|
| 1 | Erection of Material |
| 2 | Loading, Carriage and unloading of poles from store to work site or vice versa or from one site to another |
| 3 | Erection of Four pole structure by digging of pit by hydra |
| 4 | Erection of Double pole structure by digging of pit by hydra |
| 5 | Erection of Single/Stud pole by digging of pit by hydra |
| 6 | Grouting of pole with cement brick ballast and coarse sand as per standard specification. |
| 7 | Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. |
| 8 | Painting of S.T. pole with one coat of red oxide and two coats of Aluminium Paint including cost of Ist Class enamel paint. |
| 9 | Earthing of supports by sagging of M.S. earthing rod 20mm and connecting with earth wire and related works as per standard specifications. |
| 10 | Loading,Carriage and unloading of ACSR Dog/WEASEL Conductor from Store to Work Site or Vice-Versa. |
| 11 | Laying, stringing, tensioning & final sagging of G.I. wire including of cross lacing. |
| 12 | Laying, Strining & Tensioning of ACSR Dog Conductor for making jumpers on riser. |
| 13 | Taking out of 33/11 kV XLPE 3x300 /3x185/3x70Sq.mm cable from drum/complete drum of cable at site of work or store using JCB including carriage |
| 14 | Digging of pit 2x2x1mtr. deep for laying of cable through HDD Method. |
| 15 | Laying of Cable by HDD method as per site requirment. |
| 16 | Mounting of cable box on double pole With Pipe |
| 17 | Digging of Trench for laying of cable in different situations in size of 30 cm. wide and 1 to 1.5 meter deep. |
| 18 | In Normal soil |
| 19 | In Kharanja Soil |
| 20 | In Metallic Road |
| 21 | Laying of 33 KV XLPE cable in above digged trenchcovering with bricks and back filling and proper ramming upto poles |
| 22 | Laying of MS pipe/GI Pipe\HDPE in above digged trench |
| 23 | Mounting of 33 kV Pin Insulator |
| 24 | Mounting of 11 kV Pin Insulator |
| 25 | Mounting of Disc Insulator |
| 26 | Erection of Disc Fitting with disc string |
| 27 | Fixing of V-Type cross arm on erected/existing double/try/four pole. |
| 28 | Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc. |
| 29 | Fabrication/modification of MS Item as per requirement of site |
| 30 | Fixing of MS Channel (100x50x6 )mm 2.4 / 2.8 mtr. Long/M.S. Angle and as per Required size |
| 31 | Fixing of guarding angle/guarding channel for laying of guarding |
| 32 | Fitting of Cross bracing on double pole structure and related work. |
| 33 | Fixing of danger board on erected poles |
| 34 | Making 33 Kv/11 kv straight through joint including digging of pit upto 1.1 metre depth |
| 35 | Chopping of tree branches by hydra with Machine for lying in the route of existing line touching the tree branches to the phase line conductor making fault to the feeder, for 3” to 18” dia or as per requirement of site |
| 36 | Dismentalling of jumpering from cable box to line, cable support switchgear panels. |
| 37 | Making jumpers from cable box to line, cable support switchgear panels, section poles of each phase. |
| 38 | Connecting of newly erected network with KESCo mains including testing, commissioning and energization of the same completely. |
| 39 | Loading, carriage and unloading of Aearial Bunched Cable from store to work site or vice-versa. |
| 40 | Laying of LT Aerial Bunched Cable including fixing suspension clamp with eye hook , Dead end clamp with Eye hook on erected Steel Tubular Pole etc. |
| 41 | Dismantling of L.T./H.T. A.B. Cable and rolling into bundles |
| 42 | Opening of L.T. Jumpers from the existing 3 Phase 4 Wire L.T. O.H. line for erection work. |
| 43 | Making of L.T. Jumpers from 3 Phase 4 Wire L.T. O.H. line for erection work. |
| 44 | Opening of H.T. Jumpers from the existing 3 Phase 4 Wire L.T. O.H. line for erection work. |
| 45 | Making of H.T. Jumpers from the existing 3 Phase 4 Wire L.T. O.H. line for erection work. |
| 46 | Making H.T.Section points by brackets, clamps & insulator, Tightening of Line, binding of conductor & proper connection. |
| 47 | Mounting & Erection of single phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc. |
| 48 | Mounting & Erection of three phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc. |
| 49 | Opening and reconnection of consumer service connections after replacement of line/ poles etc. |
| 50 | Supply and Fixing concrete Stone Route marker of 300 mm width x 150 mm thick x 650 mm height embedded in earth at least 300 mm below and 350 mm above ground level at every 100 m along the length of the cable with RCC concreting as per standard specification. |
| 51 | Re-arrangement of 33 KV/11KV existing line / Cables |
| 52 | Re-sagging of conductor, on old line after erection of pole, binding of conductor etc. |
| 53 | Erection of Drop out fuse set on Double Pole structure |
| 54 | Energizing and shifting of load on transformer from near over loaded transformer after construction of necessary LT OH Line. (If required) |
| 55 | Construction of T/F plinth, suitable for mounting of distribution transformer size of the plinth will be 1.2x1.2x1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth. |
| 56 | Fabrication, erection & grouting of T/F fencing of frame size 3x2.4 mtr. including cost of M.S. Angle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting fo two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil and dust. |
| 57 | Supply of 40 mm dia class 'B' G.I. Pipe 80'' long including M.S. flat 50x6 mm/ 1x95 sq. mm XLPE cable along with all related materials & Boring 80'' deep and connection of neutral bushing with G.I. Pipe through M.S. flat/ earth wirerequired for distribution T/F earthing work. |
| 58 | Dismantling work |
| 59 | L/c for Dismentalling of Damaged S.T. Pole with the help of crane after remaving all the accessories from damged pole and its all related wotk including digging of pit or by cutting with gas cutter. |
| 60 | L/c for Dismentalling of binding wire from insulators and loosening of the ACSR mixed conductor on each pole then lowering down the ACSR mixed conductor & rolling into bundles. |
| 61 | L/c for Dismantling of M.S. Channel/X-arm/Guarding angle |
| 62 | Carriage of all concerning stock material from KESCo Store to site or vice-versa & supply and Erection of Decentralized Item |
| 63 | MS Clamp 4½ (50x6 mm) |
| 64 | M.S. Clamp 5½\\" (50x6) mm |
| 65 | MS Clamp 6½ (50x6 mm) |
| 66 | MS Clamp 7½ (50x6 mm) |
| 67 | MS Clamp 8½ (50x6 mm) |
| 68 | Stay Clamp 6½ (50x6 mm) |
| 69 | Bracing clamp 6½ |
| 70 | Bracing clamp 7½ |
| 71 | Bracing clamp 8½ |
| 72 | MS Clamp 5½ (50x6 mm) |
| 73 | Dead End clamps with Eye-Hook (Insulated) |
| 74 | Suspension clamps with Eye-Hook (Insulated) |
| 75 | Holding Clamp for round pole 4½\\" (50X6) |
| 76 | Holding Clamp for round pole 5½\\" (50X6) |
| 77 | Stay Clamp 4½\\" |
| 78 | ACD CLAMP |
| 79 | Stay Clamp 5½\\" Please Enable Macros to View BoQ information |