|
| 1 | Designing |
| 2 | Outdoor Hoarding (10' X 20') |
| 3 | Banner |
| 4 | Standee 6ft (h) X 3Ft (w) |
| 5 | Certificate |
| 6 | Printing and Supply |
| 7 | Block Out Flex Outdoor Hoarding with frame, 190 GSM |
| 8 | Block Out Flex Outdoor Hoarding with frame, 320 GSM |
| 9 | Block Out Flex Standee (6X3 ft) with Iron Frame 320 GSM with pasting |
| 10 | Block Out Flex Roll Up Standee (6X3 ft) with Aluminum frame and heavy base with pasting 320 GSM |
| 11 | Block Out Flex theme based Standee (6X4 Ft) with wooden frame and background lighting 320 GSM with pasting and base |
| 12 | Arcylic Standee (6X3 Ft) 320 GSM |
| 13 | Block Out Flex Banner, 320 GSM |
| 14 | Block Out Flex Banner, 190 GSM |
| 15 | Block Out Flex theme based Backdrop Banner with 4 inch wide wooden/PVC frame, 320 GSM |
| 16 | Star Flex (3 Inch X 1.5 Inch) 280 GSM with wooden frame for promotional events |
| 17 | PVC Identity card including design (2.13 X 3.38 inches, 30 Mil Thickness) or other sizes as per requirement, 760 GSM |
| 18 | Sticker (3X3 Inches) |
| 19 | Sticker (4X4 Inches) |
| 20 | Sticker (6X6 Inches) |
| 21 | Poster (18 x 24 Inches) 170 GSM |
| 22 | 5 mm Sunboard with eco solvant laminated vinyl printing (different Sizes) |
| 23 | Eco solvant laminated vinyl prinitng only |
| 24 | Digital printed Retro Plates with ACP base and other allied items for support |
| 25 | Sail Flags/Curved Top with base plate and Pole 8' Height |
| 26 | Flutter Flag with base plate and Pole 8' Height |
| 27 | Sail Flags/Curved Top with base plate and Pole 12' Height |
| 28 | Transportation, Installation, Dismantling and Rent for Hoarding Space |
| 29 | Transportation, Installation & Dismantling of Hoarding within Srinagar City (10X20 Ft) |
| 30 | Transportation, Installation & Dismantling of Hoarding outside Srinagar City |
| 31 | Rent Charges for Hoarding Space in Srinagar City |
| 32 | Rent Charges for Hoarding Space outside Srinagar City |
| 33 | Pick Up Truck 4X4 for carriage (rate to be qouted per Km) |
| 34 | Tentative estimated cost is Rs. 16,914/-. The quantity given and estimated cost is tentative and can be increased or decreased as per the requirement of the Department. Please Enable Macros to View BoQ information |