|
| 1 | Cleaning jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1 m above ground level and removal of rubbish up to distance of 50m outside the periphery of the area cleared UPPWD/SOR/DAR-18/2.31 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 Sq.M on plan) including dressing of sides and ramming ob bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a load of 50m |
| 3 | Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work |
| 4 | Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc.for mass concrete. |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form for:Lintels, beams, plinth beams, girders, bressumer sand cantilevers. |
| 6 | Centring and shuttering including strutting, propping etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement: All work above plinth level upto floor V level |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete uoto plinth level. Thermo Mechanically Treated bars |
| 10 | M-150 brick work in 1:6 cement & fine sand 1.25F.M mortar in foundation and plinth including supply of all materials labour complection of the work but in 1:4 one ceement & four coarse sand of 2.20 F.M mortar UPPWD SOR 2020/305a UPPWD SOR 305a |
| 11 | M-150 brick work in 1:6 cement & fine sand 1.25F.M mortar above plinth including supply of all materials labour complection of the work but in 1:4 one ceement & four coarse sand of 2.20 F.M mortar UPPWD SOR 2020/305a UPPWD SOR 305a |
| 12 | 12mm cement plaster of mix1:6 (1 cement: 6 coarse sand) |
| 13 | 15mm cement plaster of mix1:6 (1 cement: 6 coarse sand) |
| 14 | Finishing wall with water proofing cement paint of required shade: New work (Two or more coats applied 3.84 kg/b sqm) Based on uppwd sor |
| 15 | Providing precast cement concrete jall 1:2:4 (1 cement : 2 Coarse sand : 4 Graded stone aggregate 6mm nominal size) reinforced with 1.6mm dia mild steel wire including centering and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement : 3 fine sand) etc complete excluding plastering of the jambs, sills and soffits 50 mm thick UPPWD SOR 2020 P27 |
| 16 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 17 | Painting with synthetic enemel paint of approved brand and manufacture to give even shade Two or more coat on New work UPPWD/SOR/2020/13.61.1/P-952 |
| 18 | Earth work in rough excavation, banking, earth in layers not exceeding 20cm in depth clods watering rolling each layers with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layers with power roller of minimum 8 tonnes and dr |
| 19 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Based on SOR UP PWD 2020) |
| 20 | Supply and fixing of Indiamark Handpump including making chabutara of dia 2mtr and 45mtr lowering (depth) and Pvc assembling, Blinding Pipe strainer and 63mm/110mm dia PVC Pipe etc. (Pressure 6.0kg/cmsqr) including all labour & material and T&P complete as required as per direction of engineer-in charge. |
| 21 | Dry brick on edge flooring in required pattern with bricks of class designation 75 on a bed of 12 mm mud mortar including filling joints with Jamuna sand (with F.P.S. 5 bricks) complete. |
| 22 | Providing and laying 60 mm thick factory made cement concrete interlocking paver block(ISI Marked) made by block making machine with strong vibratory compaction of approved size design, shape, laid in required color and pattern over and including average 50 mm thick compacted bed coarse sand and filling the joints with fine sand all complete as per direction of Engineer -in - charge with conforming (UP PWD SOR 2020) (New SOR Based DSR 16.68) |
| 23 | Providing, Fixing and commisoining of single phasesubmersible pump set in existing borewell Suitable for 45 LPM Discharge 25 mtr Head minimum Two Star rating of approved make PVC cable supportwise starter etc complete in all respect including cost of dismentaling of existing handpump achine complete Labour T and P etc from bore well approved quality as per direction of engg. in charge MR Please Enable Macros to View BoQ information |