| 1 | Replacing distribution lines and connections |
| 2 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 3 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. |
| 4 | OD271820/2025-2026:Supply of 100mm GI (M) pipe |
| 5 | OD271825/2025-2026:Supply of specials 5% for of GI pipe-100 mm |
| 6 | 100.98.236:Supply of PVC Pipe, 10kg/cm2, 90mm Dia. |
| 7 | OD273152/2025-2026:Supply of 3% Specials-PVC pipe-90 mm outer dia 10 kg |
| 8 | 100.98.237:Supply of PVC Pipe, 10kg/cm2, 110mm Dia. |
| 9 | OD273157/2025-2026:Supply of 3% Specials-PVC pipe-110 mm outer dia 10 kg |
| 10 | 18.12.8:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore |
| 11 | 100.12.9:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 100mm diameter nominal bore. |
| 12 | OD273136/2025-2026:Interconnection of proposed 80mm GI to Existing 90mm PVC |
| 13 | OD273140/2025-2026:Interconnection of proposed 100mm GI to Existing 110mm PVC |
| 14 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. |
| 15 | 100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes. |
| 16 | OD273367/2025-2026:Replacing Existing saddle and Providing 15mm (1/2 inch) house connection withfrom existing PVC / HDPE mains up to 110 mm dia., up to a length of 5m using20mm ( 1/2 inch ) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later editionand PP PN 16 Compression / GM / Brass specials viz. brass ferrule, brass hexagonalnipple, GM full way wheel valve, bend, MTA, FTA, couplers, PVC Service Saddle ofsuitable size etc. Please Enable Macros to View BoQ information |