| 1 | Drilling 150mm dia vertical Borewells in Hard rock areas to anywhere in tamilnadu Including transportation to the work site as diricted by the depetmental officers…Etc.. FRom 211m to 240m |
| 2 | From 241m to 270m |
| 3 | Supply and fixing of 150mm PVC casing pipe as per IS 12818/2010 etc, complete as per standard specification(Casing shallow depth up to 80 mtr) |
| 4 | Labour charges for inserting of 150mm Dia PVC casing pipes assembly( with slot or without slot) in the drilled hole including Jointing pipes with pvc couplers with cement paste Etc.. Complete,supply and packing the annular Space with pebbles of sixze and quality as approved by the Excutive Engineers of TWAD Board. |
| 5 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe 90mm HDPE Pipe |
| 6 | Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification. |
| 7 | Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm |
| 8 | Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification |
| 9 | Testing of pipes for water supply with hudralic testing equipments by filling with water including cost of water @ 60/KL and testing to recommended Pressure in convenient stretches and attending the brusts if any occurred during the test excluding the cost of pipes but including other incidential and operational charges ETC... complete for the following diameteres of pipes HDPE Pipe 90mm |
| 10 | Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete. |
| 11 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend |
| 12 | 90 mm HDPE Elbow |
| 13 | 90 mm HDPE Flange set |
| 14 | 90 mm PVC Ball Valve |
| 15 | 90 mm HDPE Tee |
| 16 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means |
| 17 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means Please Enable Macros to View BoQ information |