| 1 | Site Clearence |
| 2 | Excavation in foundation in ordinary soil(loomclay or sand) including lift upto 1.50meter andllead upto 30 meter and including filling,watering and ramming of excavated earth intothe trenches or into the space between thebuilding and sides of foundation trenches orinto the plinth and removal and disposal of|surface earth as directed by the E/l upto adistance of 30meter from the foundation |
| 3 | |Plain cement concrete l:4:8 nominal mix in|foundation with crushed brick ballast|aggregate 40 mm nominal size mechanicallymixed, placed in foundation and compacted byvibration including |
| 4 | Class 150 sub class-A brick work in 1:4Cement and fine sand of 1.25 F.M, Mortar insuper strucure as per analysis SI No.305 +SINo.309 for proper completion of work. Total Wall Length Bottom DED FOR DOOR AND WindowsDED FOR DOOR AND WindowsDED FOR WallDed Total column |
| 5 | Laying R.C.C. work with 1:1.5:3 with coresand & 20mm stone gritt &alletc. SI NO 284APlinth BeamPlinth,Lintel Beam|Plinth,Lintel BeamPlinth,Lintel BeamCCCCAwning |
| 6 | Mild steel or Iron work in R.C.C. includingcutting at 1.5% of R.C.C. QTY SI NO 504 |
| 7 | 12 mm thick plaster l:3 cement mortar &alletc. complete in walls SI NO 582 Ded Door & Windosws, ventilator |
| 8 | Providing and applying white cement basedIputty of average thickness 1 mm, of approvedbrand and manufacturer, over the plasteredwall surface to prepare the surfacc even andsmooth complete.\\" as per DSR 13.8 |
| 9 | Providing & Applying white cement and twocoat oil paint of average thickness I mm & alllcomolte etc. Si No 23 NBO 18:57+18.57 (24) |
| 10 | Earth work filling for plimth area cartage eathwith 5km SI NO 253 |
| 11 | Supply & fixing of W.C 450x600 mm toilet|seat as pre market rates |
| 12 | |Supply & fixing of boring and handpump aspre market rates |
| 13 | S/F of Iron Door , gate & windows with allnecessary item. |
| 14 | |Providing and fixing stainless steel (Grade|304) railing made of Hollow tubes, channels,plates etc., including cutting, bending,welding, spiralling, drilling, punching,grinding, polishing and finishing with fuelconsumption, grinding, polishing tools & |
| 15 | S/F of Wash Basin With all item. |
| 16 | Flooring cement concrrete flooring in l:2:4||laid in one layer finished with a floating cout|neat cement over 0.80 mm thickness baseconcrete SI No 601a |
| 17 | S&F 8mm thick wall tile and floor tile with|base of cement marbale 1:4 let over joint withgray cement slurry mixed pigment to match thel|sed of slab including rubbing and polishing. |
| 18 | Cement concrete with 2.0cm gaugelapproved stone ballast approved coarsesand and cement in the proportion of 4;2;1including ramming dressing & cutting ofslope required for proper complection tothe work .As per S.I No.279(a) |
| 19 | Supply &Laying of 80mm thick interlockingcost of all labours matarial ctc./sqm Cost |
| 20 | |Supply &Laying ofLocal sand |
| 21 | As in item 360 above but 2.5cm thick dampproof coures of cement concrete consinsting of1:1.5:3 one part cement 1.5 parts approved|13mm graded stone grit and including water|proofing materials as ordered by the E/I ...- SIno- 361 |
| 22 | Add water supply sanitary contibgency misgexpress instalation including cost of|construction of sewage of estimeted cost. |
| 23 | SF sing Board |
| 24 | |Add for Electrification including fans &alletc. comlette 5% at estimated cost |
| 25 | Supply & fixing DCR Soler panel light |
| 26 | Add for G.S.T. @ 18 % Please Enable Macros to View BoQ information |