Tender For annual rate contract For Laying Of 3Lpe Coated Carbon 4 Steel Pipeline In Gas Under Bihar & Other Associated Work Including Installation Of Sv Stations & Supply Of Materials Mentioned As Per Sor, For Connectivity Steel Lines For Drs/Mrs/Cn

Issued by Boards / Undertakings / PSU · Patna, Bihar
Tender Value
Ref. Documents
Estimated cost
Bid Submission
13 Jul 2026
4 days left
EMD
1.74 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Patna → Bihar
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for annual rate contract For Laying Of 3Lpe Coated Carbon 4 Steel Pipeline In Gas Under Bihar & Other Associated Work Including Installation Of Sv Stations & Supply Of Materials Mentioned As Per Sor, For Connectivity Steel Lines For Drs/Mrs/Cng Stations.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 29-Jun-2026 Extension of Bid Submission End Date Date 06-Jul-2026
2 07-Jul-2026 Extension of Bid Submission End Date II Date 13-Jul-2026

BOQ

Name of Work:- ARC for Laying of 3LPE coated carbon 4 steel pipeline in GAs under Bihar & other associated work including installation of SV stations & supply of materials mentioned as per SOR, for connectivity steel lines for DRS/MRS/CNG Stations.
Sl. No. Item Description
1Steel pipeline laying in Saran GA
2INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL)
3Specified NB (inch) x Wall thickness (mm) - Material of Construction
44\\" x 6.4 mm - API 5L X 52 ( HFW / SMLS )
5\\"PIPELINE LAYING LIAISONING AND GETTING PERMISSIONS FROM THE STATUTORY AUTHORITIES
6\\"SUPPLY & INSTALLATION OF CASING PIPE ALONG WITH MAIN CARRIER PIPELINE
710\\" NB Carbon steel casing pipe (Augur boring & Jacking Method / Moling/HDD) - For 4\\" Mainline Carrier Pipe
8\\"INSTALLATION OF CARRIER PIPE (CARBON STEEL) BY TRENCHLESS METHOD WITHOUT CASING.\\"
9Any other activities not mentioned/ covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works
10Installation of 4\\" NB PE 4 inch CS conduit as required by HDD
11Installation of 4\\" NB PE Coated Steel pipe alongwith 4 inch CS conduit as required by HDD in HARD ROCK USING DIAMOND CUTTER
12Installation of 4\\" NB PE Coated Steel pipe without any casing by Moiling
13\\"INSTALLATION OF CARRIER PIPE BY HDD METHOD (SHALLOW HDD OR HDD ALONG THE ROAD WITHOUT CROSSING) 'Execution of road/other crossing by Shallow Horizontal Directional Drilling (HDD) technique OR laying by HDD method along the road without any crossing at a required depth as per site condition including mobilization & de-mobilization at site(s), supply of all ma terials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as p er all provisions of the contract document complete in all respect as per the instructions of the Engineer – in – charge /Site engin eer. 'Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspect ion of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage ar ea required thereof till the pipes are installed in permanent position. 'Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangemen t for pipeline stringing, launching etc. 'Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating includ ing defects/ damages occurring during transportation and handling. 'String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radi ography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiogra phs, repair of defects in the welds and re-testing etc. 'Carrying out pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of d efects and retesting etc. 'Coating of the field joints of the pipe string to be installed by shallow HDD method with DIRAX heat shrink sleeves of approved mak e used for HDD crossings. 'Repair of all coating damages in the pipe section to be laid by shallow HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of approved make. \\"
14\\"Supply & fixing of easy to install heat shrinkable duct end caps for HDPE duct for OFC (wherever OFC has to be laid along with the carrier pipeline). 'Installation of the pipeline and OFC conduit as a bundle crossing below the Road/ other utility horizontally by shallow HDD operati on to the correct profile as per the approved drawings in a pre-reamed hole of appropriate size. 'Carrying out post-installation coating survey as per approved procedure. 'Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. 'All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note: 1. Payment shall be based on the actual length (Length between tie-in joints) of pipeline laid by Shallow HDD. Exact location of ti e-in shall be approved by Owner/ Owner's Representative. 3. The length of Shallow HDD mentioned is tentative and may vary to the considerable extent, depending upon requirements as per site conditions and shall be decided by Engineer-in-Charge. 4. Payment for the length of final tie-in carrier pipeline string with mainline laid by Shallow HDD are inclusive in this above item rate. No separate payment shall be made under other clauses mentioned elsewhere. 4. The supply and laying of HDPE duct is included in this SOR item and will not be paid separatly. 6. This item shall be executed as per specific instruction of Engineer-In-Charge.\\"
15Installation of 4\\" NB PE Coated Steel pipe along with 2 Nos HDPE Duct as required by Shallow HDD method
16\\"INSTALLATION OF SV STATIONS All works for installation of all underground & above ground piping at all elevations and below ground at all depth for Sectionalizi ng Valve Station with / without future tap-off in the same valve chamber as per P & ID & GAD in all type of terrains and soils incl uding \\"\\"Receiving and taking over\\"\\" as defined in the specifications, handling, loading, transportation and unloading of all Owner s upplied materials i.e. extended stem, butt welded, sectionalizing ball valve, other types of valves, line pipes for mainline from Ow ner's designated place(s) of issue to work site, Supply of pipes, fittings & valves for piping of size below 4\\"\\" dia, supply of all consumables, materials, manpower and carrying out all mechanical works of underground and above ground piping including fabrica tion, welding, non-destructive testing of welds by radiography or Utrasoninc Testing in case radiography is not possible, weld repa irs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testing, pneumatic seat & seal te st as per API 6D, cutting of mainline and beveling (if required), tie-in of valve assembly, including radiography of tie-in joints a nd Ultrasoninc testing of Golden joints, corrosion, coating and external painting as required. Installation of instruments like pressure/ temperature instruments/ gauges, provision for tubing to the actuator in future, obtainin g all statutory clearances, approvals and permissions for the works (wherever required). Excavation in all types of soil including soft / hard / rocky surfaces, providing 200 mm thk PCC for valve base support, backfilling and compaction with approved soil for installation of pipes and fittings, etc including sand padding all around the valves in SV st ation, pipe supports and fencing would be paid against separate SOR s ), painting, finishing, clean-up and restoration of site; prep aration of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisio ns of Contract document and instructions of Engineer-in- charge. Note: 1. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor with in the rate quoted. 2. This work is exclusive of all works associated with main pipeline covered under SOR item specified as INSTALLATION OF CARRIER PIP E BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. All civil / structural works including area fencing and gate, pipe supports, valve chamber shall be paid separately as per unit r ate provided elsewhere in the SOR. 4. 4\\"\\" and above (fittings & flanges etc. ), material supply is also in the contractor scope. It shall be be paid separately under Supply item provided elsewhere in the SOR.\\"
17SV STATION WITH VENT WITHOUT BY-PASS LINE AND WITH / WITHOUT FUTURE TAP-OFF
184\\" NB SV STATION WITH VENT
19SV STATION WITH VENT WITH BY-PASS LINE AND WITH / WITHOUT FUTURE TAP-OFF
204\\" NB SV STATION WITH VENT WITH BY-PASS LINE
21\\"COMPLETE WORKS FOR TAP-OFF POINTS (NOT PART OF SV STATION COMMON VALVE CHABMBER)\\"
22\\"Works at Future Connections: Complete
23\\"Works at Future Connections: Complete works of design, engineering, installation of all piping, valves, fittings at all depths inside the pit in all types of te rrains and soils including transportation, handling of Owner supplied material from Owner's designated issue point(s) to work site, supply of Contractor's supplied materials to work site(s), all mechanical works including fabrication, welding, non destructive tes ting of welds, weld repairs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testin g, cutting of mainline and beveling (if required), tie-in of valve assembly, including radiography of tie-in joints, corrosion, coating and external painting as required. All civil works including excavation of pit, piping supports including all PCC and RCC works for pedestals with insert plates as re quired, construction of valve chamber including with supply of all material and finishing, clean up and restoration of site , filling and grading of area around valve station for avoiding any local flooding of area and as per specificati on and instructions of Owner/Owner's representative. Preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other prov isions of Contract document and instructions of Engineer-in- charge. Note: 1. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor with in the rate quoted. 2. This work is exclusive of all works associated with main pipeline covered under SOR item specified as INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. All civil / structural works including area fencing and gate, pipe supports, valve chamber shall be paid separately as per unit r ate provided elsewhere in the SOR. 4. 4\\"\\" and above (fittings & flanges etc. ), material supply is also in the contractor scope. It shall be be paid separately under Supply item provided elsewhere in the SOR.\\"
24\\"PURGING & INERTIZATION OF PIPELINE - INCLUDING SUPPLY OF NITROGEN Purging and inertization of pipeline section between the two isolation valves with nitrogen to make the pipeline section free from o xygen including supply of required quantity of nitrogen and all equipments, tools and tackles, manpower etc. required for the works and as per instruction of engineer in charge. Complete with necessary regulator, hoses, pressure guage, connections with tools and t ackles. Submission of purging plan for approval before actual work and complete assistance for purging. By filling and pressurizing with nitrogen upto a pressure of 2 bar(g). Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator , hoses, connections with tools and tackles instruction of EIC. Payment shall be made on number of nitrogen cylinders used on actual basis. Note: 1. Contractor shall be responsible for maintaing the pressure up to 2 bar(g) till commissioning. However, Additional nitrogen fillin g shall be paid as per SOR mentioned immediate above for maintaing the presurre up to 2 barg on actual basis.\\"
254\\" NB PURGING & INERTIZATION OF PIPELINE
26Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator, hoses, connections with tools and tackles instruction of EIC.
27\\"PIPELINE LAYING / INSTALLATION OF ABOVE GROUND PIPELINE (WHEREVER REQUIRED AT CNG/DRS/MRS STATIONS & CONSUMER ENDS ETC.)\\"
28\\"WELDING OF PIPES WITH PIPE / FITTINGS / VALVES : - Receiving and taking over of all free issue materials from company’s designated place of issue, handling including lifting, transpor tation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site fo r field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings etc. to match with grinding the edges of pipes, fittings etc. to match with the matching edges of uneven / different thickness wherever required fit - up bending, p reheating wherever required, welding etc. pipe fittings like elbows, tees, reducers, weldolets, sockolets, vent and drain point conn ection etc. including providing stub-in connection, fabricated fittings and reinforcement pads etc. as required. Carrying out Non-de structive testing as per specification & instruction of EIC. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contract or to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractor scope. It shall be be paid separately under Suppl y item provided elsewhere in the SOR on actual quantity basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor within the rate quoted. These items shall not be separately measured and paid.\\"
294\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
302\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
311.5\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
321\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
330.75\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
34\\"WELDING OF PIPES WITH FLANGES Receiving and taking over of all free issue materials from OWNER’s designated place of issue, handling including lifting, transporta tion from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, flanges etc to match with the matching ed ges of uneven / different thickness, preheating wherever required, welding etc. including supply and fixing of all types of gaskets (including gaskets for RTJ flanges), bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instr uction of EIC. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contract or to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractor scope. It shall be be paid separately under Suppl y item provided elsewhere in the SOR on actual quantity basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor within the rate quoted. These items shall not be separately measured and paid.\\"
354\\" NB WELDING OF PIPES WITH FLANGES
362\\" NB WELDING OF PIPES WITH FLANGES
371.5\\" NB WELDING OF PIPES WITH FLANGES
381\\" NB WELDING OF PIPES WITH FLANGES
390.75\\" NB WELDING OF PIPES WITH FLANGES
40\\"ERECTION & TESTING Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon steel piping and fitting s of all sizes and ratings including supply & installation of all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind flanges, spectacle blind flanges, valves, pipes of sizes below 4” NB and of all ratings including supply of all consumables, equipment, manpower and other resources and execution of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative and as per all provisions of the contract document. Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with equipment nozzle , aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, fl anges blind flange, spectacle blind flanges, branch connection / tapping, vents and drains, required for process and hydro testing, tapping for pressure gauges thermowells sample connections, etc. Painting of entire system (including all pipes and accessories) as per specification, including supply of approved paints and primer s, preparation of surface and application of primer and paint, identification lettering / numbering, color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by OWNER and providing scaffolding for a ll heights etc. Cleaning and flushing by water/ compressed air, testing of the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air / other methods approved by OWNER. Cleaning and flushing by water / compressed air, testing of the system including hydrostatic, pneumatic and any other type of testin g as specified, draining, drying by compressed air/ other methods as approved by Owner. Completion of all such work in all respect as per scope of work and as per drawings specifications and instructions of the OWNER and keeping in the system ready in all respects for further commissioning and start up. Hooking up with other system piping at battery limit. Preparation of isometric, fabrication drawings. Bill of materials as per specifications, drawings and instruction of Owner / Owner’ s Representative. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contractor to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractors scope.
414\\" NB ERECTION & TESTING
422\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
431.5\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
441\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
450.75\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
46\\"SUPPLY & INSTALLATION OF SS PRESSURE GAUGE Supply of SS pressure gauges as per data sheet and drawing enclosed in tender and Installation of pressure guages and their accessor ies inclusive of supply of necessary piping materials and tubings along with all necessary valves and fittings, fabrication and inst allation of impulse lines / mainfolds and hydrulic testing and calibration as per installation standard.\\"
47Supply & installation of SS pressure gauge (Make - as per recommended vendor list) as per data sheet attached in the tender
48PIPE SUPPORTS & STRUCTURES
49Supply, fabrication and erection of all types of pipe supports of MS material like clamps, saddle, guide stops, cradles, turn buckles, anchors, T-posts; stockade / trestle and pipe bridge for overhead piping; frames for canopy, approach ladders and platforms, cro ssover, cable tray supports etc. including painting suitable for highly corrosive area as per specification labor and supervision & complete work as per specifications and instruction of Engineer in charge (Bolts, nuts, washers, U - clamps etc. for supporting shal l be supplied by the contractor within the rates quoted. These items will not be measured and paid separately) this work is to be complete in all respect as per scope of work.
50\\"STRUCTURAL WORKS (FENCING & GATE) Supply and erection of single leaf mild steel gate 2.5 M high with mesh up to 2.0 M height and barbed wire fencing of 0.5 M height a nd 2.0 M wide complete in all respect including painting as per specification on all MS items, all works as per specification and dr awings including foundations and RCC.\\"
51Supply and erection of double leaf mild steel gate 2.5 M high with mesh up to 2.0 M height and barbed wire fencing 0.5 M height and 4.0 M wide complete in all respect including painting as per TS on all MS items, all works as per specification and drawings includ ing foundations and RCC.
52\\"Supply of all materials, fabrication and erection of chain link fencing 2.5 M high with mesh up to 2.0 M height and barbed wire fen cing complete in all respect including painting as per TS on all MS items, all works as per specification and drawings including fou ndations and RCC. Note: 1. Rate include cost of all labor, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement including sulphate resistant cement for sub structures, R/F steel, inserts, bolts, conduits, bitumen, other minor construction mater ials, shuttering, stinging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and sundry works.\\"
53\\"PERMANENT MARKER Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of foundation, pedestals and grouting with concrete , clearing, supply and application of approved color and quality of primer and paint (powder coated), stencil letter cutting for num bers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner / Owner’s Representative.\\"
54RCC route marker as per approved drawing
55Pipeline Warning markers/ Direction markers/kilometer marker with Post & foundations as per drawing. It shall be powder coated only & before installation take approval from the EIC.
56\\"Leak / Burst (Attributable to Company) All works for locating major leak / burst (occurred during hydrostatic testing) including necessary repairing / replacing defective pipelength, including cutting and removing out defective pipes, pretesting of replacement pipe and welding into mainline, NDT of wel ds and re-bevelled area, repair and re-testing of defective welds, coating of welded joints, clean-up, retesting the pipeline includ ing providing all necessary equipment's, labour, materials, consumables and inputs otherthan Owner supplied materials and performing all works as per drawings, specifications enclosed with the Contract and directions of Engineer-in-Charge. Note: 1. This rate is applicable for manufacturing defects in Company supplied material only.\\"
574\\" NB Leak / Burst REPAIR
58\\"CONTINUOUS CONCRETE COATING (FOR CS PIPES) Supply of all consumables, materials and application of 50 mm thk. continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-20 for below specified Line Pipe size and field joints thereof in all areas of work wherever required as per sit e condition and performing all works as per specification on the line pipe for following sizes.\\"
59Specified NB 4\\" x 6.4 mm W.T. x 50 mm Concrete Coating
60\\"CONSTRUCTION OF RCC Construction and handing over of RCC Valve Pit of different size (internal dimension) as per technical specification and direction o f engineer-in-charge, complete in all respect. Scope of work shall be as per approved drawing. All civil works including supply of all material, excavation of pit, piping & valve supports including all PCC and RCC/ Brick works for valves pit, pedestals with insert plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local flooding of area, as per specifica tion enclosed and instruction of Engineer-in-Charge.\\"
61RCC Chamber - (Size - 2 m x 1.5 m)
62RCC Chamber - (Size - 2.5 m x 2.2 m)
63RCC Chamber - (Size - 3 m x 2.5 m)
64\\"RESTORATION OF ROADS Restoration of asphalt / concrete / red stone roads / pavement/ pavor block including compaction of soil, to original condition as p er requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness.\\"
65Restoration of Asphalt road up to 15 cm thickness
66Restoration of Asphalt road beyond 15 cm up to 20 cm thickness
67Restoration of RCC Concrete road up to 15 cm thickness
68Restoration of red stone road / footpath / pavement up to 4 inch thickness
69Providing and laying PCC (1:2:4) as per technical specifications & instruction of Engineer in charge. (Aggregate size 20 mm down)
70Providing and laying PCC (1:4:8) as per technical specifications & instruction of Engineer in charge. (Aggregate size 40 mm down)
71\\"RCC Providing and Laying reinforced cement concrete of grade M -25 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals etc. at all depths & heights including excavation shaffolding, shuttering, reinforcement steel ( FE 500D), all labour, materials, tools & tackles etc as per the instruction of Engineer in charge.\\"
72\\"Temporary Cathodic Protection: Design, Detailed Engineering, Survey, Supply, Installation, Testing and commissioning & Monitoring of the temporary cathodic protect ion [TCP] system using galvanic anodes to protect the external surface of the entire steel grid network from, against soil- side corrosion for minimum 2 year or till commissioning of permanent CP system whichever is later. All work shall b e carried out conforming to the Scope of work, Design Basis, Data Sheets, specification, standard and approved vendor list and p rovisions of GCC, SCC including Technical specifications,OWNER/ CONSULTANT approved survey report/design package, including all mate rials, equipments, consumables, start up/commissioning spares etc. complete in all respects including transportation, storage of mat erials at site, manpower, in line with direction of Engineer In-charge.\\"
73Design & detail engineering of TCP system including design basis, data sheet, standards & specifications based on soil resistivity , Soil Ionic & Microbial Loading, Interfering elements surveys measured from pipeline ROW.
74Soil Resistivity (At every 1000 meter), Soil Ionic & Microbial Loading (At every 5 Km and wherever Soil variation) and Interfering e lements surveys from pipeline ROW.
75Supply, installation, Testing & Commissioning of Test lead Points (TLP) including weather proof Test Lead Box as specified in specif ication with backlite strip, bolt terminals, 4” dia heavy duty pipe at top end to fit the test lead box and base plate welded at the bottom including MS bend for concrete Base, Bend, Cables, pipe to cable connection, Epoxy Encapsulation & Miscellaneous such as con nectors, Excavation and backfilling trenches for cable laying & Pin Brazing etc. complete in all respects. The work shall include su pply & fixing of a non corrosive name plate containing the details like KM location, identification, TLP No, Direction of flow, conn ection scheme, type etc., on the side of Top box including the cost of all labour, materials, tools & tackles etc. cables shall be a nnealed high conductivity, tinned, stranded copper conductor, XLPE insulated, 650/1100 V grade, PVC sheathed or as per specification .
76\\"Test Lead Point TYPE A (POTENTIAL MEASUREMENT) with minimum two cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential meas urement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP ) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 60 0 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, ter mination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techniqu e), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy pa int / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixin g of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sche me, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed , all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. Th e work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directi ons of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
77\\"Test Lead Point TYPE B: (CURRENT MEASUREMENT) with minimum four cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential measu rement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS S : heet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 10 0 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof conceal ed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, t ermination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techni que), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated i n standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fix ing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sc heme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever install ed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & direc tions of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
78Test Lead Point TYPE C (CASED CROSING WITH BARE CASING) with minimum four cables including two cables of 1Cx06 Sq.mm Potential measurement cable & two cables of 1Cx10 Sq.mm armoured anode connection, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion
79Test Lead Point TYPE D (CASED CROSING WITH COATED/PAINTED CASING) with minimum four cables including two cables of 1Cx06 Sq.mm Potential measurement cable & two cables of 1Cx10 Sq.mm armoured anode connection, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection
80\\",,Test Lead Point TYPE E (FOREIGN PIPELINE CROSSING) with minimum four cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential measurement cables & 1Cx25 Sq.mm armoured Bonding Connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directions of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWINGS\\"
81Test Lead Point TYPE F (INSULATING JOINT SCHEME) with minimum four cables including two cables of 1Cx06 Sq.mm armoured Potential measurement cables & two cables of 1Cx25 Sq.mm armoured galvanic anode connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe
82Test Lead Point TYPE H (HT LINE CROSSING) with minimum two cables including 1Cx06 Sq.mm armoured Potential measurement cables & 1Cx25 Sq.mm armoured galvanic anode connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 6 00 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directions of the Site Engineer/Engineer-In-Charge.
83Supply &Installation of 05 KA Polarization cell. It should be utilized in vandal proof areas for passage of induced voltage on the pipeline in the vicinity of AC transmission lines to earth during normal as well as fault conditions. It shall maintain the isolation between Zn anode and pipeline so that CP current shall not be consumed by Zn anode. Polarization cell shall be installed in vandal proof areas in a IP-55 enclosure. Contractor to supply polarization cell with enclosure and necessary material required for making connection arrangement between polarization cell and Zn anode inside enclosure as per requirements of polarization cell manufaturer.
84Supply & Installation of pre-packed Mg Anode (7.6 Kg) with one cable including 1Cx10 Sq.mm Unarmoured cable (with sufficent length) & encapsulation kit for cable connection termination of Anode tail cable in the TLP etc. complete in all respects as per direction o f Engineer-In-Charge.
85Supply & Installation of pre-packed Zinc Anode (40 years design life / Min. 22 Kg) for HT Line crossing with one cable including 1Cx 25 Sq.mm armoured cable (with sufficent length), encapsulation kit termination of Anode tail cable in the TLP etc.
86Supply & Installation of Spark Gap Arrester/Surge Diverter for Insulating Joint complete in all respects as per direction of Engine er-In-Charge including the cost of all labour, materials, tools and tackles etc.
87Supply & Installation of SSD for HT line Crossing as per tender specs/drawings complete in all respects as per direction of Engineer -In-Charge including the cost of all labour, materials, tools and tackles etc.
88Supply & Installation of Zinc Grounding Cell of 20 Kg each for IJ with two cables including 1Cx25 Sq.mm armoured cable (with suffice nt length), encapsulation kit termination of Anode tail cable in the TLP etc.
89MONITORING TEST STATION FOR PSP AFTER COMPLETION OF PIPE LAYING AND TCP WORK
90Monitoring of health of installed TCP including measurement of pipe to soil potential (PSP) reading on monthly basis. The scope of work include collection / measurement of parameters of test stations of PCP and TCP sections and IJ, submission of reports to Owner & PMC as detailed in technical specifications and rectification/repair of defects/abnormalties to keep the system in healthy positio n complete in all respects as per direction of Engineer-In-Charge.
91\\"Notes for TCP items: 1. Any other material & activities not mentioned/covered above, but otherwise required for satisfactory completion/safety of work as defined in tender has to be supplied / done by contractor within quoted price. No extra payment shall be made. 2. The above quantities are tentative and may vary during detailed engineering considerably depending upon site condition, methodolo gy adopted as per site requirement with due approval of Owner / Consultant. 3. The quantity may vary during execution stage and payment shall be made based on the work for the actual quantity executed.\\"
92\\"TELECOMMUNICATION SITE WORK (As per scope of work and Standard Specification of Bid documents)\\"
93Supply and Laying of HDPE Telecom Duct as per specification :-Supply & Laying of single 40mm OD, 6kg/cm2 permanently lubricated HD PE ducts. Factory Acceptance Testing as per specification. (Qty with spares) Supply of spare HDPE accessories Plastic Couplers (PC), End Plugs (EP), Cable Sealing Plugs (CSP), End Caps (EC) etc suitable for supplied Duct , Laying in same pipeline trench direct bur ied or tied along with steel at all crossings (cased or uncased), in all type of soil & terrain, excavation as required, including cleaning and sealing of ducts at the end of laid drum lengths, preparation & Supply of Cable Blowing Pit including sand, jointing o f HDPE conduit, supply of all type of fitting for HDPE telecom duct laying, Testing of HDPE Duct and accessories after laying, prepa ration of report and final drawing & documents as per specification, joint location marking, erection accessories (suitable for min 8 kg/cm2 pressure rating),all complete as per specifications provided in the bid document & as per direction of consultant. (This du ct is for future requirement for total length of pipeline as per spec. and drawing ). HDPE duct is to be tied at 2 o-clock position to carrier pipe with string at regular intervals and held with Galvanized clamps or suitable material as decided by client / consult ant.
94Blowing of Optical Fiber Cable : - All activities pertaining to blowing of optical fiber cable in self lubricated HDPE Telecom duct (after testing of drum at site),through CS/ HDPE conduits at crossing, cable sealing, padding, backfilling etc. using all materials required, etc. all complete as per specifications and drawing provided in the bid document & as per direction of consultant.
95Supply and installation of jointing pits, including sand, etc. all complete as per spec., drawing provided in the bid document and the direction of client / consultant.
96Jointing / splicing of optical fiber cable ( 24 Fibers ) including supply and installation of joint markers (RF id Disk type), etc., testing all completed as per specifications & drawing provided in the bid document and direction of consultant.
97Supply & installation of optical splice closer as per specifications & drawing provided in the bid document and direction of client / consultant
98Supply & installation of Fiber termination cabinet as per specifications & drawing provided in the bid document and direction of cl ient / consultant
99Supply & Installation of wall mounted fiber termination box (FMS) as per tender specifications.
100Supply & Installation of Transition pit as per tender specifications.
101The soil investigation includes boring, collection of disturbed samples from bore holes and visual engineering classification of soil along the pipeline route and submission of detailed report to Company. Visual classification of soil shall be in accordance with IS-1498; IS Classification and Identification of Soils for General Engineering Purposes” Geotechnical investigation of soil shall be carried out as per relevant clauses of IS 1892 and other applicable IS standards, Except for crossing location as defined below, the boring shall be carried out upto 10.0 M depth below NGL or 1.0 M. below the rock bed, if rock is encountered at a depth of less than 10.0 M. In case of boring at Highways (National / State), River and Railways crossings, the boring shall either terminated at a depth of 15.0 M below NGL or 1.0 M. below the rock bed on top of bed rock, if rock is encountered at a depth less than 15.0 M. Results of soil investigation survey shall be submitted in the form of report covering minimum the followings: Visual engineering classification of soils encountered along the pipeline route in bore log form. Depth of Ground Water Table (GWT) below NGL shall also be mentioned if encountered. Soil profiles along the pipeline route shall also be prepared and attached with the report. Regions along the pipeline route where hard rock is present and special excavation techniques like blasting, etc. needs to be adopted for excavation of pipeline trench shall be clearly indicated in the report. Test shall be carried out at approved laboratory. Summary of results obtained from tests and their interpretation to evaluate soil parameters. Visual engineering classification of soils obtained from bore holes shall be shown in Alignment sheets also whenever preparation of Alignment sheets are in SURVEYOR’S scope of work.”
102The soil investigation includes boring,
103SUPPLY OF LONG RADIUS BENDS (R = 3D), RATING 300# Supply & fabrication of 3D bends as per PMS, specification requirement, data sheet, manufacturer, testing of fabricated bend & transportation of fabricated bend to site for installation of sizes specified below. All the Fabrication and Testing shall be as per specification. The butt-weld end thickness of the bend shall meet the thickness of connected line pipe as specified below:
1044\\" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm
10515 Degree 4\\" NB, Material : API 5L X 52
10622.5 Degree 4\\" NB, Material : API 5L X 52
10730 Degree 4\\" NB, Material : API 5L X 52
10845 Degree 4\\" NB, Material : API 5L X 52
10960 Degree 4\\" NB, Material : API 5L X 52
11090 Degree 4\\" NB, Material : API 5L X 52
111Supply of Equal Tee, Rating 300 #
1124\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
113Supply of Reducing Tee, Rating 300 #
11410\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
1158\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
1166\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
1174\\" x 2\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
118Flanges (WNRF), Rating 300 #
1194\\" (Material : ASTM A 694 F 52) Flanges (WNRF)
120Blind Flanges (RF), Rating 300 #
1214\\" (Material : ASTM A 694 F 52) BLIND FLANGE
122Insulating Joints as per tender specs, Rating 300 #
1234\\" Insulating Joints
124Supply of CS Concetric Reducer, 300#
1258\\"X4\\" A234 Gr. WPB, BW Sch. 80 Concetric Reducer
1266\\"X4\\" A234 Gr. WPB, BW Sch. 80 Concetric Reducer
127Supply of CS End caps
1284\\" NB End caps A234 Gr. WPB, BW Sch. 80
129Steel pipeline laying in ARWAL GA
130INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL)
131Specified NB (inch) x Wall thickness (mm) - Material of Construction
1324\\" x 6.4 mm - API 5L X 52 ( HFW / SMLS )
133\\"PIPELINE LAYING LIAISONING AND GETTING PERMISSIONS FROM THE STATUTORY AUTHORITIES
134\\"SUPPLY & INSTALLATION OF CASING PIPE ALONG WITH MAIN CARRIER PIPELINE
13510\\" NB Carbon steel casing pipe (Augur boring & Jacking Method / Moling/HDD) - For 4\\" Mainline Carrier Pipe
136\\"INSTALLATION OF CARRIER PIPE (CARBON STEEL) BY TRENCHLESS METHOD WITHOUT CASING.\\"
137Any other activities not mentioned/ covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works
138Installation of 4\\" NB PE 4 inch CS conduit as required by HDD
139Installation of 4\\" NB PE Coated Steel pipe alongwith 4 inch CS conduit as required by HDD in HARD ROCK USING DIAMOND CUTTER
140Installation of 4\\" NB PE Coated Steel pipe without any casing by Moiling
141\\"INSTALLATION OF CARRIER PIPE BY HDD METHOD (SHALLOW HDD OR HDD ALONG THE ROAD WITHOUT CROSSING) 'Execution of road/other crossing by Shallow Horizontal Directional Drilling (HDD) technique OR laying by HDD method along the road without any crossing at a required depth as per site condition including mobilization & de-mobilization at site(s), supply of all ma terials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as p er all provisions of the contract document complete in all respect as per the instructions of the Engineer – in – charge /Site engin eer. 'Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspect ion of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage ar ea required thereof till the pipes are installed in permanent position. 'Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangemen t for pipeline stringing, launching etc. 'Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating includ ing defects/ damages occurring during transportation and handling. 'String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radi ography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiogra phs, repair of defects in the welds and re-testing etc. 'Carrying out pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of d efects and retesting etc. 'Coating of the field joints of the pipe string to be installed by shallow HDD method with DIRAX heat shrink sleeves of approved mak e used for HDD crossings. 'Repair of all coating damages in the pipe section to be laid by shallow HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of approved make. \\"
142\\"Supply & fixing of easy to install heat shrinkable duct end caps for HDPE duct for OFC (wherever OFC has to be laid along with the carrier pipeline). 'Installation of the pipeline and OFC conduit as a bundle crossing below the Road/ other utility horizontally by shallow HDD operati on to the correct profile as per the approved drawings in a pre-reamed hole of appropriate size. 'Carrying out post-installation coating survey as per approved procedure. 'Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. 'All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note: 1. Payment shall be based on the actual length (Length between tie-in joints) of pipeline laid by Shallow HDD. Exact location of ti e-in shall be approved by Owner/ Owner's Representative. 3. The length of Shallow HDD mentioned is tentative and may vary to the considerable extent, depending upon requirements as per site conditions and shall be decided by Engineer-in-Charge. 4. Payment for the length of final tie-in carrier pipeline string with mainline laid by Shallow HDD are inclusive in this above item rate. No separate payment shall be made under other clauses mentioned elsewhere. 4. The supply and laying of HDPE duct is included in this SOR item and will not be paid separatly. 6. This item shall be executed as per specific instruction of Engineer-In-Charge.\\"
143Installation of 4\\" NB PE Coated Steel pipe along with 2 Nos HDPE Duct as required by Shallow HDD method
144\\"INSTALLATION OF SV STATIONS All works for installation of all underground & above ground piping at all elevations and below ground at all depth for Sectionalizi ng Valve Station with / without future tap-off in the same valve chamber as per P & ID & GAD in all type of terrains and soils incl uding \\"\\"Receiving and taking over\\"\\" as defined in the specifications, handling, loading, transportation and unloading of all Owner s upplied materials i.e. extended stem, butt welded, sectionalizing ball valve, other types of valves, line pipes for mainline from Ow ner's designated place(s) of issue to work site, Supply of pipes, fittings & valves for piping of size below 4\\"\\" dia, supply of all consumables, materials, manpower and carrying out all mechanical works of underground and above ground piping including fabrica tion, welding, non-destructive testing of welds by radiography or Utrasoninc Testing in case radiography is not possible, weld repa irs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testing, pneumatic seat & seal te st as per API 6D, cutting of mainline and beveling (if required), tie-in of valve assembly, including radiography of tie-in joints a nd Ultrasoninc testing of Golden joints, corrosion, coating and external painting as required. Installation of instruments like pressure/ temperature instruments/ gauges, provision for tubing to the actuator in future, obtainin g all statutory clearances, approvals and permissions for the works (wherever required). Excavation in all types of soil including soft / hard / rocky surfaces, providing 200 mm thk PCC for valve base support, backfilling and compaction with approved soil for installation of pipes and fittings, etc including sand padding all around the valves in SV st ation, pipe supports and fencing would be paid against separate SOR s ), painting, finishing, clean-up and restoration of site; prep aration of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisio ns of Contract document and instructions of Engineer-in- charge. Note: 1. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor with in the rate quoted. 2. This work is exclusive of all works associated with main pipeline covered under SOR item specified as INSTALLATION OF CARRIER PIP E BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. All civil / structural works including area fencing and gate, pipe supports, valve chamber shall be paid separately as per unit r ate provided elsewhere in the SOR. 4. 4\\"\\" and above (fittings & flanges etc. ), material supply is also in the contractor scope. It shall be be paid separately under Supply item provided elsewhere in the SOR.\\"
145SV STATION WITH VENT WITHOUT BY-PASS LINE AND WITH / WITHOUT FUTURE TAP-OFF
1464\\" NB SV STATION WITH VENT
147SV STATION WITH VENT WITH BY-PASS LINE AND WITH / WITHOUT FUTURE TAP-OFF
1484\\" NB SV STATION WITH VENT WITH BY-PASS LINE
149\\"COMPLETE WORKS FOR TAP-OFF POINTS (NOT PART OF SV STATION COMMON VALVE CHABMBER)\\"
150\\"Works at Future Connections: Complete works of design, engineering, installation of all piping, valves, fittings at all depths inside the pit in all types of te rrains and soils including transportation, handling of Owner supplied material from Owner's designated issue point(s) to work site, supply of Contractor's supplied materials to work site(s), all mechanical works including fabrication, welding, non destructive tes ting of welds, weld repairs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testin g, cutting of mainline and beveling (if required), tie-in of valve assembly, including radiography of tie-in joints, corrosion, coating and external painting as required. All civil works including excavation of pit, piping supports including all PCC and RCC works for pedestals with insert plates as re quired, construction of valve chamber including with supply of all material and finishing, clean up and restoration of site , filling and grading of area around valve station for avoiding any local flooding of area and as per specificati on and instructions of Owner/Owner's representative. Preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other prov isions of Contract document and instructions of Engineer-in- charge. Note: 1. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor with in the rate quoted. 2. This work is exclusive of all works associated with main pipeline covered under SOR item specified as INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. All civil / structural works including area fencing and gate, pipe supports, valve chamber shall be paid separately as per unit r ate provided elsewhere in the SOR. 4. 4\\"\\" and above (fittings & flanges etc. ), material supply is also in the contractor scope. It shall be be paid separately under Supply item provided elsewhere in the SOR.\\"
1514\\" x 4\\" for newly laid line Works at Future Connections
152\\"PURGING & INERTIZATION OF PIPELINE - INCLUDING SUPPLY OF NITROGEN Purging and inertization of pipeline section between the two isolation valves with nitrogen to make the pipeline section free from o xygen including supply of required quantity of nitrogen and all equipments, tools and tackles, manpower etc. required for the works and as per instruction of engineer in charge. Complete with necessary regulator, hoses, pressure guage, connections with tools and t ackles. Submission of purging plan for approval before actual work and complete assistance for purging. By filling and pressurizing with nitrogen upto a pressure of 2 bar(g). Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator , hoses, connections with tools and tackles instruction of EIC. Payment shall be made on number of nitrogen cylinders used on actual basis. Note: 1. Contractor shall be responsible for maintaing the pressure up to 2 bar(g) till commissioning. However, Additional nitrogen fillin g shall be paid as per SOR mentioned immediate above for maintaing the presurre up to 2 barg on actual basis.\\"
1534\\" NB PURGING & INERTIZATION OF PIPELINE
154Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator, hoses, connections with tools and tackles instruction of EIC.
155\\"PIPELINE LAYING / INSTALLATION OF ABOVE GROUND PIPELINE (WHEREVER REQUIRED AT CNG/DRS/MRS STATIONS & CONSUMER ENDS ETC.)\\"
156WELDING OF PIPES WITH PIPE / FITTINGS / VALVES : - Receiving and taking over of all free issue materials from company’s designated place of issue, handling including lifting, transpor tation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site fo r field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings etc. to match with grinding the edges of pipes, fittings etc. to match with the matching edges of uneven / different thickness wherever required fit - up bending, p reheating wherever required, welding etc. pipe fittings like elbows, tees, reducers, weldolets, sockolets, vent and drain point conn ection etc. including providing stub-in connection, fabricated fittings and reinforcement pads etc. as required. Carrying out Non-de structive testing as per specification & instruction of EIC. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contract or to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractor scope. It shall be be paid separately under Suppl y item provided elsewhere in the SOR on actual quantity basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor within the rate quoted. These items shall not be separately measured and paid.\\"
1574\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
1582\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
1591.5\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
1601\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
1610.75\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
162\\"WELDING OF PIPES WITH FLANGES Receiving and taking over of all free issue materials from OWNER’s designated place of issue, handling including lifting, transporta tion from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, flanges etc to match with the matching ed ges of uneven / different thickness, preheating wherever required, welding etc. including supply and fixing of all types of gaskets (including gaskets for RTJ flanges), bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instr uction of EIC. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contract or to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractor scope. It shall be be paid separately under Suppl y item provided elsewhere in the SOR on actual quantity basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor within the rate quoted. These items shall not be separately measured and paid.\\"
1634\\" NB WELDING OF PIPES WITH FLANGES
1642\\" NB WELDING OF PIPES WITH FLANGES
1651.5\\" NB WELDING OF PIPES WITH FLANGES
1661\\" NB WELDING OF PIPES WITH FLANGES
1670.75\\" NB WELDING OF PIPES WITH FLANGES
168\\"ERECTION & TESTING Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon steel piping and fitting s of all sizes and ratings including supply & installation of all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind flanges, spectacle blind flanges, valves, pipes of sizes below 4” NB and of all ratings including supply of all consumables, equipment, manpower and other resources and execution of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative and as per all provisions of the contract document. Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with equipment nozzle , aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, fl anges blind flange, spectacle blind flanges, branch connection / tapping, vents and drains, required for process and hydro testing, tapping for pressure gauges thermowells sample connections, etc. Painting of entire system (including all pipes and accessories) as per specification, including supply of approved paints and primer s, preparation of surface and application of primer and paint, identification lettering / numbering, color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by OWNER and providing scaffolding for a ll heights etc. Cleaning and flushing by water/ compressed air, testing of the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air / other methods approved by OWNER. Cleaning and flushing by water / compressed air, testing of the system including hydrostatic, pneumatic and any other type of testin g as specified, draining, drying by compressed air/ other methods as approved by Owner. Completion of all such work in all respect as per scope of work and as per drawings specifications and instructions of the OWNER and keeping in the system ready in all respects for further commissioning and start up. Hooking up with other system piping at battery limit. Preparation of isometric, fabrication drawings. Bill of materials as per specifications, drawings and instruction of Owner / Owner’ s Representative. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contractor to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractors scope.
1694\\" NB ERECTION & TESTING
1702\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
1711.5\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
1721\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
1730.75\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
174\\"SUPPLY & INSTALLATION OF SS PRESSURE GAUGE Supply of SS pressure gauges as per data sheet and drawing enclosed in tender and Installation of pressure guages and their accessor ies inclusive of supply of necessary piping materials and tubings along with all necessary valves and fittings, fabrication and inst allation of impulse lines / mainfolds and hydrulic testing and calibration as per installation standard.\\"
175Supply & installation of SS pressure gauge (Make - as per recommended vendor list) as per data sheet attached in the tender
176PIPE SUPPORTS & STRUCTURES
177Supply, fabrication and erection of all types of pipe supports of MS material like clamps, saddle, guide stops, cradles, turn buckles, anchors, T-posts; stockade / trestle and pipe bridge for overhead piping; frames for canopy, approach ladders and platforms, cro ssover, cable tray supports etc. including painting suitable for highly corrosive area as per specification labor and supervision & complete work as per specifications and instruction of Engineer in charge (Bolts, nuts, washers, U - clamps etc. for supporting shal l be supplied by the contractor within the rates quoted. These items will not be measured and paid separately) this work is to be complete in all respect as per scope of work.
178\\"STRUCTURAL WORKS (FENCING & GATE) Supply and erection of single leaf mild steel gate 2.5 M high with mesh up to 2.0 M height and barbed wire fencing of 0.5 M height a nd 2.0 M wide complete in all respect including painting as per specification on all MS items, all works as per specification and dr awings including foundations and RCC.\\"
179Supply and erection of double leaf mild steel gate 2.5 M high with mesh up to 2.0 M height and barbed wire fencing 0.5 M height and 4.0 M wide complete in all respect including painting as per TS on all MS items, all works as per specification and drawings includ ing foundations and RCC.
180\\"Supply of all materials, fabrication and erection of chain link fencing 2.5 M high with mesh up to 2.0 M height and barbed wire fen cing complete in all respect including painting as per TS on all MS items, all works as per specification and drawings including fou ndations and RCC. Note: 1. Rate include cost of all labor, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement including sulphate resistant cement for sub structures, R/F steel, inserts, bolts, conduits, bitumen, other minor construction mater ials, shuttering, stinging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and sundry works.\\"
181\\"PERMANENT MARKER Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of foundation, pedestals and grouting with concrete , clearing, supply and application of approved color and quality of primer and paint (powder coated), stencil letter cutting for num bers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner / Owner’s Representative.\\"
182RCC route marker as per approved drawing
183Pipeline Warning markers/ Direction markers/kilometer marker with Post & foundations as per drawing. It shall be powder coated only & before installation take approval from the EIC.
184\\"Leak / Burst (Attributable to Company) All works for locating major leak / burst (occurred during hydrostatic testing) including necessary repairing / replacing defective pipelength, including cutting and removing out defective pipes, pretesting of replacement pipe and welding into mainline, NDT of wel ds and re-bevelled area, repair and re-testing of defective welds, coating of welded joints, clean-up, retesting the pipeline includ ing providing all necessary equipment's, labour, materials, consumables and inputs otherthan Owner supplied materials and performing all works as per drawings, specifications enclosed with the Contract and directions of Engineer-in-Charge. Note: 1. This rate is applicable for manufacturing defects in Company supplied material only.\\"
185\\"CONTINUOUS CONCRETE COATING (FOR CS PIPES) Supply of all consumables, materials and application of 50 mm thk. continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-20 for below specified Line Pipe size and field joints thereof in all areas of work wherever required as per sit e condition and performing all works as per specification on the line pipe for following sizes.\\"
186Specified NB 4\\" x 6.4 mm W.T. x 50 mm Concrete Coating
187\\"CONSTRUCTION OF RCC Construction and handing over of RCC Valve Pit of different size (internal dimension) as per technical specification and direction o f engineer-in-charge, complete in all respect. Scope of work shall be as per approved drawing. All civil works including supply of all material, excavation of pit, piping & valve supports including all PCC and RCC/ Brick works for valves pit, pedestals with insert plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local flooding of area, as per specifica tion enclosed and instruction of Engineer-in-Charge.\\"
188RCC Chamber - (Size - 2 m x 1.5 m)
189RCC Chamber - (Size - 2.5 m x 2.2 m)
190RCC Chamber - (Size - 3 m x 2.5 m)
191\\"RESTORATION OF ROADS Restoration of asphalt / concrete / red stone roads / pavement/ pavor block including compaction of soil, to original condition as p er requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness.\\"
192Restoration of Asphalt road up to 15 cm thickness
193Restoration of Asphalt road beyond 15 cm up to 20 cm thickness
194Restoration of RCC Concrete road up to 15 cm thickness
195Restoration of red stone road / footpath / pavement up to 4 inch thickness
196Providing and laying PCC (1:2:4) as per technical specifications & instruction of Engineer in charge. (Aggregate size 20 mm down)
197Providing and laying PCC (1:4:8) as per technical specifications & instruction of Engineer in charge. (Aggregate size 40 mm down)
198\\"RCC Providing and Laying reinforced cement concrete of grade M -25 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals etc. at all depths & heights including excavation shaffolding, shuttering, reinforcement steel ( FE 500D), all labour, materials, tools & tackles etc as per the instruction of Engineer in charge.\\"
199\\"Temporary Cathodic Protection: Design, Detailed Engineering, Survey, Supply, Installation, Testing and commissioning & Monitoring of the temporary cathodic protect ion [TCP] system using galvanic anodes to protect the external surface of the entire steel grid network from, against soil- side corrosion for minimum 2 year or till commissioning of permanent CP system whichever is later. All work shall b e carried out conforming to the Scope of work, Design Basis, Data Sheets, specification, standard and approved vendor list and p rovisions of GCC, SCC including Technical specifications,OWNER/ CONSULTANT approved survey report/design package, including all mate rials, equipments, consumables, start up/commissioning spares etc. complete in all respects including transportation, storage of mat erials at site, manpower, in line with direction of Engineer In-charge.\\"
200Soil Resistivity (At every 1000 meter), Soil Ionic & Microbial Loading (At every 5 Km and wherever Soil variation) and Interfering e lements surveys from pipeline ROW.
201Supply, installation, Testing & Commissioning of Test lead Points (TLP) including weather proof Test Lead Box as specified in specif ication with backlite strip, bolt terminals, 4” dia heavy duty pipe at top end to fit the test lead box and base plate welded at the bottom including MS bend for concrete Base, Bend, Cables, pipe to cable connection, Epoxy Encapsulation & Miscellaneous such as con nectors, Excavation and backfilling trenches for cable laying & Pin Brazing etc. complete in all respects. The work shall include su pply & fixing of a non corrosive name plate containing the details like KM location, identification, TLP No, Direction of flow, conn ection scheme, type etc., on the side of Top box including the cost of all labour, materials, tools & tackles etc. cables shall be a nnealed high conductivity, tinned, stranded copper conductor, XLPE insulated, 650/1100 V grade, PVC sheathed or as per specification .
202\\"Test Lead Point TYPE A (POTENTIAL MEASUREMENT) with minimum two cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential meas urement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP ) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 60 0 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, ter mination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techniqu e), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy pa int / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixin g of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sche me, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed , all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. Th e work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directi ons of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
203\\"Test Lead Point TYPE B: (CURRENT MEASUREMENT) with minimum four cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential measu rement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS S : heet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 10 0 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof conceal ed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, t ermination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techni que), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated i n standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fix ing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sc heme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever install ed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & direc tions of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
204Test Lead Point TYPE C (CASED CROSING WITH BARE CASING) with minimum four cables including two cables of 1Cx06 Sq.mm Potential measurement cable & two cables of 1Cx10 Sq.mm armoured anode connection, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion
205Test Lead Point TYPE D (CASED CROSING WITH COATED/PAINTED CASING) with minimum four cables including two cables of 1Cx06 Sq.mm Potential measurement cable & two cables of 1Cx10 Sq.mm armoured anode connection, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection
206\\",,Test Lead Point TYPE E (FOREIGN PIPELINE CROSSING) with minimum four cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential measurement cables & 1Cx25 Sq.mm armoured Bonding Connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directions of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWINGS\\"
207Test Lead Point TYPE F (INSULATING JOINT SCHEME) with minimum four cables including two cables of 1Cx06 Sq.mm armoured Potential measurement cables & two cables of 1Cx25 Sq.mm armoured galvanic anode connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe
208Test Lead Point TYPE H (HT LINE CROSSING) with minimum two cables including 1Cx06 Sq.mm armoured Potential measurement cables & 1Cx25 Sq.mm armoured galvanic anode connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 6 00 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directions of the Site Engineer/Engineer-In-Charge.
209Supply &Installation of 05 KA Polarization cell. It should be utilized in vandal proof areas for passage of induced voltage on the pipeline in the vicinity of AC transmission lines to earth during normal as well as fault conditions. It shall maintain the isolation between Zn anode and pipeline so that CP current shall not be consumed by Zn anode. Polarization cell shall be installed in vandal proof areas in a IP-55 enclosure. Contractor to supply polarization cell with enclosure and necessary material required for making connection arrangement between polarization cell and Zn anode inside enclosure as per requirements of polarization cell manufaturer.
210Supply & Installation of pre-packed Mg Anode (7.6 Kg) with one cable including 1Cx10 Sq.mm Unarmoured cable (with sufficent length) & encapsulation kit for cable connection termination of Anode tail cable in the TLP etc. complete in all respects as per direction o f Engineer-In-Charge.
211Supply & Installation of pre-packed Zinc Anode (40 years design life / Min. 22 Kg) for HT Line crossing with one cable including 1Cx 25 Sq.mm armoured cable (with sufficent length), encapsulation kit termination of Anode tail cable in the TLP etc.
212Supply & Installation of Spark Gap Arrester/Surge Diverter for Insulating Joint complete in all respects as per direction of Engine er-In-Charge including the cost of all labour, materials, tools and tackles etc.
213Supply & Installation of SSD for HT line Crossing as per tender specs/drawings complete in all respects as per direction of Engineer -In-Charge including the cost of all labour, materials, tools and tackles etc.
214Supply & Installation of Zinc Grounding Cell of 20 Kg each for IJ with two cables including 1Cx25 Sq.mm armoured cable (with suffice nt length), encapsulation kit termination of Anode tail cable in the TLP etc.
215MONITORING TEST STATION FOR PSP AFTER COMPLETION OF PIPE LAYING AND TCP WORK
216Monitoring of health of installed TCP including measurement of pipe to soil potential (PSP) reading on monthly basis. The scope of work include collection / measurement of parameters of test stations of PCP and TCP sections and IJ, submission of reports to Owner & PMC as detailed in technical specifications and rectification/repair of defects/abnormalties to keep the system in healthy positio n complete in all respects as per direction of Engineer-In-Charge.
217\\"Notes for TCP items: 1. Any other material & activities not mentioned/covered above, but otherwise required for satisfactory completion/safety of work as defined in tender has to be supplied / done by contractor within quoted price. No extra payment shall be made. 2. The above quantities are tentative and may vary during detailed engineering considerably depending upon site condition, methodolo gy adopted as per site requirement with due approval of Owner / Consultant. 3. The quantity may vary during execution stage and payment shall be made based on the work for the actual quantity executed.\\"
218\\"TELECOMMUNICATION SITE WORK (As per scope of work and Standard Specification of Bid documents)\\"
219Supply and Laying of HDPE Telecom Duct as per specification :-Supply & Laying of single 40mm OD, 6kg/cm2 permanently lubricated HD PE ducts. Factory Acceptance Testing as per specification. (Qty with spares) Supply of spare HDPE accessories Plastic Couplers (PC), End Plugs (EP), Cable Sealing Plugs (CSP), End Caps (EC) etc suitable for supplied Duct , Laying in same pipeline trench direct bur ied or tied along with steel at all crossings (cased or uncased), in all type of soil & terrain, excavation as required, including cleaning and sealing of ducts at the end of laid drum lengths, preparation & Supply of Cable Blowing Pit including sand, jointing o f HDPE conduit, supply of all type of fitting for HDPE telecom duct laying, Testing of HDPE Duct and accessories after laying, prepa ration of report and final drawing & documents as per specification, joint location marking, erection accessories (suitable for min 8 kg/cm2 pressure rating),all co mplete as per specifications provided in the bid document & as per direction of consultant. (This du ct is for future requirement for total length of pipeline as per spec. and drawing ). HDPE duct is to be tied at 2 o-clock position to carrier pipe with string at regular intervals and held with Galvanized clamps or suitable material as decided by client / consult ant.
220Blowing of Optical Fiber Cable : - All activities pertaining to blowing of optical fiber cable in self lubricated HDPE Telecom duct (after testing of drum at site),through CS/ HDPE conduits at crossing, cable sealing, padding, backfilling etc. using all materials required, etc. all complete as per specifications and drawing provided in the bid document & as per direction of consultant.
221Supply and installation of jointing pits, including sand, etc. all complete as per spec., drawing provided in the bid document and the direction of client / consultant.
222Jointing / splicing of optical fiber cable ( 24 Fibers ) including supply and installation of joint markers (RF id Disk type), etc., testing all completed as per specifications & drawing provided in the bid document and direction of consultant.
223Supply & installation of optical splice closer as per specifications & drawing provided in the bid document and direction of client / consultant
224Supply & installation of Fiber termination cabinet as per specifications & drawing provided in the bid document and direction of cl ient / consultant
225Supply & Installation of wall mounted fiber termination box (FMS) as per tender specifications.
226Supply & Installation of Transition pit as per tender specifications.
2274\\" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm
22815 Degree 4\\" NB, Material : API 5L X 52
22922.5 Degree 4\\" NB, Material : API 5L X 52
23030 Degree 4\\" NB, Material : API 5L X 52
23145 Degree 4\\" NB, Material : API 5L X 52
23260 Degree 4\\" NB, Material : API 5L X 52
233Supply of Equal Tee, Rating 300 #
2344\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
235Supply of Reducing Tee, Rating 300 #
23610\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
2378\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
2386\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
2394\\" x 2\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
240Flanges (WNRF), Rating 300 #
2414\\" (Material : ASTM A 694 F 52) Flanges (WNRF)
242Blind Flanges (RF), Rating 300 #
2434\\" (Material : ASTM A 694 F 52) BLIND FLANGE
244Insulating Joints as per tender specs, Rating 300 #
2454\\" Insulating Joints
246Supply of CS Concetric Reducer, 300#
2478\\"X4\\" A234 Gr. WPB, BW Sch. 80 Concetric Reducer
2486\\"X4\\" A234 Gr. WPB, BW Sch. 80 Concetric Reducer
249Supply of CS End caps
2504\\" NB End caps A234 Gr. WPB, BW Sch. 80
251Steel pipeline laying in AURANGABAD GA
252INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL)
253Specified NB (inch) x Wall thickness (mm) - Material of Construction
2544\\" x 6.4 mm - API 5L X 52 ( HFW / SMLS )
255\\"PIPELINE LAYING LIAISONING AND GETTING PERMISSIONS FROM THE STATUTORY AUTHORITIES
256\\"SUPPLY & INSTALLATION OF CASING PIPE ALONG WITH MAIN CARRIER PIPELINE
25710\\" NB Carbon steel casing pipe (Augur boring & Jacking Method / Moling/HDD) - For 4\\" Mainline Carrier Pipe
258\\"INSTALLATION OF CARRIER PIPE (CARBON STEEL) BY TRENCHLESS METHOD WITHOUT CASING.\\"
259Any other activities not mentioned/ covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works
260Installation of 4\\" NB PE 4 inch CS conduit as required by HDD
261Installation of 4\\" NB PE Coated Steel pipe alongwith 4 inch CS conduit as required by HDD in HARD ROCK USING DIAMOND CUTTER
262Installation of 4\\" NB PE Coated Steel pipe without any casing by Moiling
263\\"INSTALLATION OF CARRIER PIPE BY HDD METHOD (SHALLOW HDD OR HDD ALONG THE ROAD WITHOUT CROSSING) 'Execution of road/other crossing by Shallow Horizontal Directional Drilling (HDD) technique OR laying by HDD method along the road without any crossing at a required depth as per site condition including mobilization & de-mobilization at site(s), supply of all ma terials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as p er all provisions of the contract document complete in all respect as per the instructions of the Engineer – in – charge /Site engin eer. 'Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspect ion of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage ar ea required thereof till the pipes are installed in permanent position. 'Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangemen t for pipeline stringing, launching etc. 'Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating includ ing defects/ damages occurring during transportation and handling. 'String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radi ography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiogra phs, repair of defects in the welds and re-testing etc. 'Carrying out pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of d efects and retesting etc. 'Coating of the field joints of the pipe string to be installed by shallow HDD method with DIRAX heat shrink sleeves of approved mak e used for HDD crossings. 'Repair of all coating damages in the pipe section to be laid by shallow HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of approved make. \\"
264\\"Supply & fixing of easy to install heat shrinkable duct end caps for HDPE duct for OFC (wherever OFC has to be laid along with the carrier pipeline). 'Installation of the pipeline and OFC conduit as a bundle crossing below the Road/ other utility horizontally by shallow HDD operati on to the correct profile as per the approved drawings in a pre-reamed hole of appropriate size. 'Carrying out post-installation coating survey as per approved procedure. 'Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. 'All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note: 1. Payment shall be based on the actual length (Length between tie-in joints) of pipeline laid by Shallow HDD. Exact location of ti e-in shall be approved by Owner/ Owner's Representative. 3. The length of Shallow HDD mentioned is tentative and may vary to the considerable extent, depending upon requirements as per site conditions and shall be decided by Engineer-in-Charge. 4. Payment for the length of final tie-in carrier pipeline string with mainline laid by Shallow HDD are inclusive in this above item rate. No separate payment shall be made under other clauses mentioned elsewhere. 4. The supply and laying of HDPE duct is included in this SOR item and will not be paid separatly. 6. This item shall be executed as per specific instruction of Engineer-In-Charge.\\"
265Installation of 4\\" NB PE Coated Steel pipe along with 2 Nos HDPE Duct as required by Shallow HDD method
266\\"INSTALLATION OF SV STATIONS All works for installation of all underground & above ground piping at all elevations and below ground at all depth for Sectionalizi ng Valve Station with / without future tap-off in the same valve chamber as per P & ID & GAD in all type of terrains and soils incl uding \\"\\"Receiving and taking over\\"\\" as defined in the specifications, handling, loading, transportation and unloading of all Owner s upplied materials i.e. extended stem, butt welded, sectionalizing ball valve, other types of valves, line pipes for mainline from Ow ner's designated place(s) of issue to work site, Supply of pipes, fittings & valves for piping of size below 4\\"\\" dia, supply of all consumables, materials, manpower and carrying out all mechanical works of underground and above ground piping including fabrica tion, welding, non-destructive testing of welds by radiography or Utrasoninc Testing in case radiography is not possible, weld repa irs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testing, pneumatic seat & seal te st as per API 6D, cutting of mainline and beveling (if required), tie-in of valve assembly, including radiography of tie-in joints a nd Ultrasoninc testing of Golden joints, corrosion, coating and external painting as required. Installation of instruments like pressure/ temperature instruments/ gauges, provision for tubing to the actuator in future, obtainin g all statutory clearances, approvals and permissions for the works (wherever required). Excavation in all types of soil including soft / hard / rocky surfaces, providing 200 mm thk PCC for valve base support, backfilling and compaction with approved soil for installation of pipes and fittings, etc including sand padding all around the valves in SV st ation, pipe supports and fencing would be paid against separate SOR s ), painting, finishing, clean-up and restoration of site; prep aration of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisio ns of Contract document and instructions of Engineer-in- charge. Note: 1. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor with in the rate quoted. 2. This work is exclusive of all works associated with main pipeline covered under SOR item specified as INSTALLATION OF CARRIER PIP E BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. All civil / structural works including area fencing and gate, pipe supports, valve chamber shall be paid separately as per unit r ate provided elsewhere in the SOR. 4. 4\\"\\" and above (fittings & flanges etc. ), material supply is also in the contractor scope. It shall be be paid separately under Supply item provided elsewhere in the SOR.\\"
267SV STATION WITH VENT WITHOUT BY-PASS LINE AND WITH / WITHOUT FUTURE TAP-OFF
2684\\" NB SV STATION WITH VENT
269SV STATION WITH VENT WITH BY-PASS LINE AND WITH / WITHOUT FUTURE TAP-OFF
270\\"COMPLETE WORKS FOR TAP-OFF POINTS (NO
271Works at Future Connections: Complete wo
2724\\" x 4\\" for newly laid line Works at Future Connections
273\\"PURGING & INERTIZATION OF PIPELINE - INCLUDING SUPPLY OF NITROGEN Purging and inertization of pipeline section between the two isolation valves with nitrogen to make the pipeline section free from o xygen including supply of required quantity of nitrogen and all equipments, tools and tackles, manpower etc. required for the works and as per instruction of engineer in charge. Complete with necessary regulator, hoses, pressure guage, connections with tools and t ackles. Submission of purging plan for approval before actual work and complete assistance for purging. By filling and pressurizing with nitrogen upto a pressure of 2 bar(g). Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator , hoses, connections with tools and tackles instruction of EIC. Payment shall be made on number of nitrogen cylinders used on actual basis. Note: 1. Contractor shall be responsible for maintaing the pressure up to 2 bar(g) till commissioning. However, Additional nitrogen fillin g shall be paid as per SOR mentioned immediate above for maintaing the presurre up to 2 barg on actual basis.\\"
2744\\" NB PURGING & INERTIZATION OF PIPELINE
275Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator, hoses, connections with tools and tackles instruction of EIC.
276\\"PIPELINE LAYING / INSTALLATION OF ABOVE GROUND PIPELINE (WHEREVER REQUIRED AT CNG/DRS/MRS STATIONS & CONSUMER ENDS ETC.)\\"
277WELDING OF PIPES WITH PIPE / FITTINGS / VALVES : - Receiving and taking over of all free issue materials from company’s designated place of issue, handling including lifting, transpor tation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site fo r field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings etc. to match with grinding the edges of pipes, fittings etc. to match with the matching edges of uneven / different thickness wherever required fit - up bending, p reheating wherever required, welding etc. pipe fittings like elbows, tees, reducers, weldolets, sockolets, vent and drain point conn ection etc. including providing stub-in connection, fabricated fittings and reinforcement pads etc. as required. Carrying out Non-de structive testing as per specification & instruction of EIC. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contract or to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractor scope. It shall be be paid separately under Suppl y item provided elsewhere in the SOR on actual quantity basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor within the rate quoted. These items shall not be separately measured and paid.\\"
2784\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
2792\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
2801.5\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
2811\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
2820.75\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
283WELDING OF PIPES WITH FLANGES Receiving and taking over of all free issue materials from OWNER’s designated place of issue, handling including lifting, transporta tion from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, flanges etc to match with the matching ed ges of uneven / different thickness, preheating wherever required, welding etc. including supply and fixing of all types of gaskets (including gaskets for RTJ flanges), bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instr uction of EIC. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contract or to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractor scope. It shall be be paid separately under Suppl y item provided elsewhere in the SOR on actual quantity basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor within the rate quoted. These items shall not be separately measured and paid.\\"
2844\\" NB WELDING OF PIPES WITH FLANGES
2852\\" NB WELDING OF PIPES WITH FLANGES
2861.5\\" NB WELDING OF PIPES WITH FLANGES
2871\\" NB WELDING OF PIPES WITH FLANGES
2880.75\\" NB WELDING OF PIPES WITH FLANGES
289\\"ERECTION & TESTING Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon steel piping and fitting s of all sizes and ratings including supply & installation of all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind flanges, spectacle blind flanges, valves, pipes of sizes below 4” NB and of all ratings including supply of all consumables, equipment, manpower and other resources and execution of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative and as per all provisions of the contract document. Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with equipment nozzle , aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, fl anges blind flange, spectacle blind flanges, branch connection / tapping, vents and drains, required for process and hydro testing, tapping for pressure gauges thermowells sample connections, etc. Painting of entire system (including all pipes and accessories) as per specification, including supply of approved paints and primer s, preparation of surface and application of primer and paint, identification lettering / numbering, color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by OWNER and providing scaffolding for a ll heights etc. Cleaning and flushing by water/ compressed air, testing of the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air / other methods approved by OWNER. Cleaning and flushing by water / compressed air, testing of the system including hydrostatic, pneumatic and any other type of testin g as specified, draining, drying by compressed air/ other methods as approved by Owner. Completion of all such work in all respect as per scope of work and as per drawings specifications and instructions of the OWNER and keeping in the system ready in all respects for further commissioning and start up. Hooking up with other system piping at battery limit. Preparation of isometric, fabrication drawings. Bill of materials as per specifications, drawings and instruction of Owner / Owner’ s Representative. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contractor to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractors scope.
2904\\" NB ERECTION & TESTING
2912\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
2921.5\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
2931\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
2940.75\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
295\\"SUPPLY & INSTALLATION OF SS PRESSURE GAUGE Supply of SS pressure gauges as per data sheet and drawing enclosed in tender and Installation of pressure guages and their accessor ies inclusive of supply of necessary piping materials and tubings along with all necessary valves and fittings, fabrication and inst allation of impulse lines / mainfolds and hydrulic testing and calibration as per installation standard.\\"
296Supply & installation of SS pressure gauge (Make - as per recommended vendor list) as per data sheet attached in the tender
297PIPE SUPPORTS & STRUCTURES
298Supply, fabrication and erection of all types of pipe supports of MS material like clamps, saddle, guide stops, cradles, turn buckles, anchors, T-posts; stockade / trestle and pipe bridge for overhead piping; frames for canopy, approach ladders and platforms, cro ssover, cable tray supports etc. including painting suitable for highly corrosive area as per specification labor and supervision & complete work as per specifications and instruction of Engineer in charge (Bolts, nuts, washers, U - clamps etc. for supporting shal l be supplied by the contractor within the rates quoted. These items will not be measured and paid separately) this work is to be complete in all respect as per scope of work.
299\\"STRUCTURAL WORKS (FENCING & GATE) Supply and erection of single leaf mild steel gate 2.5 M high with mesh up to 2.0 M height and barbed wire fencing of 0.5 M height a nd 2.0 M wide complete in all respect including painting as per specification on all MS items, all works as per specification and dr awings including foundations and RCC.\\"
300S \\"Supply of all materials, fabrication and erection of chain link fencing 2.5 M high with mesh up to 2.0 M height and barbed wire fen cing complete in all respect including painting as per TS on all MS items, all works as per specification and drawings including fou ndations and RCC. Note: 1. Rate include cost of all labor, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement including sulphate resistant cement for sub structures, R/F steel, inserts, bolts, conduits, bitumen, other minor construction mater ials, shuttering, stinging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and sundry works.\\"
301\\"PERMANENT MARKER Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of foundation, pedestals and grouting with concrete , clearing, supply and application of approved color and quality of primer and paint (powder coated), stencil letter cutting for num bers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner / Owner’s Representative.\\"
302RCC route marker as per approved drawing
303Pipeline Warning markers/ Direction markers/kilometer marker with Post & foundations as per drawing. It shall be powder coated only & before installation take approval from the EIC.
304\\"Leak / Burst (Attributable to Company) All works for locating major leak / burst (occurred during hydrostatic testing) including necessary repairing / replacing defective pipelength, including cutting and removing out defective pipes, pretesting of replacement pipe and welding into mainline, NDT of wel ds and re-bevelled area, repair and re-testing of defective welds, coating of welded joints, clean-up, retesting the pipeline includ ing providing all necessary equipment's, labour, materials, consumables and inputs otherthan Owner supplied materials and performing all works as per drawings, specifications enclosed with the Contract and directions of Engineer-in-Charge. Note: 1. This rate is applicable for manufacturing defects in Company supplied material only.\\"
3054\\" NB Leak / Burst REPAIR
306\\"CONTINUOUS CONCRETE COATING (FOR CS PIPES) Supply of all consumables, materials and application of 50 mm thk. continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-20 for below specified Line Pipe size and field joints thereof in all areas of work wherever required as per sit e condition and performing all works as per specification on the line pipe for following sizes.\\"
307Specified NB 4\\" x 6.4 mm W.T. x 50 mm Concrete Coating
308\\"CONSTRUCTION OF RCC Construction and handing over of RCC Valve Pit of different size (internal dimension) as per technical specification and direction o f engineer-in-charge, complete in all respect. Scope of work shall be as per approved drawing. All civil works including supply of all material, excavation of pit, piping & valve supports including all PCC and RCC/ Brick works for valves pit, pedestals with insert plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local flooding of area, as per specifica tion enclosed and instruction of Engineer-in-Charge.\\"
309RCC Chamber - (Size - 2 m x 1.5 m)
310RCC Chamber - (Size - 2.5 m x 2.2 m)
311RCC Chamber - (Size - 3 m x 2.5 m)
312\\"RESTORATION OF ROADS Restoration of asphalt / concrete / red stone roads / pavement/ pavor block including compaction of soil, to original condition as p er requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness.\\"
313Restoration of Asphalt road up to 15 cm thickness
314Restoration of Asphalt road beyond 15 cm up to 20 cm thickness
315Restoration of RCC Concrete road up to 15 cm thickness
316Restoration of red stone road / footpath / pavement up to 4 inch thickness
317Providing and laying PCC (1:2:4) as per technical specifications & instruction of Engineer in charge. (Aggregate size 20 mm down)
318Providing and laying PCC (1:4:8) as per technical specifications & instruction of Engineer in charge. (Aggregate size 40 mm down)
319\\"RCC Providing and Laying reinforced cement concrete of grade M -25 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals etc. at all depths & heights including excavation shaffolding, shuttering, reinforcement steel ( FE 500D), all labour, materials, tools & tackles etc as per the instruction of Engineer in charge.\\"
320\\"Temporary Cathodic Protection: Design, Detailed Engineering, Survey, Supply, Installation, Testing and commissioning & Monitoring of the temporary cathodic protect ion [TCP] system using galvanic anodes to protect the external surface of the entire steel grid network from, against soil- side corrosion for minimum 2 year or till commissioning of permanent CP system whichever is later. All work shall b e carried out conforming to the Scope of work, Design Basis, Data Sheets, specification, standard and approved vendor list and p rovisions of GCC, SCC including Technical specifications,OWNER/ CONSULTANT approved survey report/design package, including all mate rials, equipments, consumables, start up/commissioning spares etc. complete in all respects including transportation, storage of mat erials at site, manpower, in line with direction of Engineer In-charge.\\"
321Soil Resistivity (At every 1000 meter), Soil Ionic & Microbial Loading (At every 5 Km and wherever Soil variation) and Interfering e lements surveys from pipeline ROW.
322Supply, installation, Testing & Commissioning of Test lead Points (TLP) including weather proof Test Lead Box as specified in specif ication with backlite strip, bolt terminals, 4” dia heavy duty pipe at top end to fit the test lead box and base plate welded at the bottom including MS bend for concrete Base, Bend, Cables, pipe to cable connection, Epoxy Encapsulation & Miscellaneous such as con nectors, Excavation and backfilling trenches for cable laying & Pin Brazing etc. complete in all respects. The work shall include su pply & fixing of a non corrosive name plate containing the details like KM location, identification, TLP No, Direction of flow, conn ection scheme, type etc., on the side of Top box including the cost of all labour, materials, tools & tackles etc. cables shall be a nnealed high conductivity, tinned, stranded copper conductor, XLPE insulated, 650/1100 V grade, PVC sheathed or as per specification .
323\\"Test Lead Point TYPE A (POTENTIAL MEASUREMENT) with minimum two cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential meas urement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP ) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 60 0 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, ter mination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techniqu e), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy pa int / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixin g of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sche me, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed , all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. Th e work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directi ons of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
324\\"Test Lead Point TYPE B: (CURRENT MEASUREMENT) with minimum four cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential measu rement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS S : heet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 10 0 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof conceal ed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, t ermination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techni que), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated i n standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fix ing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sc heme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever install ed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & direc tions of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
325Test Lead Point TYPE C (CASED CROSING WITH BARE CASING) with minimum four cables including two cables of 1Cx06 Sq.mm Potential measurement cable & two cables of 1Cx10 Sq.mm armoured anode connection, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion
326Test Lead Point TYPE D (CASED CROSING WITH COATED/PAINTED CASING) with minimum four cables including two cables of 1Cx06 Sq.mm Potential measurement cable & two cables of 1Cx10 Sq.mm armoured anode connection, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection
327\\",,Test Lead Point TYPE E (FOREIGN PIPELINE CROSSING) with minimum four cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential measurement cables & 1Cx25 Sq.mm armoured Bonding Connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directions of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWINGS\\"
328Test Lead Point TYPE F (INSULATING JOINT SCHEME) with minimum four cables including two cables of 1Cx06 Sq.mm armoured Potential measurement cables & two cables of 1Cx25 Sq.mm armoured galvanic anode connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe
329Test Lead Point TYPE H (HT LINE CROSSING) with minimum two cables including 1Cx06 Sq.mm armoured Potential measurement cables & 1Cx25 Sq.mm armoured galvanic anode connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directions of the Site Engineer/Engineer-In-Charge.
330Supply &Installation of 05 KA Polarization cell. It should be utilized in vandal proof areas for passage of induced voltage on the pipeline in the vicinity of AC transmission lines to earth during normal as well as fault conditions. It shall maintain the isolation between Zn anode and pipeline so that CP current shall not be consumed by Zn anode. Polarization cell shall be installed in vandal proof areas in a IP-55 enclosure. Contractor to supply polarization cell with enclosure and necessary material required for making connection arrangement between polarization cell and Zn anode inside enclosure as per requirements of polarization cell manufaturer.
331Supply & Installation of pre-packed Mg Anode (7.6 Kg) with one cable including 1Cx10 Sq.mm Unarmoured cable (with sufficent length) & encapsulation kit for cable connection termination of Anode tail cable in the TLP etc. complete in all respects as per direction o f Engineer-In-Charge.
332Supply & Installation of pre-packed Zinc Anode (40 years design life / Min. 22 Kg) for HT Line crossing with one cable including 1Cx 25 Sq.mm armoured cable (with sufficent length), encapsulation kit termination of Anode tail cable in the TLP etc.
333Supply & Installation of Spark Gap Arrester/Surge Diverter for Insulating Joint complete in all respects as per direction of Engine er-In-Charge including the cost of all labour, materials, tools and tackles etc.
334Supply & Installation of SSD for HT line Crossing as per tender specs/drawings complete in all respects as per direction of Engineer -In-Charge including the cost of all labour, materials, tools and tackles etc.
335Supply & Installation of Zinc Grounding Cell of 20 Kg each for IJ with two cables including 1Cx25 Sq.mm armoured cable (with suffice nt length), encapsulation kit termination of Anode tail cable in the TLP etc.
336MONITORING TEST STATION FOR PSP AFTER COMPLETION OF PIPE LAYING AND TCP WORK
337Monitoring of health of installed TCP including measurement of pipe to soil potential (PSP) reading on monthly basis. The scope of work include collection / measurement of parameters of test stations of PCP and TCP sections and IJ, submission of reports to Owner & PMC as detailed in technical specifications and rectification/repair of defects/abnormalties to keep the system in healthy positio n complete in all respects as per direction of Engineer-In-Charge.
338\\"Notes for TCP items: 1. Any other material & activities not mentioned/covered above, but otherwise required for satisfactory completion/safety of work as defined in tender has to be supplied / done by contractor within quoted price. No extra payment shall be made. 2. The above quantities are tentative and may vary during detailed engineering considerably depending upon site condition, methodolo gy adopted as per site requirement with due approval of Owner / Consultant. 3. The quantity may vary during execution stage and payment shall be made based on the work for the actual quantity executed.\\"
339\\"TELECOMMUNICATION SITE WORK (As per scope of work and Standard Specification of Bid documents)\\"
340Supply and Laying of HDPE Telecom Duct as per specification :-Supply & Laying of single 40mm OD, 6kg/cm2 permanently lubricated HD PE ducts. Factory Acceptance Testing as per specification. (Qty with spares) Supply of spare HDPE accessories Plastic Couplers (PC), End Plugs (EP), Cable Sealing Plugs (CSP), End Caps (EC) etc suitable for supplied Duct , Laying in same pipeline trench direct bur ied or tied along with steel at all crossings (cased or uncased), in all type of soil & terrain, excavation as required, including cleaning and sealing of ducts at the end of laid drum lengths, preparation & Supply of Cable Blowing Pit including sand, jointing o f HDPE conduit, supply of all type of fitting for HDPE telecom duct laying, Testing of HDPE Duct and accessories after laying, prepa ration of report and final drawing & documents as per specification, joint location marking, erection accessories (suitable for min 8 kg/cm2 pressure rating),all c omplete as per specifications provided in the bid document & as per direction of consultant. (This du ct is for future requirement for total length of pipeline as per spec. and drawing ). HDPE duct is to be tied at 2 o-clock position to carrier pipe with string at regular intervals and held with Galvanized clamps or suitable material as decided by client / consult ant.
341Blowing of Optical Fiber Cable : - All activities pertaining to blowing of optical fiber cable in self lubricated HDPE Telecom duct (after testing of drum at site),through CS/ HDPE conduits at crossing, cable sealing, padding, backfilling etc. using all materials required, etc. all complete as per specifications and drawing provided in the bid document & as per direction of consultant.
342Supply and installation of jointing pits, including sand, etc. all complete as per spec., drawing provided in the bid document and the direction of client / consultant.
343Jointing / splicing of optical fiber cable ( 24 Fibers ) including supply and installation of joint markers (RF id Disk type), etc., testing all completed as per specifications & drawing provided in the bid document and direction of consultant.
344Supply & installation of optical splice closer as per specifications & drawing provided in the bid document and direction of client / consultant
345Supply & installation of Fiber termination cabinet as per specifications & drawing provided in the bid document and direction of cl ient / consultant
346Supply & Installation of wall mounted fiber termination box (FMS) as per tender specifications.
347Supply & Installation of Transition pit as per tender specifications.
348SUPPLY OF LONG RADIUS BENDS (R = 3D), RATING 300# Supply & fabrication of 3D bends as per PMS, specification requirement, data sheet, manufacturer, testing of fabricated bend & transportation of fabricated bend to site for installation of sizes specified below. All the Fabrication and Testing shall be as per specification. The butt-weld end thickness of the bend shall meet the thickness of connected line pipe as specified below:
3494\\" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm
3504\\" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm
35130 Degree 4\\" NB, Material : API 5L X 52
35260 Degree 4\\" NB, Material : API 5L X 52
353Supply of Equal Tee, Rating 300 #
3544\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
355Supply of Reducing Tee, Rating 300 #
3566\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
3574\\" x 2\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
358Flanges (WNRF), Rating 300 #
3594\\" (Material : ASTM A 694 F 52) Flanges (WNRF)
360Blind Flanges (RF), Rating 300 #
3614\\" (Material : ASTM A 694 F 52) BLIND FLANGE
362Insulating Joints as per tender specs, Rating 300 #
3634\\" Insulating Joints
364Supply of CS End caps
3654\\" NB End caps A234 Gr. WPB, BW Sch. 80
366Steel pipeline laying in BHAGALPUR GA
367INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL)
368Specified NB (inch) x Wall thickness (mm) - Material of Construction
3694\\" x 6.4 mm - API 5L X 52 ( HFW / SMLS )
370\\"PIPELINE LAYING LIAISONING AND GETTING PERMISSIONS FROM THE STATUTORY AUTHORITIES
371\\"SUPPLY & INSTALLATION OF CASING PIPE ALONG WITH MAIN CARRIER PIPELINE
37210\\" NB Carbon steel casing pipe (Augu
373\\"INSTALLATION OF CARRIER PIPE (CARBON STEEL) BY TRENCHLESS METHOD WITHOUT CASING.\\"
374Any other activities not mentioned/ covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works
375Installation of 4\\" NB PE 4 inch CS conduit as required by HDD
376Installation of 4\\" NB PE Coated Steel pipe alongwith 4 inch CS conduit as required by HDD in HARD ROCK USING DIAMOND CUTTER
377Installation of 4\\" NB PE Coated Steel pipe without any casing by Moiling
378\\"INSTALLATION OF CARRIER PIPE BY HDD METHOD (SHALLOW HDD OR HDD ALONG THE ROAD WITHOUT CROSSING) 'Execution of road/other crossing by Shallow Horizontal Directional Drilling (HDD) technique OR laying by HDD method along the road without any crossing at a required depth as per site condition including mobilization & de-mobilization at site(s), supply of all ma terials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as p er all provisions of the contract document complete in all respect as per the instructions of the Engineer – in – charge /Site engin eer. 'Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspect ion of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage ar ea required thereof till the pipes are installed in permanent position. 'Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangemen t for pipeline stringing, launching etc. 'Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating includ ing defects/ damages occurring during transportation and handling. 'String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radi ography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiogra phs, repair of defects in the welds and re-testing etc. 'Carrying out pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of d efects and retesting etc. 'Coating of the field joints of the pipe string to be installed by shallow HDD method with DIRAX heat shrink sleeves of approved mak e used for HDD crossings. 'Repair of all coating damages in the pipe section to be laid by shallow HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of approved make. \\"
379\\"Supply & fixing of easy to install heat shrinkable duct end caps for HDPE duct for OFC (wherever OFC has to be laid along with the carrier pipeline). 'Installation of the pipeline and OFC conduit as a bundle crossing below the Road/ other utility horizontally by shallow HDD operati on to the correct profile as per the approved drawings in a pre-reamed hole of appropriate size. 'Carrying out post-installation coating survey as per approved procedure. 'Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. 'All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note: 1. Payment shall be based on the actual length (Length between tie-in joints) of pipeline laid by Shallow HDD. Exact location of ti e-in shall be approved by Owner/ Owner's Representative. 3. The length of Shallow HDD mentioned is tentative and may vary to the considerable extent, depending upon requirements as per site conditions and shall be decided by Engineer-in-Charge. 4. Payment for the length of final tie-in carrier pipeline string with mainline laid by Shallow HDD are inclusive in this above item rate. No separate payment shall be made under other clauses mentioned elsewhere. 4. The supply and laying of HDPE duct is included in this SOR item and will not be paid separatly. 6. This item shall be executed as per specific instruction of Engineer-In-Charge.\\"
380Installation of 4\\" NB PE Coated Steel pipe along with 2 Nos HDPE Duct as required by Shallow HDD method
381INSTALLATION OF SV STATIONS All works for installation of all underground & above ground piping at all elevations and below ground at all depth for Sectionalizi ng Valve Station with / without future tap-off in the same valve chamber as per P & ID & GAD in all type of terrains and soils incl uding \\"\\"Receiving and taking over\\"\\" as defined in the specifications, handling, loading, transportation and unloading of all Owner s upplied materials i.e. extended stem, butt welded, sectionalizing ball valve, other types of valves, line pipes for mainline from Ow ner's designated place(s) of issue to work site, Supply of pipes, fittings & valves for piping of size below 4\\"\\" dia, supply of all consumables, materials, manpower and carrying out all mechanical works of underground and above ground piping including fabrica tion, welding, non-destructive testing of welds by radiography or Utrasoninc Testing in case radiography is not possible, weld repa irs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testing, pneumatic seat & seal te st as per API 6D, cutting of mainline and beveling (if required), tie-in of valve assembly, including radiography of tie-in joints a nd Ultrasoninc testing of Golden joints, corrosion, coating and external painting as required. Installation of instruments like pressure/ temperature instruments/ gauges, provision for tubing to the actuator in future, obtainin g all statutory clearances, approvals and permissions for the works (wherever required). Excavation in all types of soil including soft / hard / rocky surfaces, providing 200 mm thk PCC for valve base support, backfilling and compaction with approved soil for installation of pipes and fittings, etc including sand padding all around the valves in SV st ation, pipe supports and fencing would be paid against separate SOR s ), painting, finishing, clean-up and restoration of site; prep aration of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisio ns of Contract document and instructions of Engineer-in- charge. Note: 1. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor with in the rate quoted. 2. This work is exclusive of all works associated with main pipeline covered under SOR item specified as INSTALLATION OF CARRIER PIP E BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. All civil / structural works including area fencing and gate, pipe supports, valve chamber shall be paid separately as per unit r ate provided elsewhere in the SOR. 4. 4\\"\\" and above (fittings & flanges etc. ), material supply is also in the contractor scope. It shall be be paid separately under Supply item provided elsewhere in the SOR.\\"
382SV STATION WITH VENT WITHOUT BY-PASS LINE AND WITH / WITHOUT FUTURE TAP-OFF
3834\\" NB SV STATION WITH VENT
384SV STATION WITH VENT WITH BY-PASS LINE AND WITH / WITHOUT FUTURE TAP-OFF
3854\\" NB SV STATION WITH VENT WITH BY-PASS LINE
386\\"COMPLETE WORKS FOR TAP-OFF POINTS (NOT PART OF SV STATION COMMON VALVE CHABMBER)\\"
387\\" \\"\\"Works at Future Connections: Complete works of design, engineering, installation of all piping, valves, fittings at all depths inside the pit in all types of te rrains and soils including transportation, handling of Owner supplied material from Owner's designated issue point(s) to work site, supply of Contractor's supplied materials to work site(s), all mechanical works including fabrication, welding, non destructive tes ting of welds, weld repairs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testin g, cutting of mainline and beveling (if required), tie-in of valve assembly, including radiography of tie-in joints, corrosion, coating and external painting as required. All civil works including excavation of pit, piping supports including all PCC and RCC works for pedestals with insert plates as re quired, construction of valve chamber including with supply of all material and finishing, clean up and restoration of site , filling and grading of area around valve station for avoiding any local flooding of area and as per specificati on and instructions of Owner/Owner's representative. Preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other prov isions of Contract document and instructions of Engineer-in- charge. Note: 1. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor with in the rate quoted. 2. This work is exclusive of all works associated with main pipeline covered under SOR item specified as INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. All civil / structural works including area fencing and gate, pipe supports, valve chamber shall be paid separately as per unit r ate provided elsewhere in the SOR. 4. 4\\"\\"\\"\\" and above (fittings & flanges etc. ), material supply is also in the contractor scope. It shall be be paid separately under Supply item provided elsewhere in the SOR.\\"\\"\\"
3884\\" x 4\\" for newly laid line Works at Future Connections
389PURGING & INERTIZATION OF PIPELINE - INCLUDING SUPPLY OF NITROGEN Purging and inertization of pipeline section between the two isolation valves with nitrogen to make the pipeline section free from o xygen including supply of required quantity of nitrogen and all equipments, tools and tackles, manpower etc. required for the works and as per instruction of engineer in charge. Complete with necessary regulator, hoses, pressure guage, connections with tools and t ackles. Submission of purging plan for approval before actual work and complete assistance for purging. By filling and pressurizing with nitrogen upto a pressure of 2 bar(g). Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator , hoses, connections with tools and tackles instruction of EIC. Payment shall be made on number of nitrogen cylinders used on actual basis. Note: 1. Contractor shall be responsible for maintaing the pressure up to 2 bar(g) till commissioning. However, Additional nitrogen fillin g shall be paid as per SOR mentioned immediate above for maintaing the presurre up to 2 barg on actual basis.\\"
3904\\" NB PURGING & INERTIZATION OF PIPELINE
391Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator, hoses, connections with tools and tackles instruction of EIC.
392\\"PIPELINE LAYING / INSTALLATION OF ABOVE GROUND PIPELINE (WHEREVER REQUIRED AT CNG/DRS/MRS STATIONS & CONSUMER ENDS ETC.)\\"
393\\"\\"WELDING OF PIPES WITH PIPE / FITTINGS / VALVES : - Receiving and taking over of all free issue materials from company’s designated place of issue, handling including lifting, transpor tation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site fo r field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings etc. to match with grinding the edges of pipes, fittings etc. to match with the matching edges of uneven / different thickness wherever required fit - up bending, p reheating wherever required, welding etc. pipe fittings like elbows, tees, reducers, weldolets, sockolets, vent and drain point conn ection etc. including providing stub-in connection, fabricated fittings and reinforcement pads etc. as required. Carrying out Non-de structive testing as per specification & instruction of EIC. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contract or to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractor scope. It shall be be paid separately under Suppl y item provided elsewhere in the SOR on actual quantity basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor within the rate quoted. These items shall not be separately measured and paid.\\"
3944\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
3952\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
3961.5\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
3971\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
3980.75\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
399WELDING OF PIPES WITH FLANGES Receiving and taking over of all free issue materials from OWNER’s designated place of issue, handling including lifting, transporta tion from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, flanges etc to match with the matching ed ges of uneven / different thickness, preheating wherever required, welding etc. including supply and fixing of all types of gaskets (including gaskets for RTJ flanges), bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instr uction of EIC. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contract or to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractor scope. It shall be be paid separately under Suppl y item provided elsewhere in the SOR on actual quantity basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor within the rate quoted. These items shall not be separately measured and paid.\\"
4004\\" NB WELDING OF PIPES WITH FLANGES
4012\\" NB WELDING OF PIPES WITH FLANGES
4021.5\\" NB WELDING OF PIPES WITH FLANGES
4031\\" NB WELDING OF PIPES WITH FLANGES
4040.75\\" NB WELDING OF PIPES WITH FLANGES
405ERECTION & TESTING Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon steel piping and fitting s of all sizes and ratings including supply & installation of all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind flanges, spectacle blind flanges, valves, pipes of sizes below 4” NB and of all ratings including supply of all consumables, equipment, manpower and other resources and execution of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative and as per all provisions of the contract document. Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with equipment nozzle , aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, fl anges blind flange, spectacle blind flanges, branch connection / tapping, vents and drains, required for process and hydro testing, tapping for pressure gauges thermowells sample connections, etc. Painting of entire system (including all pipes and accessories) as per specification, including supply of approved paints and primer s, preparation of surface and application of primer and paint, identification lettering / numbering, color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by OWNER and providing scaffolding for a ll heights etc. Cleaning and flushing by water/ compressed air, testing of the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air / other methods approved by OWNER. Cleaning and flushing by water / compressed air, testing of the system including hydrostatic, pneumatic and any other type of testin g as specified, draining, drying by compressed air/ other methods as approved by Owner. Completion of all such work in all respect as per scope of work and as per drawings specifications and instructions of the OWNER and keeping in the system ready in all respects for further commissioning and start up. Hooking up with other system piping at battery limit. Preparation of isometric, fabrication drawings. Bill of materials as per specifications, drawings and instruction of Owner / Owner’ s Representative. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contractor to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractors scope.
4064\\" NB ERECTION & TESTING
4072\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
4081.5\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
4091\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
4100.75\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
411\\"SUPPLY & INSTALLATION OF SS PRESSURE GAUGE Supply of SS pressure gauges as per data sheet and drawing enclosed in tender and Installation of pressure guages and their accessor ies inclusive of supply of necessary piping materials and tubings along with all necessary valves and fittings, fabrication and inst allation of impulse lines / mainfolds and hydrulic testing and calibration as per installation standard.\\"
412Supply & installation of SS pressure gauge (Make - as per recommended vendor list) as per data sheet attached in the tender
413PIPE SUPPORTS & STRUCTURES
414Supply, fabrication and erection of all types of pipe supports of MS material like clamps, saddle, guide stops, cradles, turn buckles, anchors, T-posts; stockade / trestle and pipe bridge for overhead piping; frames for canopy, approach ladders and platforms, cro ssover, cable tray supports etc. including painting suitable for highly corrosive area as per specification labor and supervision & complete work as per specifications and instruction of Engineer in charge (Bolts, nuts, washers, U - clamps etc. for supporting shal l be supplied by the contractor within the rates quoted. These items will not be measured and paid separately) this work is to be complete in all respect as per scope of work.
415\\"STRUCTURAL WORKS (FENCING & GATE) Supply and erection of single leaf mild steel gate 2.5 M high with mesh up to 2.0 M height and barbed wire fencing of 0.5 M height a nd 2.0 M wide complete in all respect including painting as per specification on all MS items, all works as per specification and dr awings including foundations and RCC.\\"
416Supply and erection of double leaf mild steel gate 2.5 M high with mesh up to 2.0 M height and barbed wire fencing 0.5 M height and 4.0 M wide complete in all respect including painting as per TS on all MS items, all works as per specification and drawings includ ing foundations and RCC.
417\\"PERMANENT MARKER Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of foundation, pedestals and grouting with concrete , clearing, supply and application of approved color and quality of primer and paint (powder coated), stencil letter cutting for num bers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner / Owner’s Representative.\\"
418\\"Supply of all materials, fabrication and erection of chain link fencing 2.5 M high with mesh up to 2.0 M height and barbed wire fen cing complete in all respect including painting as per TS on all MS items, all works as per specification and drawings including fou ndations and RCC. Note: 1. Rate include cost of all labor, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement including sulphate resistant cement for sub structures, R/F steel, inserts, bolts, conduits, bitumen, other minor construction mater ials, shuttering, stinging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and sundry works.\\"
419\\"PERMANENT MARKER Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of foundation, pedestals and grouting with concrete , clearing, supply and application of approved color and quality of primer and paint (powder coated), stencil letter cutting for num bers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner / Owner’s Representative.\\"
420\\"Leak / Burst (Attributable to Company) All works for locating major leak / burst (occurred during hydrostatic testing) including necessary repairing / replacing defective pipelength, including cutting and removing out defective pipes, pretesting of replacement pipe and welding into mainline, NDT of wel ds and re-bevelled area, repair and re-testing of defective welds, coating of welded joints, clean-up, retesting the pipeline includ ing providing all necessary equipment's, labour, materials, consumables and inputs otherthan Owner supplied materials and performing all works as per drawings, specifications enclosed with the Contract and directions of Engineer-in-Charge. Note: 1. This rate is applicable for manufacturing defects in Company supplied material only.\\"
4214\\" NB Leak / Burst REPAIR
422\\"CONTINUOUS CONCRETE COATING (FOR CS PIPES) Supply of all consumables, materials and application of 50 mm thk. continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-20 for below specified Line Pipe size and field joints thereof in all areas of work wherever required as per sit e condition and performing all works as per specification on the line pipe for following sizes.\\"
423Specified NB 4\\" x 6.4 mm W.T. x 50 mm Concrete Coating
424\\"CONSTRUCTION OF RCC Construction and handing over of RCC Valve Pit of different size (internal dimension) as per technical specification and direction o f engineer-in-charge, complete in all respect. Scope of work shall be as per approved drawing. All civil works including supply of all material, excavation of pit, piping & valve supports including all PCC and RCC/ Brick works for valves pit, pedestals with insert plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local flooding of area, as per specifica tion enclosed and instruction of Engineer-in-Charge.\\"
425RCC Chamber - (Size - 2 m x 1.5 m)
426RCC Chamber - (Size - 2.5 m x 2.2 m)
427RCC Chamber - (Size - 3 m x 2.5 m)
428\\"RESTORATION OF ROADS Restoration of asphalt / concrete / red stone roads / pavement/ pavor block including compaction of soil, to original condition as p er requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness.\\"
429Restoration of Asphalt road up to 15 cm thickness
430Restoration of Asphalt road beyond 15 cm up to 20 cm thickness
431Restoration of RCC Concrete road up to 15 cm thickness
432Restoration of red stone road / footpath / pavement up to 4 inch thickness
433Providing and laying PCC (1:2:4) as per technical specifications & instruction of Engineer in charge. (Aggregate size 20 mm down)
434Providing and laying PCC (1:4:8) as per technical specifications & instruction of Engineer in charge. (Aggregate size 40 mm down)
435\\"RCC Providing and Laying reinforced cement concrete of grade M -25 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals etc. at all depths & heights including excavation shaffolding, shuttering, reinforcement steel ( FE 500D), all labour, materials, tools & tackles etc as per the instruction of Engineer in charge.\\"
436\\"Temporary Cathodic Protection: Design, Detailed Engineering, Survey, Supply, Installation, Testing and commissioning & Monitoring of the temporary cathodic protect ion [TCP] system using galvanic anodes to protect the external surface of the entire steel grid network from, against soil- side corrosion for minimum 2 year or till commissioning of permanent CP system whichever is later. All work shall b e carried out conforming to the Scope of work, Design Basis, Data Sheets, specification, standard and approved vendor list and p rovisions of GCC, SCC including Technical specifications,OWNER/ CONSULTANT approved survey report/design package, including all mate rials, equipments, consumables, start up/commissioning spares etc. complete in all respects including transportation, storage of mat erials at site, manpower, in line with direction of Engineer In-charge.\\"
437Soil Resistivity (At every 1000 meter), Soil Ionic & Microbial Loading (At every 5 Km and wherever Soil variation) and Interfering e lements surveys from pipeline ROW.
438Supply, installation, Testing & Commissioning of Test lead Points (TLP) including weather proof Test Lead Box as specified in specif ication with backlite strip, bolt terminals, 4” dia heavy duty pipe at top end to fit the test lead box and base plate welded at the bottom including MS bend for concrete Base, Bend, Cables, pipe to cable connection, Epoxy Encapsulation & Miscellaneous such as con nectors, Excavation and backfilling trenches for cable laying & Pin Brazing etc. complete in all respects. The work shall include su pply & fixing of a non corrosive name plate containing the details like KM location, identification, TLP No, Direction of flow, conn ection scheme, type etc., on the side of Top box including the cost of all labour, materials, tools & tackles etc. cables shall be a nnealed high conductivity, tinned, stranded copper conductor, XLPE insulated, 650/1100 V grade, PVC sheathed or as per specification .
439\\"Test Lead Point TYPE A (POTENTIAL MEASUREMENT) with minimum two cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential meas urement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP ) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 60 0 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, ter mination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techniqu e), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy pa int / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixin g of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sche me, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed , all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. Th e work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directi ons of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
440\\"Test Lead Point TYPE B: (CURRENT MEASUREMENT) with minimum four cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential measu rement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS S : heet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 10 0 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof conceal ed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, t ermination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techni que), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated i n standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fix ing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sc heme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever install ed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & direc tions of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
441Supply & Installation of pre-packed Mg Anode (7.6 Kg) with one cable including 1Cx10 Sq.mm Unarmoured cable (with sufficent length) & encapsulation kit for cable connection termination of Anode tail cable in the TLP etc. complete in all respects as per direction o f Engineer-In-Charge.
442Supply & Installation of Spark Gap Arrester/Surge Diverter for Insulating Joint complete in all respects as per direction of Engine er-In-Charge including the cost of all labour, materials, tools and tackles etc.
443Supply & Installation of Zinc Grounding Cell of 20 Kg each for IJ with two cables including 1Cx25 Sq.mm armoured cable (with suffice nt length), encapsulation kit termination of Anode tail cable in the TLP etc.
444\\"TELECOMMUNICATION SITE WORK (As per scope of work and Standard Specification of Bid documents)\\"
445Supply and Laying of HDPE Telecom Duct as per specification :-Supply & Laying of single 40mm OD, 6kg/cm2 permanently lubricated HD PE ducts. Factory Acceptance Testing as per specification. (Qty with spares) Supply of spare HDPE accessories Plastic Couplers (PC), End Plugs (EP), Cable Sealing Plugs (CSP), End Caps (EC) etc suitable for supplied Duct , Laying in same pipeline trench direct bur ied or tied along with steel at all crossings (cased or uncased), in all type of s oil & terrain, excavation as required, including cleaning and sealing of ducts at the end of laid drum lengths, preparation & Supply of Cable Blowing Pit including sand, jointing o f HDPE conduit, supply of all type of fitting for HDPE telecom duct laying, Testing of HDPE Duct and accessories after laying, prepa ration of report and final drawing & documents as per specification, joint location marking, erection accessories (suitable for min 8 kg/cm2 pressure rating),all complete as per specifications provided in the bid document & as per direction of consultant. (This du ct is for future requirement for total length of pipeline as per spec. and drawing ). HDPE duct is to be tied at 2 o-clock position to carrier pipe with string at regular intervals and held with Galvanized clamps or suitable material as decided by client / consult ant.
446Blowing of Optical Fiber Cable : - All activities pertaining to blowing of optical fiber cable in self lubricated HDPE Telecom duct (after testing of drum at site),through CS/ HDPE conduits at crossing, cable sealing, padding, backfilling etc. using all materials required, etc. all complete as per specifications and drawing provided in the bid document & as per direction of consultant.
447Supply and installation of jointing pits, including sand, etc. all complete as per spec., drawing provided in the bid document and the direction of client / consultant.
448Jointing / splicing of optical fiber cable ( 24 Fibers ) including supply and installation of joint markers (RF id Disk type), etc., testing all completed as per specifications & drawing provided in the bid document and direction of consultant.
449Supply & installation of optical splice closer as per specifications & drawing provided in the bid document and direction of client / consultant
450Supply & installation of Fiber termination cabinet as per specifications & drawing provided in the bid document and direction of cl ient / consultant
451Supply & Installation of wall mounted fiber termination box (FMS) as per tender specifications.
452Supply & Installation of Transition pit as per tender specifications.
453SUPPLY OF LONG RADIUS BENDS (R = 3D), RATING 300# Supply & fabrication of 3D bends as per PMS, specification requirement, data sheet, manufacturer, testing of fabricated bend & transportation of fabricated bend to site for installation of sizes specified below. All the Fabrication and Testing shall be as per specification. The butt-weld end thickness of the bend shall meet the thickness of connected line pipe as specified below:
4544\\" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm
45515 Degree 4\\" NB, Material : API 5L X 52
45622.5 Degree 4\\" NB, Material : API 5L X 52
45730 Degree 4\\" NB, Material : API 5L X 52
45860 Degree 4\\" NB, Material : API 5L X 52
459Supply of Equal Tee, Rating 300 #
4604\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
461Supply of Reducing Tee, Rating 300 #
4626\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
4634\\" x 2\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
464Flanges (WNRF), Rating 300 #
4654\\" (Material : ASTM A 694 F 52) Flanges (WNRF)
466Blind Flanges (RF), Rating 300 #
4674\\" (Material : ASTM A 694 F 52) BLIND FLANGE
468Insulating Joints as per tender specs, Rating 300 #
4694\\" Insulating Joints
470Supply of CS End caps
4714\\" NB End caps A234 Gr. WPB, BW Sch. 80
472Steel pipeline laying in PURNIA GA
473INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL)
474Specified NB (inch) x Wall thickness (mm) - Material of Construction
4754\\" x 6.4 mm - API 5L X 52 ( HFW / SMLS )
476\\"PIPELINE LAYING LIAISONING AND GETTING PERMISSIONS FROM THE STATUTORY AUTHORITIES
477\\"SUPPLY & INSTALLATION OF CASING PIPE ALONG WITH MAIN CARRIER PIPELINE
47810\\" NB Carbon steel casing pipe (Augur boring & Jacking Method / Moling/HDD) - For 4\\" Mainline Carrier Pipe
479\\"INSTALLATION OF CARRIER PIPE (CARBON STEEL) BY TRENCHLESS METHOD WITHOUT CASING.\\"
480Any other activities not mentioned/ covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works
481Installation of 4\\" NB PE 4 inch CS conduit as required by HDD
482Installation of 4\\" NB PE Coated Steel pipe alongwith 4 inch CS conduit as required by HDD in HARD ROCK USING DIAMOND CUTTER
483Installation of 4\\" NB PE Coated Steel pipe without any casing by Moiling
484INSTALLATION OF CARRIER PIPE BY HDD METHOD (SHALLOW HDD OR HDD ALONG THE ROAD WITHOUT CROSSING) 'Execution of road/other crossing by Shallow Horizontal Directional Drilling (HDD) technique OR laying by HDD method along the road without any crossing at a required depth as per site condition including mobilization & de-mobilization at site(s), supply of all ma terials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as p er all provisions of the contract document complete in all respect as per the instructions of the Engineer – in – charge /Site engin eer. 'Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspect ion of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage ar ea required thereof till the pipes are installed in permanent position. 'Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangemen t for pipeline stringing, launching etc. 'Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating includ ing defects/ damages occurring during transportation and handling. 'String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radi ography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiogra phs, repair of defects in the welds and re-testing etc. 'Carrying out pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of d efects and retesting etc. 'Coating of the field joints of the pipe string to be installed by shallow HDD method with DIRAX heat shrink sleeves of approved mak e used for HDD crossings. 'Repair of all coating damages in the pipe section to be laid by shallow HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of approved make. \\"
485\\"Supply & fixing of easy to install heat shrinkable duct end caps for HDPE duct for OFC (wherever OFC has to be laid along with the carrier pipeline). 'Installation of the pipeline and OFC conduit as a bundle crossing below the Road/ other utility horizontally by shallow HDD operati on to the correct profile as per the approved drawings in a pre-reamed hole of appropriate size. 'Carrying out post-installation coating survey as per approved procedure. 'Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. 'All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note: 1. Payment shall be based on the actual length (Length between tie-in joints) of pipeline laid by Shallow HDD. Exact location of ti e-in shall be approved by Owner/ Owner's Representative. 3. The length of Shallow HDD mentioned is tentative and may vary to the considerable extent, depending upon requirements as per site conditions and shall be decided by Engineer-in-Charge. 4. Payment for the length of final tie-in carrier pipeline string with mainline laid by Shallow HDD are inclusive in this above item rate. No separate payment shall be made under other clauses mentioned elsewhere. 4. The supply and laying of HDPE duct is included in this SOR item and will not be paid separatly. 6. This item shall be executed as per specific instruction of Engineer-In-Charge.\\"
486Installation of 4\\" NB PE Coated Steel pipe along with 2 Nos HDPE Duct as required by Shallow HDD method
487INSTALLATION OF SV STATIONS All works for installation of all underground & above ground piping at all elevations and below ground at all depth for Sectionalizi ng Valve Station with / without future tap-off in the same valve chamber as per P & ID & GAD in all type of terrains and soils incl uding \\"\\"Receiving and taking over\\"\\" as defined in the specifications, handling, loading, transportation and unloading of all Owner s upplied materials i.e. extended stem, butt welded, sectionalizing ball valve, other types of valves, line pipes for mainline from Ow ner's designated place(s) of issue to work site, Supply of pipes, fittings & valves for piping of size below 4\\"\\" dia, supply of all consumables, materials, manpower and carrying out all mechanical works of underground and above ground piping including fabrica tion, welding, non-destructive testing of welds by radiography or Utrasoninc Testing in case radiography is not possible, weld repa irs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testing, pneumatic seat & seal te st as per API 6D, cutting of mainline and beveling (if required), tie-in of valve assembly, including radiography of tie-in joints a nd Ultrasoninc testing of Golden joints, corrosion, coating and external painting as required. Installation of instruments like pressure/ temperature instruments/ gauges, provision for tubing to the actuator in future, obtainin g all statutory clearances, approvals and permissions for the works (wherever required). Excavation in all types of soil including soft / hard / rocky surfaces, providing 200 mm thk PCC for valve base support, backfilling and compaction with approved soil for installation of pipes and fittings, etc including sand padding all around the valves in SV st ation, pipe supports and fencing would be paid against separate SOR s ), painting, finishing, clean-up and restoration of site; prep aration of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisio ns of Contract document and instructions of Engineer-in- charge. Note: 1. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor with in the rate quoted. 2. This work is exclusive of all works associated with main pipeline covered under SOR item specified as INSTALLATION OF CARRIER PIP E BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. All civil / structural works including area fencing and gate, pipe supports, valve chamber shall be paid separately as per unit r ate provided elsewhere in the SOR. 4. 4\\"\\" and above (fittings & flanges etc. ), material supply is also in the contractor scope. It shall be be paid separately under Supply item provided elsewhere in the SOR.\\"
488SV STATION WITH VENT WITHOUT BY-PASS LINE AND WITH / WITHOUT FUTURE TAP-OFF
4894\\" NB SV STATION WITH VENT
490Works at Future Connections: Complete works of design, engineering, installation of all piping, valves, fittings at all depths inside the pit in all types of te rrains and soils including transportation, handling of Owner supplied material from Owner's designated issue point(s) to work site, supply of Contractor's supplied materials to work site(s), all mechanical works including fabrication, welding, non destructive tes ting of welds, weld repairs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testin g, cutting of mainline and beveling (if required), tie-in of valve assembly, including radiography of tie-in joints, corrosion, coating and external painting as required. All civil works including excavation of pit, piping supports including all PCC and RCC works for pedestals with insert plates as re quired, construction of valve chamber including with supply of all material and finishing, clean up and restoration of site , filling and grading of area around valve station for avoiding any local flooding of area and as per specificati on and instructions of Owner/Owner's representative. Preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other prov isions of Contract document and instructions of Engineer-in- charge. Note: 1. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor with in the rate quoted. 2. This work is exclusive of all works associated with main pipeline covered under SOR item specified as INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. All civil / structural works including area fencing and gate, pipe supports, valve chamber shall be paid separately as per unit r ate provided elsewhere in the SOR. 4. 4\\"\\" and above (fittings & flanges etc. ), material supply is also in the contractor scope. It shall be be paid separately under Supply item provided elsewhere in the SOR.\\"
4914\\" x 4\\" for newly laid line Works at Future Connections
492\\"PURGING & INERTIZATION OF PIPELINE - INCLUDING SUPPLY OF NITROGEN Purging and inertization of pipeline section between the two isolation valves with nitrogen to make the pipeline section free from o xygen including supply of required quantity of nitrogen and all equipments, tools and tackles, manpower etc. required for the works and as per instruction of engineer in charge. Complete with necessary regulator, hoses, pressure guage, connections with tools and t ackles. Submission of purging plan for approval before actual work and complete assistance for purging. By filling and pressurizing with nitrogen upto a pressure of 2 bar(g). Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator , hoses, connections with tools and tackles instruction of EIC. Payment shall be made on number of nitrogen cylinders used on actual basis. Note: 1. Contractor shall be responsible for maintaing the pressure up to 2 bar(g) till commissioning. However, Additional nitrogen fillin g shall be paid as per SOR mentioned immediate above for maintaing the presurre up to 2 barg on actual basis.\\"
4934\\" NB PURGING & INERTIZATION OF PIPELINE
494Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator, hoses, connections with tools and tackles instruction of EIC.
495\\"PIPELINE LAYING / INSTALLATION OF ABOVE GROUND PIPELINE (WHEREVER REQUIRED AT CNG/DRS/MRS STATIONS & CONSUMER ENDS ETC.)\\"
496\\"WELDING OF PIPES WITH PIPE / FITTINGS / VALVES : - Receiving and taking over of all free issue materials from company’s designated place of issue, handling including lifting, transpor tation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site fo r field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings etc. to match with grinding the edges of pipes, fittings etc. to match with the matching edges of uneven / different thickness wherever required fit - up bending, p reheating wherever required, welding etc. pipe fittings like elbows, tees, reducers, weldolets, sockolets, vent and drain point conn ection etc
4974\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
4982\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
4991.5\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
5001\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
5010.75\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
502\\"WELDING OF PIPES WITH FLANGES Receiving and taking over of all free issue materials from OWNER’s designated place of issue, handling including lifting, transporta tion from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, flanges etc to match with the matching ed ges of uneven / different thickness, preheating wherever required, welding etc. including supply and fixing of all types of gaskets (including gaskets for RTJ flanges), bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instr uction of EIC. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contract or to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractor scope. It shall be be paid separately under Suppl y item provided elsewhere in the SOR on actual quantity basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor within the rate quoted. These items shall not be separately measured and paid.\\"
5034\\" NB WELDING OF PIPES WITH FLANGES
5042\\" NB WELDING OF PIPES WITH FLANGES
5051.5\\" NB WELDING OF PIPES WITH FLANGES
5061\\" NB WELDING OF PIPES WITH FLANGES
5070.75\\" NB WELDING OF PIPES WITH FLANGES
508ERECTION & TESTING Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon steel piping and fitting s of all sizes and ratings including supply & installation of all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind flanges, spectacle blind flanges, valves, pipes of sizes below 4” NB and of all ratings including supply of all consumables, equipment, manpower and other resources and execution of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative and as per all provisions of the contract document. Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with equipment nozzle , aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, fl anges blind flange, spectacle blind flanges, branch connection / tapping, vents and drains, required for process and hydro testing, tapping for pressure gauges thermowells sample connections, etc. Painting of entire system (including all pipes and accessories) as per specification, including supply of approved paints and primer s, preparation of surface and application of primer and paint, identification lettering / numbering, color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by OWNER and providing scaffolding for a ll heights etc. Cleaning and flushing by water/ compressed air, testing of the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air / other methods approved by OWNER. Cleaning and flushing by water / compressed air, testing of the system including hydrostatic, pneumatic and any other type of testin g as specified, draining, drying by compressed air/ other methods as approved by Owner. Completion of all such work in all respect as per scope of work and as per drawings specifications and instructions of the OWNER and keeping in the system ready in all respects for further commissioning and start up. Hooking up with other system piping at battery limit. Preparation of isometric, fabrication drawings. Bill of materials as per specifications, drawings and instruction of Owner / Owner’ s Representative. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contractor to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractors scope.
5094\\" NB ERECTION & TESTING
5102\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
5111.5\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
5121\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
5130.75\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
514\\"SUPPLY & INSTALLATION OF SS PRESSURE GAUGE Supply of SS pressure gauges as per data sheet and drawing enclosed in tender and Installation of pressure guages and their accessor ies inclusive of supply of necessary piping materials and tubings along with all necessary valves and fittings, fabrication and inst allation of impulse lines / mainfolds and hydrulic testing and calibration as per installation standard.\\"
515Supply & installation of SS pressure gauge (Make - as per recommended vendor list) as per data sheet attached in the tender
516PIPE SUPPORTS & STRUCTURES
517Supply, fabrication and erection of all types of pipe supports of MS material like clamps, saddle, guide stops, cradles, turn buckles, anchors, T-posts; stockade / trestle and pipe bridge for overhead piping; frames for canopy, approach ladders and platforms, cro ssover, cable tray supports etc. including painting suitable for highly corrosive area as per specification labor and supervision & complete work as per specifications and instruction of Engineer in charge (Bolts, nuts, washers, U - clamps etc. for supporting shal l be supplied by the contractor within the rates quoted. These items will not be measured and paid separately) this work is to be complete in all respect as per scope of work.
518\\"STRUCTURAL WORKS (FENCING & GATE) Supply and erection of single leaf mild steel gate 2.5 M high with mesh up to 2.0 M height and barbed wire fencing of 0.5 M height a nd 2.0 M wide complete in all respect including painting as per specification on all MS items, all works as per specification and dr awings including foundations and RCC.\\"
519\\"Supply of all materials, fabrication and erection of chain link fencing 2.5 M high with mesh up to 2.0 M height and barbed wire fen cing complete in all respect including painting as per TS on all MS items, all works as per specification and drawings including fou ndations and RCC. Note: 1. Rate include cost of all labor, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement including sulphate resistant cement for sub structures, R/F steel, inserts, bolts, conduits, bitumen, other minor construction mater ials, shuttering, stinging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and sundry works.\\"
520\\"PERMANENT MARKER Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of foundation, pedestals and grouting with concrete , clearing, supply and application of approved color and quality of primer and paint (powder coated), stencil letter cutting for num bers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner / Owner’s Representative.\\"
521RCC route marker as per approved drawing
522Pipeline Warning markers/ Direction markers/kilometer marker with Post & foundations as per drawing. It shall be powder coated only & before installation take approval from the EIC.
523\\"Leak / Burst (Attributable to Company) All works for locating major leak / burst (occurred during hydrostatic testing) including necessary repairing / replacing defective pipelength, including cutting and removing out defective pipes, pretesting of replacement pipe and welding into mainline, NDT of wel ds and re-bevelled area, repair and re-testing of defective welds, coating of welded joints, clean-up, retesting the pipeline includ ing providing all necessary equipment's, labour, materials, consumables and inputs otherthan Owner supplied materials and performing all works as per drawings, specifications enclosed with the Contract and directions of Engineer-in-Charge. Note: 1. This rate is applicable for manufacturing defects in Company supplied material only.\\"
5244\\" NB Leak / Burst REPAIR
525\\"CONTINUOUS CONCRETE COATING (FOR CS PIPES) Supply of all consumables, materials and application of 50 mm thk. continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-20 for below specified Line Pipe size and field joints thereof in all areas of work wherever required as per sit e condition and performing all works as per specification on the line pipe for following sizes.\\"
526Specified NB 4\\" x 6.4 mm W.T. x 50 mm Concrete Coating
527\\"CONSTRUCTION OF RCC Construction and handing over of RCC Valve Pit of different size (internal dimension) as per technical specification and direction o f engineer-in-charge, complete in all respect. Scope of work shall be as per approved drawing. All civil works including supply of all material, excavation of pit, piping & valve supports including all PCC and RCC/ Brick works for valves pit, pedestals with insert plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local flooding of area, as per specifica tion enclosed and instruction of Engineer-in-Charge.\\"
528RCC Chamber - (Size - 2 m x 1.5 m)
529RCC Chamber - (Size - 2.5 m x 2.2 m)
530\\"RESTORATION OF ROADS Restoration of asphalt / concrete / red stone roads / pavement/ pavor block including compaction of soil, to original condition as p er requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness.\\"
531Restoration of Asphalt road up to 15 cm thickness
532Restoration of Asphalt road beyond 15 cm up to 20 cm thickness
533Restoration of RCC Concrete road up to 15 cm thickness
534Restoration of red stone road / footpath / pavement up to 4 inch thickness
535Providing and laying PCC (1:2:4) as per technical specifications & instruction of Engineer in charge. (Aggregate size 20 mm down)
536Providing and laying PCC (1:4:8) as per technical specifications & instruction of Engineer in charge. (Aggregate size 40 mm down)
537\\"RCC Providing and Laying reinforced cement concrete of grade M -25 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals etc. at all depths & heights including excavation shaffolding, shuttering, reinforcement steel ( FE 500D), all labour, materials, tools & tackles etc as per the instruction of Engineer in charge.\\"
538\\"Temporary Cathodic Protection: Design, Detailed Engineering, Survey, Supply, Installation, Testing and commissioning & Monitoring of the temporary cathodic protect ion [TCP] system using galvanic anodes to protect the external surface of the entire steel grid network from, against soil- side corrosion for minimum 2 year or till commissioning of permanent CP system whichever is later. All work shall b e carried out conforming to the Scope of work, Design Basis, Data Sheets, specification, standard and approved vendor list and p rovisions of GCC, SCC including Technical specifications,OWNER/ CONSULTANT approved survey report/design package, including all mate rials, equipments, consumables, start up/commissioning spares etc. complete in all respects including transportation, storage of mat erials at site, manpower, in line with direction of Engineer In-charge.\\"
539Soil Resistivity (At every 1000 meter), Soil Ionic & Microbial Loading (At every 5 Km and wherever Soil variation) and Interfering e lements surveys from pipeline ROW.
540Supply, installation, Testing & Commissioning of Test lead Points (TLP) including weather proof Test Lead Box as specified in specif ication with backlite strip, bolt terminals, 4” dia heavy duty pipe at top end to fit the test lead box and base plate welded at the bottom including MS bend for concrete Base, Bend, Cables, pipe to cable connection, Epoxy Encapsulation & Miscellaneous such as con nectors, Excavation and backfilling trenches for cable laying & Pin Brazing etc. complete in all respects. The work shall include su pply & fixing of a non corrosive name plate containing the details like KM location, identification, TLP No, Direction of flow, conn ection scheme, type etc., on the side of Top box including the cost of all labour, materials, tools & tackles etc. cables shall be a nnealed high conductivity, tinned, stranded copper conductor, XLPE insulated, 650/1100 V grade, PVC sheathed or as per specification .
541\\"Test Lead Point TYPE A (POTENTIAL MEASUREMENT) with minimum two cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential meas urement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP ) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 60 0 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, ter mination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techniqu e), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy pa int / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixin g of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sche me, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed , all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. Th e work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directi ons of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
542\\"Test Lead Point TYPE B: (CURRENT MEASUREMENT) with minimum four cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential measu rement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS S : heet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 10 0 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof conceal ed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, t ermination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techni que), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated i n standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fix ing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sc heme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever install ed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & direc tions of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
543Supply & Installation of pre-packed Mg Anode (7.6 Kg) with one cable including 1Cx10 Sq.mm Unarmoured cable (with sufficent length) & encapsulation kit for cable connection termination of Anode tail cable in the TLP etc. complete in all respects as per direction o f Engineer-In-Charge.
544\\"TELECOMMUNICATION SITE WORK (As per scope of work and Standard Specification of Bid documents)\\"
545Supply and Laying of HDPE Telecom Duct as per specification :-Supply & Laying of single 40mm OD, 6kg/cm2 permanently lubricated HD PE ducts. Factory Acceptance Testing as per specification. (Qty with spares) Supply of spare HDPE accessories Plastic Couplers (PC), End Plugs (EP), Cable Sealing Plugs (CSP), End Caps (EC) etc suitable for supplied Duct , Laying in same pipeline trench direct bur ied or tied along with steel at all crossings (cased or uncased), in all type of soil & terrain, excavation as required, including cleaning and sealing of ducts at the end of laid drum lengths, preparation & Supply of Cable Blowing Pit including sand, jointing o f HDPE conduit, supply of all type of fitting for HDPE telecom duct laying, Testing of HDPE Duct and accessories after laying, prepa ration of report and final drawing & documents as per specification, joint location marking, erection accessories (suitable for min 8 kg/cm2 pressure rating),all c omplete as per specifications provided in the bid document & as per direction of consultant. (This du ct is for future requirement for total length of pipeline as per spec. and drawing ). HDPE duct is to be tied at 2 o-clock position to carrier pipe with string at regular intervals and held with Galvanized clamps or suitable material as decided by client / consult ant.
546Blowing of Optical Fiber Cable : - All activities pertaining to blowing of optical fiber cable in self lubricated HDPE Telecom duct (after testing of drum at site),through CS/ HDPE conduits at crossing, cable sealing, padding, backfilling etc. using all materials required, etc. all complete as per specifications and drawing provided in the bid document & as per direction of consultant.
547Supply and installation of jointing pits, including sand, etc. all complete as per spec., drawing provided in the bid document and the direction of client / consultant.
548Jointing / splicing of optical fiber cable ( 24 Fibers ) including supply and installation of joint markers (RF id Disk type), etc., testing all completed as per specifications & drawing provided in the bid document and direction of consultant.
549Supply & installation of optical splice closer as per specifications & drawing provided in the bid document and direction of client / consultant
550Supply of Equal Tee, Rating 300 #
5514\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
552Flanges (WNRF), Rating 300 #
5534\\" (Material : ASTM A 694 F 52) Flanges (WNRF)
554Blind Flanges (RF), Rating 300 #
5554\\" (Material : ASTM A 694 F 52) BLIND FLANGE
556Insulating Joints as per tender specs, Rating 300 #
5574\\" Insulating Joints
558Supply of CS End caps
5594\\" NB End caps A234 Gr. WPB, BW Sch. 80
560Steel pipeline laying in MADHEPURA GA
561INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL)
562Specified NB (inch) x Wall thickness (mm) - Material of Construction
5634\\" x 6.4 mm - API 5L X 52 ( HFW / SMLS )
564\\"PIPELINE LAYING LIAISONING AND GETTING PERMISSIONS FROM THE STATUTORY AUTHORITIES
565\\"SUPPLY & INSTALLATION OF CASING PIPE ALONG WITH MAIN CARRIER PIPELINE
56610\\" NB Carbon steel casing pipe (Augur boring & Jacking Method / Moling/HDD) - For 4\\" Mainline Carrier Pipe
567\\"INSTALLATION OF CARRIER PIPE (CARBON STEEL) BY TRENCHLESS METHOD WITHOUT CASING.\\"
568Any other activities not mentioned/ covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works
569Installation of 4\\" NB PE 4 inch CS conduit as required by HDD
570Installation of 4\\" NB PE Coated Steel pipe alongwith 4 inch CS conduit as required by HDD in HARD ROCK USING DIAMOND CUTTER
571Installation of 4\\" NB PE Coated Steel pipe without any casing by Moiling
572\\"INSTALLATION OF CARRIER PIPE BY HDD METHOD (SHALLOW HDD OR HDD ALONG THE ROAD WITHOUT CROSSING) 'Execution of road/other crossing by Shallow Horizontal Directional Drilling (HDD) technique OR laying by HDD method along the road without any crossing at a required depth as per site condition including mobilization & de-mobilization at site(s), supply of all ma terials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as p er all provisions of the contract document complete in all respect as per the instructions of the Engineer – in – charge /Site engin eer. 'Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspect ion of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage ar ea required thereof till the pipes are installed in permanent position. 'Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangemen t for pipeline stringing, launching etc. 'Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating includ ing defects/ damages occurring during transportation and handling. 'String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radi ography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiogra phs, repair of defects in the welds and re-testing etc. 'Carrying out pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of d efects and retesting etc. 'Coating of the field joints of the pipe string to be installed by shallow HDD method with DIRAX heat shrink sleeves of approved mak e used for HDD crossings. 'Repair of all coating damages in the pipe section to be laid by shallow HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of approved make. \\"
573\\"Supply & fixing of easy to install heat shrinkable duct end caps for HDPE duct for OFC (wherever OFC has to be laid along with the carrier pipeline). 'Installation of the pipeline and OFC conduit as a bundle crossing below the Road/ other utility horizontally by shallow HDD operati on to the correct profile as per the approved drawings in a pre-reamed hole of appropriate size. 'Carrying out post-installation coating survey as per approved procedure. 'Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. 'All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note: 1. Payment shall be based on the actual length (Length between tie-in joints) of pipeline laid by Shallow HDD. Exact location of ti e-in shall be approved by Owner/ Owner's Representative. 3. The length of Shallow HDD mentioned is tentative and may vary to the considerable extent, depending upon requirements as per site conditions and shall be decided by Engineer-in-Charge. 4. Payment for the length of final tie-in carrier pipeline string with mainline laid by Shallow HDD are inclusive in this above item rate. No separate payment shall be made under other clauses mentioned elsewhere. 4. The supply and laying of HDPE duct is included in this SOR item and will not be paid separatly. 6. This item shall be executed as per specific instruction of Engineer-In-Charge.\\"
574Installation of 4\\" NB PE Coated Steel pipe along with 2 Nos HDPE Duct as required by Shallow HDD method
575\\"PURGING & INERTIZATION OF PIPELINE - INCLUDING SUPPLY OF NITROGEN Purging and inertization of pipeline section between the two isolation valves with nitrogen to make the pipeline section free from o xygen including supply of required quantity of nitrogen and all equipments, tools and tackles, manpower etc. required for the works and as per instruction of engineer in charge. Complete with necessary regulator, hoses, pressure guage, connections with tools and t ackles. Submission of purging plan for approval before actual work and complete assistance for purging. By filling and pressurizing with nitrogen upto a pressure of 2 bar(g). Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator , hoses, connections with tools and tackles instruction of EIC. Payment shall be made on number of nitrogen cylinders used on actual basis. Note: 1. Contractor shall be responsible for maintaing the pressure up to 2 bar(g) till commissioning. However, Additional nitrogen fillin g shall be paid as per SOR mentioned immediate above for maintaing the presurre up to 2 barg on actual basis.\\"
5764\\" NB PURGING & INERTIZATION OF PIPELINE
577Supply & Filling of additional nitrogen through labelled, tested, and certified cylinders of 7cum, complete with necessary regulator, hoses, connections with tools and tackles instruction of EIC.
578\\"PIPELINE LAYING / INSTALLATION OF ABOVE GROUND PIPELINE (WHEREVER REQUIRED AT CNG/DRS/MRS STATIONS & CONSUMER ENDS ETC.)\\"
579WELDING OF PIPES WITH PIPE / FITTINGS / VALVES : - Receiving and taking over of all free issue materials from company’s designated place of issue, handling including lifting, transpor tation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site fo r field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings etc. to match with grinding the edges of pipes, fittings etc. to match with the matching edges of uneven / different thickness wherever required fit - up bending, p reheating wherever required, welding etc. pipe fittings like elbows, tees, reducers, weldolets, sockolets, vent and drain point conn ection etc. including providing stub-in connection, fabricated fittings and reinforcement pads etc. as required. Carrying out Non-de structive testing as per specification & instruction of EIC. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contract or to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractor scope. It shall be be paid separately under Suppl y item provided elsewhere in the SOR on actual quantity basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor within the rate quoted. These items shall not be separately measured and paid.\\"
5802\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
5811.5\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
5821\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
5830.75\\" NB WELDING OF PIPES WITH PIPE / FITTINGS / VALVES
584WELDING OF PIPES WITH FLANGES Receiving and taking over of all free issue materials from OWNER’s designated place of issue, handling including lifting, transporta tion from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, flanges etc to match with the matching ed ges of uneven / different thickness, preheating wherever required, welding etc. including supply and fixing of all types of gaskets (including gaskets for RTJ flanges), bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instr uction of EIC. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contract or to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractor scope. It shall be be paid separately under Suppl y item provided elsewhere in the SOR on actual quantity basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the con tractor within the rate quoted. These items shall not be separately measured and paid.\\"
5854\\" NB WELDING OF PIPES WITH FLANGES
5862\\" NB WELDING OF PIPES WITH FLANGES
5871.5\\" NB WELDING OF PIPES WITH FLANGES
5881\\" NB WELDING OF PIPES WITH FLANGES
5890.75\\" NB WELDING OF PIPES WITH FLANGES
590ERECTION & TESTING Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon steel piping and fitting s of all sizes and ratings including supply & installation of all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind flanges, spectacle blind flanges, valves, pipes of sizes below 4” NB and of all ratings including supply of all consumables, equipment, manpower and other resources and execution of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative and as per all provisions of the contract document. Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with equipment nozzle , aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, fl anges blind flange, spectacle blind flanges, branch connection / tapping, vents and drains, required for process and hydro testing, tapping for pressure gauges thermowells sample connections, etc. Painting of entire system (including all pipes and accessories) as per specification, including supply of approved paints and primer s, preparation of surface and application of primer and paint, identification lettering / numbering, color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by OWNER and providing scaffolding for a ll heights etc. Cleaning and flushing by water/ compressed air, testing of the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air / other methods approved by OWNER. Cleaning and flushing by water / compressed air, testing of the system including hydrostatic, pneumatic and any other type of testin g as specified, draining, drying by compressed air/ other methods as approved by Owner. Completion of all such work in all respect as per scope of work and as per drawings specifications and instructions of the OWNER and keeping in the system ready in all respects for further commissioning and start up. Hooking up with other system piping at battery limit. Preparation of isometric, fabrication drawings. Bill of materials as per specifications, drawings and instruction of Owner / Owner’ s Representative. Note: 1. All materials of sizes below 4\\"\\" shall be in contractor's scope. 2. Welding Joints under above SOR item are for Above Ground Piping only (Except Flange). 3. The above SOR item shall be carried out only when instructed by Engineer In charge. 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply and installation of Assorted pipes of all rating/ thickness types, as required are inclusive under this SOR item, Contractor to quote accordingly. 6. 4\\"\\" and above (fittings & flanges etc. ), material supply are in the contractors scope.
5914\\" NB ERECTION & TESTING
5922\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
5931.5\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
5941\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
5950.75\\" NB (Including supply of pipe, fittings, flanges, valves and other items required).
596\\"SUPPLY & INSTALLATION OF SS PRESSURE GAUGE Supply of SS pressure gauges as per data sheet and drawing enclosed in tender and Installation of pressure guages and their accessor ies inclusive of supply of necessary piping materials and tubings along with all necessary valves and fittings, fabrication and inst allation of impulse lines / mainfolds and hydrulic testing and calibration as per installation standard.\\"
597Supply & installation of SS pressure gauge (Make - as per recommended vendor list) as per data sheet attached in the tender
598PIPE SUPPORTS & STRUCTURES
599Supply, fabrication and erection of all types of pipe supports of MS material like clamps, saddle, guide stops, cradles, turn buckles, anchors, T-posts; stockade / trestle and pipe bridge for overhead piping; frames for canopy, approach ladders and platforms, cro ssover, cable tray supports etc. including painting suitable for highly corrosive area as per specification labor and supervision & complete work as per specifications and instruction of Engineer in charge (Bolts, nuts, washers, U - clamps etc. for supporting shal l be supplied by the contractor within the rates quoted. These items will not be measured and paid separately) this work is to be complete in all respect as per scope of work.
600\\"STRUCTURAL WORKS (FENCING & GATE) Supply and erection of single leaf mild steel gate 2.5 M high with mesh up to 2.0 M height and barbed wire fencing of 0.5 M height a nd 2.0 M wide complete in all respect including painting as per specification on all MS items, all works as per specification and dr awings including foundations and RCC.\\"
601\\"Supply of all materials, fabrication and erection of chain link fencing 2.5 M high with mesh up to 2.0 M height and barbed wire fen cing complete in all respect including painting as per TS on all MS items, all works as per specification and drawings including fou ndations and RCC. Note: 1. Rate include cost of all labor, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement including sulphate resistant cement for sub structures, R/F steel, inserts, bolts, conduits, bitumen, other minor construction mater ials, shuttering, stinging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and sundry works.\\"
602\\"PERMANENT MARKER Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of foundation, pedestals and grouting with concrete , clearing, supply and application of approved color and quality of primer and paint (powder coated), stencil letter cutting for num bers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner / Owner’s Representative.\\"
603RCC route marker as per approved drawing
604\\"Leak / Burst (Attributable to Company) All works for locating major leak / burst (occurred during hydrostatic testing) including necessary repairing / replacing defective pipelength, including cutting and removing out defective pipes, pretesting of replacement pipe and welding into mainline, NDT of wel ds and re-bevelled area, repair and re-testing of defective welds, coating of welded joints, clean-up, retesting the pipeline includ ing providing all necessary equipment's, labour, materials, consumables and inputs otherthan Owner supplied materials and performing all works as per drawings, specifications enclosed with the Contract and directions of Engineer-in-Charge. Note: 1. This rate is applicable for manufacturing defects in Company supplied material only.\\"
6054\\" NB Leak / Burst REPAIR
606\\"CONTINUOUS CONCRETE COATING (FOR CS PIPES) Supply of all consumables, materials and application of 50 mm thk. continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-20 for below specified Line Pipe size and field joints thereof in all areas of work wherever required as per sit e condition and performing all works as per specification on the line pipe for following sizes.\\"
607Specified NB 4\\" x 6.4 mm W.T. x 50 mm Concrete Coating
608\\"CONSTRUCTION OF RCC Construction and handing over of RCC Valve Pit of different size (internal dimension) as per technical specification and direction o f engineer-in-charge, complete in all respect. Scope of work shall be as per approved drawing. All civil works including supply of all material, excavation of pit, piping & valve supports including all PCC and RCC/ Brick works for valves pit, pedestals with insert plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local flooding of area, as per specifica tion enclosed and instruction of Engineer-in-Charge.\\"
609RCC Chamber - (Size - 2 m x 1.5 m)
610RCC Chamber - (Size - 2.5 m x 2.2 m)
611\\"RESTORATION OF ROADS Restoration of asphalt / concrete / red stone roads / pavement/ pavor block including compaction of soil, to original condition as p er requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness.\\"
612Restoration of Asphalt road up to 15 cm thickness
613Restoration of Asphalt road beyond 15 cm up to 20 cm thickness
614Restoration of RCC Concrete road up to 15 cm thickness
615Restoration of red stone road / footpath / pavement up to 4 inch thickness
616Providing and laying PCC (1:2:4) as per technical specifications & instruction of Engineer in charge. (Aggregate size 20 mm down)
617Providing and laying PCC (1:4:8) as per technical specifications & instruction of Engineer in charge. (Aggregate size 40 mm down)
618\\"RCC Providing and Laying reinforced cement concrete of grade M -25 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals etc. at all depths & heights including excavation shaffolding, shuttering, reinforcement steel ( FE 500D), all labour, materials, tools & tackles etc as per the instruction of Engineer in charge.\\"
619\\"Temporary Cathodic Protection: Design, Detailed Engineering, Survey, Supply, Installation, Testing and commissioning & Monitoring of the temporary cathodic protect ion [TCP] system using galvanic anodes to protect the external surface of the entire steel grid network from, against soil- side corrosion for minimum 2 year or till commissioning of permanent CP system whichever is later. All work shall b e carried out conforming to the Scope of work, Design Basis, Data Sheets, specification, standard and approved vendor list and p rovisions of GCC, SCC including Technical specifications,OWNER/ CONSULTANT approved survey report/design package, including all mate rials, equipments, consumables, start up/commissioning spares etc. complete in all respects including transportation, storage of mat erials at site, manpower, in line with direction of Engineer In-charge.\\"
620Soil Resistivity (At every 1000 meter), Soil Ionic & Microbial Loading (At every 5 Km and wherever Soil variation) and Interfering e lements surveys from pipeline ROW.
621\\"Test Lead Point TYPE A (POTENTIAL MEASUREMENT) with minimum two cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential meas urement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP ) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 60 0 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, ter mination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techniqu e), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy pa int / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fixin g of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sche me, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed , all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. Th e work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directi ons of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
622\\"Test Lead Point TYPE B: (CURRENT MEASUREMENT) with minimum four cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential measu rement cables, pin brazing connection encapsulation kit etc.: Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS S : heet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Guage MS pipe 10 0 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof conceal ed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, t ermination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing techni que), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cables (as indicated i n standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The work includes supply and fix ing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection sc heme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever install ed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & direc tions of the Site Engineer/Engineer-In-Charge. SACRIFICIAL ANODES FOR TCP ARE ALSO TO BE CONNECTED TO THIS TLP THROUGH A VARIABLE RESISTOR AND SHUNT ARRANGEMENT AS PER STD DRAWING S\\"
623Supply & Installation of pre-packed Mg Anode (7.6 Kg) with one cable including 1Cx10 Sq.mm Unarmoured cable (with sufficent length) & encapsulation kit for cable connection termination of Anode tail cable in the TLP etc. complete in all respects as per direction o f Engineer-In-Charge.
624\\"TELECOMMUNICATION SITE WORK (As per scope of work and Standard Specification of Bid documents)\\"
625Supply and Laying of HDPE Telecom Duct as per specification :-Supply & Laying of single 40mm OD, 6kg/cm2 permanently lubricated HD PE ducts. Factory Acceptance Testing as per specification. (Qty with spares) Supply of spare HDPE accessories Plastic Couplers (PC), End Plugs (EP), Cable Sealing Plugs (CSP), End Caps (EC) etc suitable for supplied Duct , Laying in same pipeline trench direct bur ied or tied along with steel at all crossings (cased or uncased), in all type of soil & terrain, excavation as required, including cleaning and sealing of ducts at the end of laid drum lengths, preparation & Supply of Cable Blowing Pit including sand, jointing o f HDPE conduit, supply of all type of fitting for HDPE telecom duct laying, Testing of HDPE Duct and accessories after laying, prepa ration of report and final drawing & documents as per specification, joint location marking, erection accessories (suitable for min 8 kg/cm2 pressure rating),all complete as per specifications provided in the bid document & as per direction of consultant. (This du ct is for future requirement for total length of pipeline as per spec. and drawing ). HDPE duct is to be tied at 2 o-clock position to carrier pipe with string at regular intervals and held with Galvanized clamps or suitable material as decided by client / consult ant.
626Supply of Equal Tee, Rating 300 #
6274\\" x 4\\", Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm
628Flanges (WNRF), Rating 300 #
6294\\" (Material : ASTM A 694 F 52) Flanges (WNRF)
630Blind Flanges (RF), Rating 300 #
6314\\" (Material : ASTM A 694 F 52) BLIND FLANGE
632Supply of CS End caps
6334\\" NB End caps A234 Gr. WPB, BW Sch. 80 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 55866785
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 13-07-2026
Authority
Authority Name Indian Oil Corporation Limited
Work Description Tender for annual rate contract For Laying Of 3Lpe Coated Carbon 4 Steel Pipeline In Gas Under Bihar & Other Associated Work Including Installation Of Sv Stations & Supply Of Materials Mentioned As Per Sor, For Connectivity Steel Lines For Drs/Mrs/Cng Stations.
Basic Detail
Tender No BD/CONT/26-27/021
Bidding Type Tender
Location
City Patna
State Bihar
Key Dates
Publish Date 07 Jul 2026
Submission Date 13 Jul 2026
Open Date 14 Jul 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 1.74 Lakhs
Exemption Available
Document List
021_Tender_Documents-1.rar
500446b2-1094-40fd-8e23-97419251a762.html
6_Technical_specifications.pdf
Bidders_help_Document_for_1.pdf
BOQ_200416.xls
FAQs-IOCL-Online-EMD.pdf
Special_Instructions_to_t_2.pdf
Tender-Acceptance-Format.pdf
Tendernotice_1 (9).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 06, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 13, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 4 days
Jul 13, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days
Jul 14, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
rar

021_Tender_Documents-1.rar

html

500446b2-1094-40fd-8e23-97419251a762.html

pdf

6_Technical_specifications.pdf

pdf

Bidders_help_Document_for_1.pdf

xls

BOQ_200416.xls

pdf

FAQs-IOCL-Online-EMD.pdf

pdf

Special_Instructions_to_t_2.pdf

pdf

Tender-Acceptance-Format.pdf

pdf

Tendernotice_1 (9).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders