| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:: All kinds of soil : |
| 2 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | viding, laying, spreading and compacting graded stone aggregate (sizerange 53 mm to 0.075 mm ) to wet mix macadam (WMM) specificationincluding premixing the material with water at OMC in mechanical mixplant, carriage of mixed material by tipper to site, for all leads & lifts,laying in uniform layers with mechanical paver finisher in sub- base / basecourse on well prepared surface and compacting with vibratory roller of 8to 10 tonne capacity to achieve the desired density, complete as perspecifications and directions of Engineer-in-Charge |
| 5 | Providing and applying tack coat using hot straight run bitumen of grade –VG-10, including heating the bitumen, spraying the bitumen withmechanically operated spray unit fitted on bitumen boiler, cleaning andpreparing the existing road surface as per specifications. On bitumen surface @ 0.50 Kg/sqm. |
| 6 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stonechippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and11.2 mm size respectively including a tack coat with hot straight runbitumen including consolidation with road roller of 6 to 9 tonne capacityetc. complete (tack coat to be paid for separately). With paving Asphalt grade VG-30 with no solvent. |
| 7 | Providing and laying seal coat of premixed fine aggregate (passing 2.36mm and retained on 180 micron sieve) with bitumen using 128 kg ofbitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cumof fine aggregate per 100 sqm of road surface including rolling andfinishing with road all complete. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 9 | Carriage of Material by Mechanical Transport including loading & unloading stacking at site complete. |
| 10 | Sand nominal size average lead 30 KM by MT. |
| 11 | Stone-Aggregates nominal size average lead 22 KM by MT. |
| 12 | Stone at an average lead 15 KM by MT. Please Enable Macros to View BoQ information |