|
| 1 | Supply Item |
| 2 | Holding Clamp for SP-33 without N/B(As per Specification of RESPO & UPCL) |
| 3 | Holding Clamp for SP-55 with N/B(As per Specification of RESPO & UPCL) |
| 4 | Nut & Bolts |
| 5 | LT BARE N.CONN. PG CLAMP FOR DB95-95mm²(As per Specification of RESPO & UPCL) |
| 6 | Dead End Clamp with I Hook(As per Specification of RESPO & UPCL) |
| 7 | STAY INSULATOR(As per Specification of RESPO & UPCL) |
| 8 | LT BARE N. CONNECTOR PG CLAMP95-25mm²(As per Specification of RESPO & UPCL) |
| 9 | MS Clamp with N&B for Suspension Clamp(As per Specification of RESPO & UPCL) |
| 10 | MS Clamp withN&B for PCC DeadEndClamp(As per Specification of RESPO & UPCL) |
| 11 | LT DB Holding Clamp With N&B(As per Specification of RESPO & UPCL) |
| 12 | Stay Clamp With N&B(As per Specification of RESPO & UPCL) |
| 13 | Suspension Clamp With Eye Hook(As per Specification of RESPO & UPCL) |
| 14 | LT DISTRUBITON BOX 3 PHASE(As per Specification of RESPO & UPCL) |
| 15 | Wire Mesh Fencing |
| 16 | LT ACB Panel 800A with Metering CT &Box(As per Specification of RESPO & UPCL) |
| 17 | AL. CRIMPING TYPE LUGS 120 SQ.mm(As per Specification of RESPO & UPCL) |
| 18 | AL. CRIMPING TYPE LUGS 70 SQ.mm(As per Specification of RESPO & UPCL) |
| 19 | Al. Lug Long Barrel 240 sq. mm.(As per Specification of RESPO & UPCL) |
| 20 | MS Flat 40X6 MM(As per Specification of RESPO & UPCL) |
| 21 | Line Work |
| 22 | CEMENT PLASTER WORK |
| 23 | CHEMICAL EARTHING |
| 24 | ERECTION OF EARTHING ROD |
| 25 | FABRICATION OF STEEL |
| 26 | EXCAVATION OF PIT FOR STAY SET |
| 27 | ERECTION OF 11 KV STAY SET |
| 28 | GROUTING OF STAY SET |
| 29 | EXCAVATION OF PIT FOR POLE |
| 30 | ERECTION OF SINGLE SP-33 POLE |
| 31 | ERECTION OF PCC DOUBLE POLE |
| 32 | ERECTION OF SP-33 DOUBLE POLE |
| 33 | ERECTION OF SP-55 DOUBLE POLE |
| 34 | GROUTING OF POLE |
| 35 | MUFFING OF POLE |
| 36 | DISMANTLING OF 100 KVA DTR |
| 37 | EXCAVATION OF EARTH FOR DTRPLINTH |
| 38 | CEMENT CONCRETING WORK DTRPLINTH |
| 39 | BRICK WORK IN 1:4 RATIO DTR PLINTH |
| 40 | RR MASSONARY WORK FOR DTRPLINTH |
| 41 | RCC WORK OF DTR PLINTH |
| 42 | INST. OF 100 KVA DTR ON POLESTRUCTURE |
| 43 | INST. OF 63 KVA DTR ON POLESTRUCTURE |
| 44 | INST. OF 25 KVA DTR ON POLESTRUCTURE |
| 45 | INST. OF 250 KVA DTR ON PLINTH |
| 46 | FIXING OF TPMO |
| 47 | FIXING OF LIGHTNING ARRESTOR |
| 48 | LAYING OF WEASEL CONDUCTOR INHT LINE |
| 49 | CARTAGE PCC POLE, 0-20 KM |
| 50 | CARTAGE SP-33 POLE, 0-20 KM |
| 51 | CARTAGE SP-55 POLE, 0-20 KM |
| 52 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 53 | CARTAGE OF 63 KVA DTR, 0-20 KM |
| 54 | CARTAGE OF 100 KVA DTR, 0-20 KM |
| 55 | CARTAGE OF 250 KVA DTR, 0-20 KM |
| 56 | HEADLOAD CARTAGE PCC POLE(0-1KM) |
| 57 | HEADLOAD CARTAGE SP-33 POLE(0-1KM) |
| 58 | HEADLOAD CARTAGE SP-55 POLE(0-1KM) |
| 59 | HEADLOAD CARTAGE OFMATERIAL(0-1 KM) |
| 60 | HEADLOAD CARTAGE OF 25 KVADTR(0-1 KM) |
| 61 | HEADLOAD CARTAGE OF 63 KVADTR(0-1 KM) |
| 62 | HEADLOAD CARTAGE OF 100 KVADTR(0-1 KM) |
| 63 | HEADLOAD CARTAGE OF 250 KVADTR(0-1 KM) |
| 64 | ERECTION OF LT ACB 800 A CT WITHPANEL |
| 65 | LAYING OF LT XLPE ABC 3X95+1X70SQ.MM |
| 66 | ERECTION OF SINGLE PCC POLE |
| 67 | FENCING OF DTR |
| 68 | INST. OF DANGER BOARD/NUMBERPLATE |
| 69 | CARTAGE OF 25 KVA DTR, 0-20 KM |
| 70 | LAYING OF LT ABC 3X120+1X70+1X16SQMM |
| 71 | FIXING OF 11 KV FUSE SET |
| 72 | BACK CAR OF DTR (16 -160) DIS 01 -20KM Please Enable Macros to View BoQ information |