| 1 | Safe carriage of following material from Store Centre to site/JE store with loading & unloading at both ends respectively distance with in 40 Kms. |
| 2 | 09/11/13 Mtr. Long ST Poles |
| 3 | 8.5/9 Mtr. PCC Pole |
| 4 | 11/13 Mtr. PCC Pole |
| 5 | XLPE cable of size 3x70 sq.mm./ 3x120 sq.mm./ 3x185 sq.mm./ 3x300 sq.mm. etc. |
| 6 | 11/0.4 10/16 KVA Transformers |
| 7 | 11/0.4 25 KVA Transformers |
| 8 | 11/0.4 63 KVA Transformers |
| 9 | 11/0.4 100 KVA Transformers |
| 10 | ACSR Weasel/Rabbit/Dog Conductor |
| 11 | 33KV/11 KV CT/PT unit with all its related accessories. |
| 12 | 33KV/11 KV Pilfer resistant metering Cubical. |
| 13 | L.T. ABC Cable off Different Sizes. |
| 14 | L.T. Alu. Cable Size 3.5x70mm. |
| 15 | TPMO, FUSE SET |
| 16 | Line material such as ms Channel, Ms angle Cross-Arms, Pin Insulators, Guarding Angles, Guarding Wire, Disc Insulators and Cable Jointing Kits etc. |
| 17 | Dismentalling of old Line/ Structure. |
| 18 | Removing of ACSR Weasel/Rabbit/Dog conductor from all phases on line, making bundle and stacking at a safe place. |
| 19 | Uprooting of 13 Mtr./11 Mtr./9 Mtr Long ST Poles. |
| 20 | 33 KV CT/PT |
| 21 | 11 KV CT/PT |
| 22 | Digging of pits, Erection of 13/11 Mtr. Long ST Pole including fixing of all required accessories by providing M.S. Clamps Nut & Bolts. |
| 23 | Digging of pits, Erection of 13/11 Mtr. Long PCC Pole including fixing of all required accessories by providing M.S. Clamps Nut & Bolts. |
| 24 | Digging of pits, Erection of 13/11 Mtr. Long ST Double poles including fixing of all required accessories by providing M.S. Clamps Nut & Bolts. |
| 25 | Digging of pits, Erection of 8.5/9 Mtr. Long PCC pole including fixing of all required accessories by providing M.S. Clamps Nut & Bolts. |
| 26 | Digging of pits, Erection of 8.5/9/11 Mtr. Long PCC Double poles including fixing of all required accessories by providing M.S. Clamps Nut & Bolts. |
| 27 | Digging of pits, Erection of 13/11 Mtr. Long ST/PCC Single Section Pole including fixing of all required accessories by providing M.S. Clamps Nut & Bolts. |
| 28 | Grouting of ST/PCC Poles Single/Double/Tri/four Pole/ line support :- Grouting of support in CC 1:4:6 (cement, sand and 40 mm. brick ballast) Grouting will be done in the block of size 45cm x 45cm x 1/6th of full length of the support upto ground level as per RESPO Norms. |
| 29 | Fabrication and fixing of T/F Angle seat on Double pole for Mounting and safe placement of T/F on Double pole by providing M.S. Clamps Nut & Bolts. |
| 30 | Grounding of earth rods for making earthing of poles and T/F by M.S clamps, nut and Bolts. |
| 31 | Grouting of Stay rods (20x1800mm.) including all works of excavation, cement concrete in size of (0.60x0.60x0.30) M in the atio of 1:4:6 (cement, sand and 40mm. brick ballast) including back filling of soil and proper ramming etc. |
| 32 | Fixing, tightening and nozelling of stay wire with stay rod and stay insulators, with pole of required tension by providing stay clamps, nuts, bolts etc. |
| 33 | Fabrication and fixing of guarding angles on poles by M.S clamps, nut & bolts, laying and sagging of G.I wire, Fixing and binding of cross lesses for making jaal under 11KV line. |
| 34 | Fabrication of M.S channel/Angle/33 KV/11 KV Cross Arm including its cutting, Drilling making holes etc. |
| 35 | Fabrication of M.S. Channel/angle and mounting of 33 KV/ 11 KV CT/PT unit on Double pole and fixing & fitting of all related accessories by providing m.S. clamps, Nuts & Bolts for Double metering. |
| 36 | Installation of 33 KV/11 KV pilfer resistant metering cubical in meter room Including fixing of cable Boxes and Making Connections Complete Work. |
| 37 | Filling and fixing of 33KV/11KV cable jointing kits after laying of XLPE cable. |
| 38 | Fixing of 11 KV 3Ph-4W TVM Meter at double pole including making proper connections. |
| 39 | Mounting and fixing of TPMO, Fuse set on pole/TF including making proper connections. |
| 40 | Laying and sagging of ACSR weasel/Rabbit/Dog conductor in 33KV/11KV line including its binding on Insulators ets complete work. |
| 41 | Laying, jointing & binding of 33 KV/ 11 KV XLPE cable on pole and other end in meter room. |
| 42 | Laying, lifting and sagging of ABC Cable on poles by fixing all type of clamps, its binding on shackle insulators etc. Complete work. |
| 43 | under grounding of 33/11 KV 3x70/120/185/300 sq.mm. cable. |
| 44 | Providing 150 mm. sand cushion beneath and 150 mm. above the cable. The cable shall be duly protected by 1st Class Bricks, two on either side and third on top of the cable, laid in the series one after the other. |
| 45 | Refilling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left in the loop shape at both ends, including providing of all required material and T&P. |
| 46 | Fabrication and fixing of T-off channels on poles by providing M.S clamps, Nut and Bolts. |
| 47 | Mounting and fixing of 10/16 KVA transformers on Single pole including making proper connections. |
| 48 | Mounting and fixing of 25 KVA transformers on double pole including making proper connections. |
| 49 | Mounting and fixing of 63 KVA transformers on double pole including making proper connections. |
| 50 | Mounting and fixing of 100 KVA transformers on double pole including making proper connections. |
| 51 | Providing G.I. Pipe 6” dia for inserting 33/11 KV XLPE cable for safety of cable on Single/Double Pole by providing and fixing of MS Clamp, Nuts and Bolts. |
| 52 | Providing & fixing of danger board at each location as per specification of the drawing. |
| 53 | Laying and mounting of LT PVC Cable 3.5x70mm2 on Poles . |
| 54 | Fixing of Distribution Boxes on ST Poles by providing MS Clamps including making connections of consumer’s cable connections by providing locks on Distribution Boxes. |
| 55 | Trimming of Tree branches crossing in the route of different spans of 33 KV/11KV/LT Lines. |
| 56 | Providing Wrapping of barbed wire on SP-55 Poles 1 Kg. per Pole. |
| 57 | Providing and fixing of Number Plate with clamp, nut and bolts. |
| 58 | Back Carriage of following from work site to Store Centre Bijnor including loading and unloading at both ends :- |
| 59 | 13 Mtr./11 Mtr./9 Mtr. Long ST/PCC Poles. |
| 60 | ACSR Weasel/Dog Conductor/M.S. Scrap. |
| 61 | CT/PT Unit. |
| 62 | 11 KV pilfer proof metering cubical/ Old and used Damaged TF 10,25,63,100 KVA Please Enable Macros to View BoQ information |