| 1 | E/W in embankment for making the road Diversion of Gorkha Dy. including all leads & lifts with proper dressing & manual compaction for proper compleation of work but excluding G.S.T |
| 2 | Dismantling brick work or stone work in lime or cement mortar including stacking of material as directed by Engineer-in-charge within a distance of 60 M But excluding GST |
| 3 | Dismantling Reinforcement cement concrete including stacking of dismantled material as directed by Engineer-in-charge within a distance of 60 M.but excluding GST |
| 4 | Ist class brick work in 1:4 C.M. with coarse sand of F.M. not less than 2.0 including cost of all material, labour and T&P. required for proper completion of work but excluding GST |
| 5 | S/F 20 mm thickness joint filler board in expansion joint including cost of all material labour and T&P etc required for proper compaction of work but excluding GST. |
| 6 | Two coat of bitumen painting with 2 layers of Tarfelt again followed by 2 coat of bitumen painting before laying R.C.C. slab including cost of all material, labour and T&P etc. required for proper completion of work but excluding GST |
| 7 | Centering & Shuttering for R.C.C. work including cost of all material , Labour and T & P etc.required for compleation of work but excluding G.S.T |
| 8 | Cutting, bending, binding & placing of Steel reinforcement in proper position including cost of steel, binding wire, all material labour and T&P. etc.required for proper completion of work but excluding GST |
| 9 | Laying R.C.C. 1:1½ :3 using 4.75 mm to 20 mm size crushed stone grit with coarse sand having F.M not less than 2.0 including cost of all material, labour and T&P.,except steel, required for proper completion of work but excluding GST |
| 10 | Deep struck Cement Pointing in 1:2 CM with fine coarse sand including cost of all material, labour & T&P. required for proper completion of work but excluding GST |
| 11 | Painting two coat of oil bound distemper over one priming coat of cement primer on new surface.but Excluding GST |
| 12 | E/W in digging foundation in all type of soil including all lead , lift and back filling and disposal of surplus earth for proper completion of work but excluding G.S.T |
| 13 | Laying plain cement concrete in 1 : 3 : 6 Linnig in foundation with 20 to 40 mm size stone grit & coarse sand having F.M. not less than 2.0 including all material Labour & T & P required for proper compleation of work but excluding G.S.T |
| 14 | First class Brick work in 1: 3 C.M. with coarse sand of F.M. not less than 2.00 including cost all material , Labour & T & P required for proper completion of work but excluding G.S.T. |
| 15 | Making Sub Grade in Linning work including watering , compaction & preparation of surface but excluding GST |
| 16 | Supplying & Laying of Local sand for sub Base including cost of all material , Labour and T & P etc.required for compleation of work but excluding G.S.T |
| 17 | Centering & Shuttering for C.C.Lining work including cost of all material , Labour and T & P etc.required for compleation of work but excluding G.S.T |
| 18 | Laying 200 micron LDPE film on sub grade before construction of Brick Linning including cost of all material labour & T & P required for proper compleation of work but excluding G.S.T |
| 19 | Providing & Laying cement conc.C.C.Linnig M15 (1:2:4) with 4.75 to 20 mm size graded hard stone grit and coarse sand including cost of all material , Labour and T & P required for proper compleation of work but excluding G.S.T |
| 20 | Making 12 mm wide & 60 mm deep construction jojint on every X- sleeper in linning. Providing and filling i!!n position bitumen mix filler in proportion 80 Kg hot bitumen , 01 Kg cement and 0.25 cubic meter coarse sand in construction joint including cost of all material labour & T & P required for proper compleation of work but excluding G.S.T Please Enable Macros to View BoQ information |