Name of Work:- RECOUPING OF VRB AT KM 18.050 OF SARYU LINK CHANNEL (Lot No. 5)
Sl. No.
Item Description
1
Centering and shuttering for R.C.C. work.Including cost of all material, labour and T&p etc. but excluding GST
2
Steel Required for the RCC work including wearing coat rings cost of cutting, Bending, binding, Placing and all material Labour and T&P etc. but excluding GST
3
R.C.C. 1:1.5:3 with 4.75 to 20 mm. size Kabrai stone grit and coarse sand FM not less than 2 including cost of all material, labour and T&P etc. but excluding GST
4
Brick work in 1:4 c.m. with cement ,coarse sand and first class brick including cost of all material;labour and t&p etc. Per M³ but excluding GST
5
Deep Struck cement pointing in 1:2 c.m. with cement and coarse sand including cost of all material labour and t&p etc. but excluding GST
6
12 mm. thick cement plaster on brick masonary in 1:4 C.M. including cost of all materials, labours, Taxes, T&P etc. but excluding GST. but excluding GST
7
Distempering two coats of oil bound distemper with superior quality over one priming coat on surface after thoroughly burshing the surface Including cost of all material, labour and T & P etc but excluding GST
8
Painting two coat of synthetic enamel paint on new surface with superior quality approved make. Including cost of all material labour and t&p etc. Required for proper completion of work. but excluding GST
9
Writing letter above 80 mm. size including cost of all material, labour and T&P etc. complete. but excluding GST Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.