| 1 | Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge. |
| 2 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m |
| 3 | Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge for 100 cum |
| 4 | Providing cement concrete (1:3:6) using 40m size B.H.G .C.B metal in foundation with watering ,curing including cost of materials,royalty & conveyance charges with all complete as per direction of Engineer-in-charge. |
| 5 | R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete .Column raft |
| 6 | Plinth |
| 7 | Column & Top beam |
| 8 | Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). |
| 9 | Brick work with fly ash. bricks 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ± 8 percent in cement mortar (1:6) in foundation and plinth |
| 10 | Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) brick masonary in super structure. |
| 11 | 16 mm thick cement plaster (1:6) over brick or stone masonary including punning |
| 12 | 12mm thick cement plaster (1:6) over brick work including cement punning and bitumen painting over top of wall |
| 13 | Provision for Grill gate & labour for fitting G.I and Grill door as per approved design included fitting |
| 14 | Enamel Painting two coats with any approved paint including cost of all labour, materials T & P with taxes, transportation etc all complete in Ground Floor.(including Primer ) |
| 15 | Priming one coat with Water bound Cement Primer of any approved primer including cost of all labour, materials T & P with taxes, transportation etc all complete. |
| 16 | Artistic Painting with approved paints, Art work / Picture story shall be painted on surface with non-toxic enamel / exterior gradebe painted on paint, painting the figures and shapes inattractive colours including base coat. Finishing & cleaning the space surrounding after completion of work. |
| 17 | Remove excavated materials from site by necanical means with loading and unloading the same within 5km away from site. |
| 18 | Wall painting 2 coats with Weather Coat of approved shade on new work to give an even shade incuding all cost of all materials, Labour, T&P , etc. |
| 19 | Providing and laying factory made chamferd edge cement concete paver block of required strength, thickness & size/shape made by table Vibrator method to attain superior smooth finish using PU or Equivalent moulds, Laid in required gray colour and Pattern over 80mm thick Compacted bed of Coarse Sand and proper embending/ laying of interlocking Paver bolcks into the sand bending layer through vibratory compacting by using plate vibrator , filling joint with fine sand and cutting of paver block as per required size/ pattern finishing and sweeping extra sand in footpath,park,lawns, drive ways, or light traffic parking and lane/road etc all complete as per manufactures specification and direction of Engg-in-charge. 80mm thick C.C. Paver block of M-40 grade with approved colour with approved colour design pattern etc. Complete. |
| 20 | Supplying, Fitting & fixing Cement Concrete Bnech at the side Play Ground including cost, conveyance & royalty of all materials etc.(Four Seater Concrete Chair) |
| 21 | Construction of Sign Board Please Enable Macros to View BoQ information |