| 1 | Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich to the work site/dump site. All the material at Sl. No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor. (De-Centralized Items Provided by the Contractor as per Estimate).Furthermore, the concerned contractor shall return the electrical materials from the work site to the store. |
| 2 | Cartage of PCC Pole 9 Mtr. long |
| 3 | Cable Jointing Kit O/D |
| 4 | Cable Jointing Kit 3x300 sqm I/D |
| 5 | Cartage of 33 KV XLPE 3x300sqmm (D/C) |
| 6 | ACSR Dog Conductor |
| 7 | Earthing |
| 8 | Extra Stay for Angle Location |
| 9 | Carriage of Other line material |
| 10 | Febrication & Erection of Single PCC Pole (9 Mtr Long) for 11/33 KV LT/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 11 | Febrication & Erection of Double PCC Pole (9 Mtr Long) for 11/33 KV LT/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 12 | Febrication & Erection of Four PCC Pole (9 Mtr Long) for 11/33 KV LT/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 13 | Cartage, Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 14 | Fixing of Extra Stay for Angle Locaion |
| 15 | Earthing of Pole by MS Earthing rod Complete as per RESSPO Norms. |
| 16 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials shall be provided by the contractor at his own cost. |
| 17 | Fixing of Cable Jointing Kit O/D as per Respo Norms |
| 18 | Fixing of Cable Jointing Kit 3x300 sqm I/D as per Respo Norms |
| 19 | Laying & Commissioning of HDD Method 33 KV XLPE 3x300sqmm (D/C) with Complete as per respo norms. |
| 20 | Laying, stringing, sagging & binding of Dog Conductors of 11/33 KV in 3 phase, 3 wire line with jumpering (where as required). |
| 21 | (Decentralized Items Provided/Fixing/Erection/Installation/Laying/Earthing by the Contractor as per Respo Norms). |
| 22 | Cross Arm Holding Clamp with Bolt & Nut |
| 23 | F-Bracket |
| 24 | Armour Rod with Ferrule |
| 25 | Number Plates with clamp for PCC Pole |
| 26 | Alluminium Binding Wire |
| 27 | Nut Bolts & Washer |
| 28 | Clamp with nuts & Bolts for Top Channel |
| 29 | Danger Board and clamp with bolt & nut |
| 30 | Concredting of Stay |
| 31 | GI Pipe 6\\" Dia |
| 32 | PG Clamp for Dog |
| 33 | E-Bracket for 33 KV |
| 34 | Aluminim Tape |
| 35 | C.I Pipe for Road Crossing |
| 36 | Dismantaling of HT Line |
| 37 | Cartage of Old & Use Materials site to store Please Enable Macros to View BoQ information |