit of Old Bricks 1 |
| 7 | Operation and Maintenance of 1.00 MLD Water Treatment Plant, Based for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (Will be charged to the A/mtc estimate). Complete in all respects as per approved NIT.1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only) |
| 8 | (ii) Operation and Maintenance during 1st year after defect Liability period. |
| 9 | (iii)Operation and Maintenance During 2nd year. |
| 10 | (iv)Operation and Maintenance During 3rd year. |
| 11 | (v)Operation and Maintenance During 4th year. |
| 12 | (vi) Operation and Maintenance During 5th year. |
| 13 | HSR Itmes Please Enable Macros to View BoQ information |