| 1 | Dismantling of existing structures like culverts, bridges, retainingwalls, CC road and other structure comprising of masonry, cementconcrete, wood work, steel work, including T&P and scaffoldingwherever necessary, sorting the dismantled material, disposal ofunserviceable material and stacking the serviceable material with alllifts and lead of 50 metres as directed by Engineer |
| 2 | Providing and laying lean cement concrete 1:4:8 in Sub- base over aprepared sub-grade with coarse and fine aggregate conforming toIS: 383, the size of coarse aggregate not exceeding 25 mm,aggregate cement ratio not to exceed 15:1, aggregate gradationafter blending to be as per table 600-1, cement content not to beless than 150 kg/ cum, optimum moisture content to be determinedduring trial length construction, concrete strength not to be less than10 Mpa at 7 days, mixed in concrete mixer, laid manually,compacted with surface vibrator, finishing and curing complete asper clause 601, 112 of MoRT&H specification including all material,labour, machinery, lighting, guarding and maintenance of diversion |
| 3 | Providing and laying un-reinforced, dowel jointed, plain cementconcrete pavement over a prepared sub base with 43 grade cement,coarse and fine aggregate conforming to IS 383, maximum size ofcoarse aggregate not exceeding 25 mm, replacing cement by fly ashto the extent of 15% and sand by 10%, mixed in a batching andmixing plant as per approved mix design, transported to site, laidwith a fixed form or slip form paver, spread, compacted and finishedin a continuous operation including provision of contraction,expansion, construction and longitudinal joints, joint filler, separationmembrane, sealant primer, joint sealant, debonding strip, dowel bar,tie rod, admixtures as approved, curing compound, finishing to linesand grades as per drawing complete including all material, labour,machinery, lighting, guarding and maintenance of diversion. |
| 4 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,having thermal stability for hot & cold water supply including allCPVC plain & brass threaded fittings i/c fixing the pipe with clampsat 1.00 m spacing. This includes jointing of pipes & fittings with onestep CPVC solvent cement and testing of joints complete as perdirection of Engineer in-charge.Internal work - Exposed on wall |
| 5 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel : Please Enable Macros to View BoQ information |