| 1 | Quoted Price for Design, construction, supply, erection, commissioning of Sewage Treatment Plant (STP) with a capacity of 1.00 MLD at Manamadurai Municipality on Design, Build, Operate and Transfer (DBOT) Basis |
| 2 | GST (as applicable) |
| 3 | Quoted price for Operation & Maintenance of 1.00 MLD Capacity Sewage Treatment Plant (STP) and Interception and Diversion (I&D) Units and collection wells & pipeline for the period of 10 years of Operation & Maintenance in Manamadurai Municipality |
| 4 | GST (as applicable) |
| 5 | Design, construct & commissioning of 2.0 MLD STP with appropriate hydraulic design & piping for proposed Raw sewage inlet pipeline (with all connected pipes / specials, valves, and complete with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity etc, complete. |
| 6 | Construction of Inlet chamber including necessary G.I. penstock shutter arrangements at the Inlet and outlets (i.e. inlets to Manualscreen chamber) civil, mechanical,electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units and all connected works etc.complete. |
| 7 | Manual Screen Chambers with R.C.C Screen channels including manual medium Coarse and Fine screen with S.S, civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all connected works etc. complete |
| 8 | Design, Construct and commissioning of Grit Chamber with parshall plumeand Classifier , G.I. penstock gates both at Inlet and Outlet, RCC Walkways with G.I. hand rails, RCC staircase with G.I. hand rails, adjustable type SS velocity control wedges including all mechanical grit cleaning reciprocating/screw type SS classifiers, scrapper arm driving unit, organic return pumps and removal arrangement, with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on qualityand quantity and their mechanical standby units all etc, complete as per specification. |
| 9 | Design, construct, and commissioning of Primary Settling tank with Coarse bubble diffusers, pipes from Blowers to basin header, dropper submerged in tank, pipe grid in selector compartment, pipe grid submerged in the basin, submersible pumps, basin decanter mechanism, lifting arrangements for pumps including all G.I. penstock gates, RCC staircase with G.I hand rails, RCC walkway with G.I hand rails, with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc, complete as per specification. |
| 10 | Construction, Supply, Erection and Commissioning of Aeration Tank with fine bubble membrane diffusers, air supply pipes from Blowers to basin header, air supply dropper submerged in tank, air supply pipe grid in selector compartment and RCC walkway with G.I hand rails with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc, complete |
| 11 | Construction, Supply, Erection and Commissioning of Secondary Clarifier including clarifier mechanism, guide channel, spindle, shaft, Sludge handling pumps (Re circulation pump) to transfer the sludge to sludge holding tank and to Aeration tank with all accessories etc. complete, with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc, complete. |
| 12 | Construction of Sludge Drying bed including all connected civil and media filling as per required standards |
| 13 | Construction, Supply, Erection and Commissioning of Disinfection Tank complete, all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc, complete. |
| 14 | Design, construct, commissioning of Air blower room including supply, erect and commissioning of High speed turbo air blowers suitable to deliver oil free air for the cyclic Aeration Tank,Equalisation Tank system, VFD control system, lifting arrangements, acoustic control with required air flow pipes, air flow meter, pressure gauges, valves, Air Blowers with accessories, electro mechanical & instrumentation accessories etc.,complete as per specification |
| 15 | Providing Yard Lighting system, Street lighting system, as per specification for entire plant with all accessories, MCB, Switches, luminaries, street lighting, including supply and fixing of poles and tower light of 10m height with necessary lamp twin fitting 8 nos. including foundation work, cabling controlling etc. complete, and street light fitting, cables, S.S control panel etc complete etc complete as per specification |
| 16 | Site Clearence, Earth filling, levelling, Landscaping and plantation of tree saplings with all connected works etc complete as per specification |
| 17 | Supply & Laying of pipe line for distribution treated sewage disposal From STP to the near by water body as per TNPCB norms with NGT guidelines |
| 18 | construction of office room cum laboratory, supply of Furniture for office, complete as per specification |
| 19 | MCC Panel (motor control center) to accommodate all the drive units with cabling, glanding within the STP Compartmental, design Indoor wall mounted type with top entry for cable the internal components eitherSiemen / GE Shall be provided with 1 No. Energy meter |
| 20 | Design, construct, commissioning of Chlorinator room, Chlorine gas system including chlorinator etc complete, pure water sump, booster pumps, piping, Chlorinators, Chlorine cylinders, safety sensor with lifting arrangements and Supply & fixing of suitable capacity Chlorinator with discharge submersible booster pumps, pipelines with specials with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc, complete.as per specifications |
| 21 | Supply of equipments/instruments for laboratory including all the equipment’s, instruments & chemicals required to test all inlet and outlet quality parameters, process monitoring parameters, glassware,necessary software & hard ware for analysis, data storage & report generation as per specification Item Rate BoQ BoQ_Ver4.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Name of Work:Name of Work:Design, construction, supply, erection, commissioning, Sewage Treatment Plant (STP) with a capacity of 1.00 MLD at Manamadurai Municipality along with Ten years of Operation & Maintenance on Design, Build, Operate and Transfer (DBOT) Basis Contract No: DMA/848/2025-SBM1 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. O and M Period Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Fixed(A)Rs. P Variable(B)Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 22 | 1styear |
| 23 | 2ndyear |
| 24 | 3rdyear |
| 25 | 4thyear |
| 26 | 5thyear |
| 27 | 6thyear |
| 28 | 7thyear |
| 29 | 8thyear |
| 30 | 9thyear |
| 31 | 10thyear Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |