| 1 | Excavation in foundation in ordinary soil (loam clay or sand ) includig lift upto 1.50 metre and lead upto 30 metre . Including filling watering & ramming of excavated earth into the trenches of into the space between the building & the sides of foundation trenches or into the plinth & removal & disposal of surpluse earth as directed by the Engineer incharge upto a distance of 30 m from the foundation trenches. (Excluding Royality Rs. 30 ) As per S.I. No. 251 Excluding GST |
| 2 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Excluding GST. SI. No. 275 |
| 3 | M-150 Brick work in 1:4 cement & fine sand (1.25 F.M.) mortar morter in foundation and plinth including supply of all materials, labour & tools & plants etc. required for proper completion of the work. Excluding GST. SI No. 305 |
| 4 | Centering and shuttering including stutting, propping etc. and removal of form for Lentels, beams, plinth beams, girders, bressumers and cantilevers, As per DSR Code No- 5.9.5 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of |
| 6 | Provoiding concrete for plain/reienforced concrete in open foundations as per drawing and technocal specifications clauses 802,803,1202,1203 (11.4(iii) 800 and1200) |
| 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired |
| 8 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and cam |
| 9 | Provoiding and laying of Rubber Moulded Reflective Zig-Zag 80mm thick tiles of precost compressed C.C. Passing miniumum 30mpa compressive strength-ISI Marked concrete block pavements having thickness 80 mm as per technical specification clause 1504 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform.As per DSR Code No. 5.9.3 |
| 11 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the |
| 12 | Steel reinforcement for R.C.C. work ready to use \\"cut and bend\\" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete upto plinth level. 5.22B.1 Thermo-Mechanically Treated bars of grade |
| 13 | Construction of subgrade with material obtained from borrow pits for local earth construction of embankment with approved material obtained from available land and permitted and approved by Engineer in charge and as per technical specification clause 301. |
| 14 | Suppply and fixing of sign board I/C all. |
| 15 | As per Order of Joint Secretary G.O. No. G-1877 Dated 21-02-2025 and Director cum-chief Engineer U.P. RED, Lucknow Latter No 801 Dated 03-03-2025 Deduction 5% for Comptetive Price Effciency Please Enable Macros to View BoQ information |