| 1 | Supply of Machinery Spares |
| 2 | C.S. trash plate machined confirming to IS-1030 Grade 23/45. Free from blow holes .as per Drg. |
| 3 | Grooving as per drg.-1020-MH-0402-01-171(Rate should be quoted lum sum)( Mill No. 1 ) |
| 4 | Drilling as per drg. ----------do---------(Rate should be quoted lum sum)( Mill No. 1 ) |
| 5 | Grooving as per drg. BCSM/MH/113 (Mill No. 2 )(Rate should be quoted lum sum) |
| 6 | Drilling as per drg. ----------do--------- (Mill No. 2 )(Rate should be quoted lum sum) |
| 7 | Grooving as per drg. BCSM/MH/112 (Mill No. 3)(Rate should be quoted lum sum) |
| 8 | Drilling as per drg. ----------do--------- (Mill No. 3)(Rate should be quoted lum sum) |
| 9 | Grooving as per drg. BCSM/MH/112(Mill No. 4)(Rate should be quoted lum sum) |
| 10 | Drilling as per drg. ----------do---------(Mill No. 4)(Rate should be quoted lum sum) |
| 11 | Mill no.1C.S. Scraper with machining as per drawing 1020-MH-0402-01-255 & 256 |
| 12 | Grooving of top scraper as per drg.1020-MH-0402-01-256(Rate should be quoted lum sum) |
| 13 | Grooving of discharge scraper as per drg.1020-MH-0402-01-255(Rate should be quoted lum sum) |
| 14 | Drilling as per drg. ----------do---------(Rate should be quoted lum sum) |
| 15 | Mill no.2M.S. Scraper with machining as per drawingMH-TS-02-R1 |
| 16 | Grooving of top scraper as per drg. ----------do------(Rate should be quoted lum sum) |
| 17 | Drilling as per drg. ----------do---------(Rate should be quoted lum sum) |
| 18 | M.S. Scraper with machining as per drawing MH-DS-02-R1 |
| 19 | Grooving of discharge scraper as per drg. ----------do---------(Rate should be quoted lum sum) |
| 20 | Drilling as per drg. ----------do---------(Rate should be quoted lum sum) |
| 21 | Mill no.3&4M.S. Scraper with machining as per drawing MH-TS-03-R1 |
| 22 | Drilling as per drg.- ------do--------(Rate should be quoted lum sum) |
| 23 | Grooving of top scraper as per drg.- ------do--------(Rate should be quoted lum sum) |
| 24 | M.S. Scraper with machining as per drawing MH-DS-03-R1 |
| 25 | Grooving of discharge scraper as per drg.- .------do--------(Rate should be quoted lum sum) |
| 26 | Drilling as per drg. ----------do---------(Rate should be quoted lum sum) |
| 27 | Mill no.2,3 , pitch – 50mmM.S. Scraperwith machining as per drawing(GRPF pressure shoot) |
| 28 | Grooving of top scraper as per drg. BCSM /MH/015 (Rate should be quoted lum sum) |
| 29 | Grooving of bottom scraper as per drg. BCSM /MH/016 (Rate should be quoted lum sum) |
| 30 | Drilling as per drg.(Rate should be quoted lum sum) |
| 31 | Mill no. 4, pitch – 40mmM.S. Scraperwith machining as per drawing(GRPF pressure shoot) |
| 32 | Grooving of top scraper as per drg. BCSM /MH/017 (Rate should be quoted lum sum) |
| 33 | Grooving of bottom scraper as per drg. BCSM /MH/018 (Rate should be quoted lum sum) |
| 34 | Drilling as per drg. (Rate should be quoted lum sum) |
| 35 | C.S trash beam/Coupling/Crown Pinion |
| 36 | C.S trash beam as per drg.BCSM/MH/0164 |
| 37 | C.S Mill coupling As per drg. BCSM-MH-001A |
| 38 | C.S Crown Pinion As per drg. BCSM-MH-001020 |
| 39 | Static Collar |
| 40 | Static collar for 36’’x72’’ mill as per drg.Thickness of MS plate – 32 mmThickness of SS-304 plate 8mm |
| 41 | Static collar for 33’’x66’’ mill as per drg.Thickness of MS plate – 32 mmThickness of SS-304 plate 8mm Please Enable Macros to View BoQ information |